SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
Attachment Number List of Documents, Exhibits, and other Attachments
1 General Decision CA20210012- 04/23/2021
2 Section C – Statement of Work
3 Section C – Revised Specifications 5/26/2021
(END OF SECTION)
Amendment No. 0001
Number SECTION TITLE
TABLE OF CONTENTS
DIVISION 1 - GENERAL REQUIREMENTS
SECTION 01100 - SUMMARY
SECTION 01310 - PROJECT MANAGEMENT AND COORDINATION
SECTION 01332 - SUBMITTAL PROCEDURES
SECTION 01524 - CONSTRUCTION WASTE MANAGEMENT
SECTION 01731 - CUTTING AND PATCHING
SECTION 01732 - SELECTIVE DEMOLITION
SECTION 01770 - CLOSEOUT PROCEDURES
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
SECTION 061600 - SHEATHING
SECTION 061516 – WOOD ROOF DECKING
DIVISION 07 – ROOFING
SECTION 073113 - ASPHALT SHINGLES
SECTION 075419 – POLYVINYL-CHLORIDE (PVC) ROOFING
SECTION 076200 - COPPER FLASHING AND TRIM
Attachment No. 3
SECTION 01100 - SUMMARY
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes the following:
1. Work covered by the Contract Documents.
2. Work under other contracts.
3. Use of premises.
4. Government occupancy requirements.
5. Specification formats and conventions.
1.2
WORK COVERED BY CONTRACT DOCUMENTS
A. Project Identification: PIEDRAS BLANCAS COAST GUARD UNITS
ROOF REPLACEMENT.
1. Project Location: 15950 Cabrillo Highway, San Simeon, CA 93452 at the Piedras Blan-cas Light House.
B. The Work consists of the following:
1. The Work includes:
a The Work includes Furnishing labor, equipment, supplies, and materials, to remove, repair and replace all deteriorated roofing components material from the two Coast Guard Units, a total of 8,600 square feet.
b This work shall include:
1 Replace any deteriorated Plywood Sheathing, Slip Sheeting, Felt, and Wood-en decking. The Contractor shall include a cost for the removal of the existing damaged plywood decking and replacement with new material of the type and grade as the existing decking. This cost will be used to increase or de-crease the contractor price depending on the number of sheets used. At this time it is estimated that 600 square feet of existing sheathing and decking will be needed for the completion of the project.
f. All waste materials created by the repair or removed from the roof due to damage or condition shall become the property of the contractor unless otherwise specified.
All waste materials shall be removed from the site in accordance with Specification
Section 01524 Construction Waste Management.
C. Project will be constructed under a construction contract.
1. Project is designed to comply with a Certification Level according to the U.S. Green
Building Council's Leadership in Energy & Environmental Design (LEED) Rating Sys-tem, as specified in Division 1 Section "LEED Requirements."
D. Project will be constructed under a single prime contract.
1.3 WORK UNDER OTHER CONTRACTS
A. Cooperate fully with separate contractors so work on those contracts may be carried out smooth-ly, without interfering with or delaying work under this Contract. Coordinate the Work of this
Contract with work performed under separate contracts.
1.4 USE OF PREMISES
A. Contractor shall have limited use of premises for construction operations.
B. Schedule operations so that Work is conducted during regular office hours which are 7:30 AM to 4:30 PM, Monday through Friday.
C. Schedule and sequence operations necessary to complete the work, including coordination with other crafts relative to the Contractor's requirements. Schedule Work in such manner as to avoid delays in overall construction and permit proper installation of work.
D. Use of Site: Limit use of premises to work areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Limits: Confine constructions operations to:
2. Government Occupancy: Allow for Government occupancy of Project site and use by the public. Government personnel will be continuously occupying areas of the building immediately adjacent to the work area. Conduct work in a manner that will minimize needs for disruption of normal Government operations. Provide minimum 72 hours ad-vance notice to Contracting Officer of activities that will impact normal Government op-erations. Secure Contracting Officer's written approval of activities that will impact nor-mal Government operations to avoid delays in overall construction and permit proper in-stallation or work.
3. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government, Government employees, and emergency vehicles at all times.
Do not use these areas for parking or storage of materials unless the Contractor is given prior approval from the contracting officer.
a. Schedule deliveries to minimize use of driveways and entrances.
b. Schedule deliveries to minimize space and time requirements for storage of mate-rials and equipment on-site.
E. Use of Existing Building: Maintain existing building in a weathertight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.
F. Utilities: Service interruptions will not be allowed during regular office hours. The Contractor shall provide their own power, restroom services, and any other needed utilities to perform the work separate from the BLM building services.
G. All State County and City Permits and Licenses shall be the contractors responsibility
1.5 GOVERNMENT OCCUPANCY REQUIREMENTS
A. Full Government Occupancy: Government will occupy site and existing buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Gov-ernment day-to-day operations. Maintain existing exits, unless otherwise indicated.
1. Maintain access to existing walkways, corridors, and other adjacent occupied or used fa-cilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government and authorities having jurisdiction.
1.6 SPECIFICATION FORMATS AND CONVENTIONS
A. Specification Format: The Specifications are organized into Divisions and Sections using the
16-division format and CSI/CSC's "MasterFormat" numbering system.
1. Division 1: Sections in Division 1 govern the execution of the Work of all Sections in the Specifications.
B. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.
These conventions are as follows:
1. Abbreviated Language: Language used in the Specifications and other Contract Docu-ments is abbreviated. Words and meanings shall be interpreted as appropriate. Words im-plied, but not stated, shall be inferred as the sense requires. Singular words shall be in-terpreted as plural, and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates.
2. Imperative mood and streamlined language are generally used in the Specifications. Re-quirements expressed in the imperative mood are to be performed by Contractor. Occa-sionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted.
a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
C. Terminology: In Divisions 2 through 16 specification sections, all references to “Owner” shall be replaced with the term “Government” or “Contracting Officer” (when referring to the person acting for the Government). All references to “Architect” shall be replaced with the term “Con-tracting Officer”.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01100
SECTION 01310 - PROJECT MANAGEMENT AND COORDINATION
A. This Section includes administrative provisions for coordinating construction operations on Pro-ject including, but not limited to, the following:
1. Project meetings.
2. Requests for Interpretation (RFIs).
B. See Division 1 Section "Execution Requirements" for procedures for coordinating general in-stallation and field-engineering services, including establishment of benchmarks and control points.
1.2 DEFINITIONS
A. RFI: Request from Contractor seeking interpretation or clarification of the Contract Docu-ments.
1.3 COORDINATION
A. Coordination: Coordinate construction operations included in different Sections of the Specifi-cations to ensure efficient and orderly installation of each part of the Work. Coordinate con-struction operations, included in different Sections that depend on each other for proper installa-tion, connection, and operation.
1. Schedule construction operations in sequence required to obtain the best results where in-stallation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components with other contractors to ensure maxi-mum accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including mechanical and electrical.
B. Prepare memoranda for distribution to each party involved, outlining special procedures re-quired for coordination. Include such items as required notices, reports, and list of attendees at meetings.
1. Prepare similar memoranda for Contracting Officer and separate contractors if coordina-tion is needed.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative proce-dures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not lim-ited to, the following:
1. Preparation of Contractor's Construction Schedule.
2. Preparation of the Schedule of Values.
3. Installation and removal of temporary facilities and controls.
4. Delivery and processing of submittals.
5. Progress meetings.
6. Preinstallation conferences.
7. Project closeout activities.
8. Startup and adjustment of systems.
9. Project closeout activities.
1.4 SUBMITTALS
A. The contractor shall submit a project schedule which details estimated dates for project mile-stones:
a. Mobilization date
b. Beginning and ending of demo for both buildings
c. Beginning and ending of construction for both buildings
d. Project completion
1.5 PROJECT MEETINGS
A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise indi-cated.
1. Attendees: Inform participants and others involved, and individuals whose presence is re-quired, of date and time of each meeting. Notify Contracting Officer and Architect of scheduled meeting dates and times.
2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.
3. Minutes: Record significant discussions and agreements achieved. Distribute the meet-ing minutes to everyone concerned, including Contracting Officer and COR, within three days of the meeting.
B. Preconstruction Conference: Schedule a preconstruction conference before starting construc-tion, at a time convenient to Contracting Officer and Architect, but no later than 15 days after execution of the Agreement. Hold the conference at Project site or another convenient loca-tion. Conduct the meeting to review responsibilities and personnel assignments, review required work, project drawings, specifications, construction schedules, payroll, payments, and adminis-trative provisions of the Contract. Be prepared to summarize and explain procedures planned for the project and present specified preconstruction submittals.
1. Attendees: Authorized representatives of Government, Architect, and their consultants;
Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work. The mechanical and electrical subcontractors attendance will be required.
2. Agenda: Discuss items of significance that could affect progress, including the follow-ing:
a. Tentative construction schedule.
b. Phasing.
c. Critical work sequencing and long-lead items.
d. Designation of key personnel and their duties.
e. Procedures for processing field decisions and Change Orders.
f. Procedures for RFIs.
g. Procedures for testing and inspecting.
h. Procedures for processing Applications for Payment.
i. Distribution of the Contract Documents.
j. Submittal procedures.
k. Preparation of Record Documents.
l. Use of the premises and existing building.
m. Work restrictions.
n. Government occupancy requirements.
o. Responsibility for temporary facilities and controls.
p. Construction waste management and recycling.
q. Parking availability.
r. Office, work, and storage areas.
s. Equipment deliveries and priorities.
t. First aid.
u. Security.
v. Progress cleaning.
w. Working hours.
C. Pre-installation Conferences: Conduct a pre-installation conference at Project site before each construction activity that requires coordination with other construction.
1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and in-stallations that have preceded or will follow, shall attend the meeting. Advise Contracting
Officer of scheduled meeting dates.
2. Agenda: Review progress of other construction activities and preparations for the particu-lar activity under consideration, including requirements for the following:
a. The Contract Documents.
b. Options.
c. Related RFIs.
d. Related Change Orders.
e. Purchases.
f. Deliveries.
g. Submittals.
h. Review of mockups.
i. Possible conflicts.
j. Compatibility problems.
k. Time schedules.
l. Weather limitations.
m. Manufacturer's written recommendations.
n. Warranty requirements.
o. Compatibility of materials.
p. Acceptability of substrates.
q. Temporary facilities and controls.
r. Space and access limitations.
s. Regulations of authorities having jurisdiction.
t. Testing and inspecting requirements.
u. Installation procedures.
v. Coordination with other work.
w. Required performance results.
x. Protection of adjacent work.
y. Protection of construction and personnel.
3. Record significant conference discussions, agreements, and disagreements, including re-quired corrective measures and actions.
4. Reporting: Distribute minutes of the meeting to each party present and to parties who should have been present.
5. Do not proceed with installation if the conference cannot be successfully concluded. Ini-tiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.
D. Progress Meetings: Conduct progress meetings at weekly intervals. Hold the meetings at the project site. Coordinate dates of meetings with preparation of payment requests. Additional pro-gress meetings may be requested by either the Contracting Officer or Contractor.
1. Attendees: In addition to representatives of Government, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coor-dination, or performance of future activities shall be represented at these meetings. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.
2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as ap-propriate to status of Project.
a. Contractor's Construction Schedule: Review progress since the last meeting. De-termine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's Construction Schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so.
Discuss whether schedule revisions are required to ensure that current and subse-quent activities will be completed within the Contract Time.
1) Review schedule for next period.
b. Review present and future needs of each entity present, including the following:
1) Interface requirements.
2) Sequence of operations.
3) Status of submittals.
4) Deliveries.
5) Off-site fabrication.
6) Access.
7) Site utilization.
8) Temporary facilities and controls.
9) Work hours.
10) Hazards and risks.
11) Progress cleaning.
12) Quality and work standards.
13) Status of correction of deficient items.
14) Field observations.
15) RFIs.
16) Status of proposal requests.
17) Pending changes.
18) Status of Change Orders.
19) Pending claims and disputes.
20) Documentation of information for payment requests.
3. Minutes: Contracting Officer will record and distribute to Contractor the meeting minutes.
4. Reporting: Distribute minutes of the meeting to each party present and to parties who should have been present.
a. Schedule Updating: Revise Contractor's Construction Schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue re-vised schedule concurrently with the report of each meeting.
1.6 REQUESTS FOR INTERPRETATION (RFIs)
A. Procedure: Immediately on discovery of the need for interpretation of the Contract Documents, and if not possible to request interpretation at Project meeting, prepare and submit an RFI in the form specified.
1. RFIs shall originate with Contractor. RFIs submitted by entities other than Contractor will be returned with no response.
2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.
B. Content of the RFI: Include a detailed, legible description of item needing interpretation and the following:
1. Project name.
2. Date.
3. Name of Contractor.
4. Name of Contracting Officer and Construction Manager.
5. RFI number, numbered sequentially.
6. Specification Section number and title and related paragraphs, as appropriate.
7. Drawing number and detail references, as appropriate.
8. Field dimensions and conditions, as appropriate.
9. Contractor's suggested solution(s). If Contractor's solution(s) impact the Contract Time or the Contract Sum, Contractor shall state impact in the RFI.
10. Contractor's signature.
11. Attachments: Include drawings, descriptions, measurements, photos, Product Data, Shop
Drawings, and other information necessary to fully describe items needing interpretation.
C. Hard-Copy RFIs: All RFI’s Shall be submitted in writing to the Contracting Officer.
1. Identify each page of attachments with the RFI number and sequential page number.
D. Contracting Officer's Action: Contracting Officer will review each RFI, determine action re-quired, and return it. Allow 21 calendar days for Contracting Officer's response for each RFI.
RFIs received after 1:00 p.m. will be considered as received the following working day.
1. The following RFIs will be returned without action:
a. Requests for approval of submittals.
b. Requests for approval of substitutions.
c. Requests for coordination information already indicated in the Contract Docu-ments.
d. Requests for adjustments in the Contract Time or the Contract Sum.
e. Requests for interpretation of Contracting Officer's actions on submittals.
f. Incomplete RFIs or RFIs with numerous errors.
2. Contracting Officer's action may include a request for additional information, in which case Contracting Officer's time for response will start again.
E. On receipt of Contracting Officer's action, update the RFI log and immediately distribute the
RFI response to affected parties. Review response and notify Contracting Officer within seven days if Contractor disagrees with response.
F. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number.
Submit log weekly to the Contracting Officer and Include the following:
1. Project name.
2. Name and address of Contractor.
3. Name and address of Contracting Officer.
4. RFI number including RFIs that were dropped and not submitted.
5. RFI description.
6. Date the RFI was submitted.
7. Date Contracting Officer's response was received.
8. Identification of related bilateral or unilateral modifications, extensions, and changes in scope, as appropriate.
PART 3 - EXECUTION (Not Used)
END OF SECTION 01310
SECTION 013320 - CONSTRUCTION SUBMITTAL PROCEDURES
A. This section covers construction submittals for design-build contracts used to demonstrate con-formance with Final Accepted Design to Contract requirements. Submit design submittals in accordance with Section 01331 DESIGN SUBMITTAL PROCEDURES.
A. Contract Clauses "FAR 52.236-5, Material and Workmanship" paragraph (b) and "FAR 52.236-
21, Specifications and Drawings for Construction," paragraphs (d), (e), and (f) apply to all
"submittals."
B. Approving Authority: Person authorized to approve submittal.
C. Work: As used in this section, on- and off-site construction required by Contract Documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.3 SUBMITTAL DESCRIPTIONS
A. Submittal requirements are specified within technical sections. Submittals are identified by submittal titles as indicated in following paragraphs.
B. Preconstruction Submittals
1. Certificates of insurance.
2. Relevant City County and State Business Licenses.
3. List of proposed subcontractors.
4. List of proposed products.
5. Construction Progress Schedule.
6. Submittal listing.
7. Health and safety plan.
8. Work plan.
9. Quality control plan.
10. Environmental protection plan.
C. Product Data:
1. Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and bro-chures illustrating size, physical appearance and other characteristics of materials or equipment for some portion of the work.
2. Samples of warranty language when Contract requires extended product warranties.
D. Samples file:///C:/Users/SISGML/MASTERS/NEWDB/prntdata/01331.sec
1. Physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of material or product and establish standards by which Work can be judged.
2. Color samples from manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for project.
3. Field samples and mock-ups constructed on project site establish standards by which ensuring work can be judged. Includes assemblies or portions of assemblies to be
4. incorporated into project and those which will be removed at conclusion of work.
E. Certificates:
1. Statements signed by responsible officials of product or system manufacturer, or material provider, attesting that product, system, or material meets specified requirements. Date statement after award of project contract and clearly name project.
2. Document required of Contractor, or of supplier, installer or subcontractor through Con-tractor, to further quality of orderly progression of portion of work by documenting pro-cedures, acceptability of methods or personnel qualifications.
3. Confined space entry permits.
F. Manufacturer's Instructions: Preprinted material describing installation of product, system, or material, including special notices and Material Safety Data sheets concerning impedances, haz-ards and safety precautions.
G. Operation and Maintenance Data: Manufacturer-furnished, or from system provider, to equip-ment operating and maintenance personnel. Data is needed by operating and maintenance per-sonnel for safe and efficient operation, maintenance and repair of item.
H. Closeout Submittals: Documentation to record compliance with technical or administrative re-quirements or to establish administrative mechanism.
1.4 SUBMITTALS
A. Typically, approval of submittals will be required. Approval actions will either be accomplished by QC certification and Designer of Record (DOR) approval or by QC certification with DOR certification and Government approval, depending on where submittal is located in RFP.
B. Some submittals will be for information only.
C. Submit Preconstruction Submittals requirement for submittal listing for approval.
D. Submittals Reserved for Government Approval:
1. Government approval will be required for submittals identified in RFP specification sections.
E. Alternative Construction Submittal: Construction submittals may be combined with design submittals. Refer to Section 01331 DESIGN SUBMITTAL PROCEDURES for requirements.
1.5 SUBMITTAL LISTING
A. Maintain listing of submittals as work progresses. Do not change data prepared by Designer of
Record.
B. Submittal Listing: Submit completed submittal listing with quality control plan and project schedule as specified. Do not change data as accepted by Government. Verify that submittals required for project are listed and add missing submittals. Provide following:
1. Contractor Submit Date: Scheduled date for approving authority to receive submittals.
2. Contractor Approval Date: Date Contractor needs approval of submittal.
3. Contractor Material: Date that Contractor needs material delivered to contractor control.
C. Use of Submittal Listing: Update following fields in Government-accepted submittal listing.
1. Transmittal Number: Contractor-assigned list of consecutive numbers.
2. Action Code: Date of action used to record Contractor's review when forwarding sub-mittals to QC.
3. List date of submittal transmission.
Amendment No. 0001 file:///C:/Users/SISGML/MASTERS/NEWDB/prntdata/01331.sec
4. List date approval received.
D. Approving Authority Use of Submittal Listing: Update “date of submittal receipt” and “date re-turned to Contractor” fields in Government-accepted submittal listing.
E. Contractor Action Code and Action Code: Use following as entries, others may be prescribed by Transmittal Form:
1. NR - Not Received.
2. AN - Approved as noted.
3. A – Approved.
4. RR - Disapproved, Revise, and Resubmit.
F. Copies Delivered to Government: Deliver one copy of submittal listing updated by Contractor to Government with each invoice request. Deliver in electronic format, unless paper copy is re-quested by Contracting Officer.
1.6 PROCEDURES FOR SUBMITTALS
A. Reviewing, Certifying, Approving Authority:
1. QC organization shall be responsible for reviewing and certifying that submittals are in compliance with Contract requirements. This shall be the Contractors responsibility.
2. Construction submittals for approval will be divided into two different actions; one action requiring QC certification or DOR approval, another action requiring QC certification or
DOR certification as Submittal Reviewer and Government approval. Contracting Officer will be approving authority for submittals or will request of DOR such approval.
3. This proposed project is a repair of the existing roof structure and therefor does not re-quire a DOR approval.
B. Contractor's Responsibilities:
1. Determine and verify field measurements, materials, field construction criteria; review each submittal; and check and coordinate each submittal with requirements of Work and
Contract Documents.
2. Transmit submittals to the Contracting Officer in accordance with schedule and to pre-vent delays in Work, delays to Government, or delays to separate contractors.
3. Correct and resubmit submittal as directed by approving authority. When resubmitting disapproved transmittals or transmittals noted for resubmittal, provide copy of previously submitted transmittal including reviewer comments for use by approving authority. Di-rect specific attention in writing or on resubmitted submittal, to revisions not requested by approving authority on previous submissions.
4. Furnish additional copies of submittal when requested by Contracting Officer, not to ex-ceed 5 copies per submittal.
5. Complete work which must be accomplished as basis of submittal in time to allow sub-mittal to occur as scheduled.
6. Ensure no work has begun until submittals for work have been returned as "approved," or
"approved as noted", except to extent that portion of work must be accomplished as basis of submittal.
7.
C. Government's Responsibilities: When approving authority is Contracting Officer, Government will:
1. Note date on which submittal was received from QC Manager, on each submittal for which Contracting Officer is approving authority.
2. Review submittals for approval within scheduling period specified and only for con-formance with project design concepts and compliance with Contract Documents.
3. Identify returned submittals with one of actions specified.
D. Actions Possible: Submittals will be returned with one of following notations:
1. Submittals marked “not reviewed” will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by
Contractor, or is not complete. Submittal marked “not reviewed” will be returned with
2. explanation of reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
3. Submittals marked “approved” “approved as submitted” authorize Contractor to proceed with work covered.
4. Submittals marked “approved as noted” or “approval except as noted; resubmission not required” authorize Contractor to proceed with work as noted provided Contractor takes no exception to notations.
5. Submittals marked “revise and resubmit” or “disapproved” indicate submittal is incom-plete or does not comply with design concept or requirements of Contract Documents and shall be resubmitted with appropriate changes. No work shall proceed for this item until resubmittal is approved.
1.7 QUANTITY OF SUBMITTALS
A. Product Data and Manufacturer's Instructions: Submit product data in compliance with quantity requirements specified for shop drawings.
B. Samples:
1. Submit two samples, or two sets of samples showing range of variation, of each required item. One approved sample or set of samples will be retained by approving authority and one will be returned to Contractor.
2. Submit one sample panel. Include components listed in technical section or as directed.
3. Submit one sample installation, where directed.
4. Submit one sample of non-solid materials.
C. Preconstruction and Closeout Submittals: Unless otherwise specified, submit administrative submittals in compliance with quantity requirements specified for shop drawings.
PART 2 - PRODUCTS - Not Used
PART 3 - EXECUTION - Not Used.
END OF SECTION 01332
SECTION 01524 - CONSTRUCTION WASTE MANAGEMENT
A. This Section includes administrative and procedural requirements for the following:
1. Salvaging nonhazardous demolition and construction waste.
2. Recycling nonhazardous demolition and construction waste.
3. Disposing of nonhazardous demolition and construction waste.
B. See Division 1 Section "Selective Demolition" for disposition of waste resulting from partial demolition of buildings, structures, and site improvements, and for disposition of hazardous waste.
A. Construction Waste: Building and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging.
B. Demolition Waste: Building and site improvement materials resulting from demolition or selec-tive demolition operations.
C. Disposal: Removal off-site of demolition and construction waste and subsequent sale, recy-cling, reuse, or deposit in landfill or incinerator acceptable to authorities having jurisdiction.
D. Recycle: Recovery of demolition or construction waste for subsequent processing in prepara-tion for reuse.
E. Salvage: Recovery of demolition or construction waste and subsequent sale or reuse in another facility.
F. Salvage and Reuse: Recovery of demolition or construction waste and subsequent incorpora-tion into the Work.
1.3 SUBMITTALS
A. Waste Management Plan: Submit 3 copies of plan within 7 days of date established for the No-tice to Proceed.
B. Records of Donations: Indicate receipt and acceptance of salvageable waste donated to individ-uals and organizations. Indicate whether organization is tax exempt.
C. Records of Sales: Indicate receipt and acceptance of salvageable waste sold to individuals and organizations. Indicate whether organization is tax exempt.
D. Recycling and Processing Facility Records: Indicate receipt and acceptance of recyclable waste by recycling and processing facilities licensed to accept them. Include manifests, weight tick-ets, receipts, and invoices.
E. Landfill and Incinerator Disposal Records: Indicate receipt and acceptance of waste by landfills and incinerator facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.
1.4 QUALITY ASSURANCE
A. Waste Management Conference: Conduct conference at The Project Site.
1.5 WASTE MANAGEMENT PLAN
A. General: Develop plan consisting of waste identification and waste reduction work plan[ Include separate sections in plan for demolition and construction waste. Indicate estimated quantities by weight or volume, but use same units of measure throughout waste management plan.
B. Waste Identification: Indicate anticipated types and quantities of demolition and construction waste generated by the Work. Include estimated quantities and assumptions for estimates.
C. Waste Reduction Work Plan: List each type of waste and whether it will be salvaged, recycled, or disposed of in landfill or incinerator. Include points of waste generation, total quantity of each type of waste, quantity for each means of recovery, and handling and transportation proce-dures.
1. Salvaged Materials for Reuse: For materials that will be salvaged and reused in this Pro-ject, describe methods for preparing salvaged materials before incorporation into the
Work.
2. Salvaged Materials for Sale: For materials that will be sold to individuals and organiza-tions, include list of their names, addresses, and telephone numbers.
3. Salvaged Materials for Donation: For materials that will be donated to individuals and organizations, include list of their names, addresses, and telephone numbers.
4. Recycled Materials: Include list of local receivers and processors and type of recycled materials each will accept. Include names, addresses, and telephone numbers.
5. Disposed Materials: Indicate how and where materials will be disposed of. Include name, address, and telephone number of each landfill and incinerator facility.
6. Handling and Transportation Procedures: Include method that will be used for separating recyclable waste including sizes of containers, container labeling, and designated location on Project site where materials separation will be located.
PART 3 - EXECUTION
3.1 PLAN IMPLEMENTATION
A. General: Implement waste management plan as approved by Contracting Officer. Provide han-dling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract.
B. Waste Management Coordinator: Engage a waste management coordinator to be responsible for implementing, monitoring, and reporting status of waste management work plan. Coordina-tor shall be present at Project site full time for duration of Project.
C. Training: Train workers, subcontractors, and suppliers on proper waste management proce-dures, as appropriate for the Work occurring at Project site.
1. Distribute waste management plan to everyone concerned within three days of submittal return.
2. Distribute waste management plan to entities when they first begin work on-site. Review plan procedures and locations established for salvage, recycling, and disposal.
D. Site Access and Temporary Controls: Conduct waste management operations to ensure mini-mum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
1. Designate and label specific areas on Project site necessary for separating materials that are to be salvaged, recycled, reused, donated, and sold.
2. Comply with Division 1 Section "Temporary Facilities and Controls" for controlling dust and dirt, environmental protection, and noise control.
3.2 SALVAGING DEMOLITION WASTE
A. Salvaged Items for Reuse in the Work:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Install salvaged items to comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make items functional for use indicated.
B. Salvaged Items for Sale and Donation on Project site.
C. Salvaged Items for Government Use:
3. Store items in a secure area until delivery to Government.
4. Transport items to Government storage area on-site.
5. Protect items from damage during transport and storage.
3.3 RECYCLING DEMOLITION AND CONSTRUCTION WASTE, GENERAL
A. General: Recycle paper and beverage containers used by on-site workers.
B. Procedures: Separate recyclable waste from other waste materials, trash, and debris. Separate recyclable waste by type at Project site to the maximum extent practical.
1. Provide appropriately marked containers or bins for controlling recyclable waste until they are removed from Project site. Include list of acceptable and unacceptable materials at each container and bin.
a. Inspect containers and bins for contamination and remove contaminated materials if found.
2. Stockpile processed materials on-site without intermixing with other materials. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.
3. Stockpile materials away from construction area. Do not store within drip line of remaining trees.
4. Store components off the ground and protect from the weather.
5. Remove recyclable waste off Government property and transport to recycling receiver or processor.
3.4 RECYCLING DEMOLITION WASTE
A. Wood Materials: Sort and stack members according to size, type, and length. Separate lumber, engineered wood products, panel products, and treated wood materials.
B. Metals: Separate metals by type.
1. Structural Steel: Stack members according to size, type of member, and length.
2. Remove and dispose of bolts, nuts, washers, and other rough hardware.
C. Asphalt Shingle Roofing: Separate organic and glass-fiber asphalt shingles and felts. Remove and dispose of nails, staples, and accessories.
3.5 RECYCLING CONSTRUCTION WASTE
A. Packaging:
1. Cardboard and Boxes: Break down packaging into flat sheets. Bundle and store in a dry location.
2. Polystyrene Packaging: Separate and bag materials.
3. Pallets: As much as possible, require deliveries using pallets to remove pallets from Pro-ject site. For pallets that remain on-site, break down pallets into component wood pieces and comply with requirements for recycling wood.
4. Crates: Break down crates into component wood pieces and comply with requirements for recycling wood.
B. Site-Clearing Wastes: Chip brush, branches, and trees at landfill facility.
C. Wood Materials:
1. Clean Cut-Offs of Lumber: Grind or chip into small pieces.
2. Clean Sawdust: Bag sawdust that does not contain painted or treated wood.
D. Gypsum Board: Stack large clean pieces on wood pallets and store in a dry location.
1. Clean Gypsum Board: Grind scraps of clean gypsum board using small mobile chipper or hammer mill. Screen out paper after grinding.
3.6 DISPOSAL OF WASTE
A. General: Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste materials from Project site and legally dispose of them in a landfill or incinerator ac-ceptable to authorities having jurisdiction.
1. Except as otherwise specified, do not allow waste materials that are to be disposed of ac-cumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
B. Burning: Do not burn waste materials.
C. Disposal: Transport waste materials off Government property and legally dispose of them.
END OF SECTION 01524
SECTION 01731 - CUTTING AND PATCHING
A. This Section includes procedural requirements for cutting and patching.
B. See Divisions 2 through 16 Sections for specific requirements and limitations applicable to cut-ting and patching individual parts of the Work.
C. See Division 7 Section "Through-Penetration Firestop Systems" for patching fire-rated con-struction.
1.2 SUBMITTALS
A. Cutting and Patching Proposal: Submit a proposal describing procedures at least 10 days before the time cutting and patching will be performed, requesting approval to proceed. Include the fol-lowing information:
1. Extent: Describe cutting and patching, show how they will be performed, and indicate why they cannot be avoided.
2. Changes to In-Place Construction: Describe anticipated results. Include changes to struc-tural elements and operating components as well as changes in building's appearance and other significant visual elements.
3. Products: List products to be used and firms or entities that will perform the Work.
4. Dates: Indicate when cutting and patching will be performed.
5. Utility Services and Mechanical/Electrical Systems: List services/systems that cutting and patching procedures will disturb or affect. List services/systems that will be relocat-ed and those that will be temporarily out of service. Indicate how long services/systems will be disrupted.
6. Structural Elements: Where cutting and patching involve adding reinforcement to struc-tural elements, submit details and engineering calculations showing integration of rein-forcement with original structure.
7. Government Approval: Obtain approval of cutting and patching proposal before cutting and patching. Approval does not waive right to later require removal and replacement of unsatisfactory work.
1.3 QUALITY ASSURANCE
A. Structural Elements: Do not cut and patch structural elements in a manner that could change their load-carrying capacity or load-deflection ratio.
B. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety.
C. Miscellaneous Elements: Do not cut and patch miscellaneous elements or related components in a manner that could change their load-carrying capacity, that results in reducing their capac-ity to perform as intended, or that results in increased maintenance or decreased operational life or safety.
D. Visual Requirements: Do not cut and patch construction in a manner that results in visual evi-dence of cutting and patching. Do not cut and patch construction exposed on the exterior or in occupied spaces in a manner that would, in Contracting Officer's opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner.
1.4 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during cutting and patching operations, by methods and with materials so as not to void existing warranties.
PART 2 - PRODUCTS
2.1 MATERIALS
A. General: Comply with requirements specified in other Sections.
B. In-Place Materials: Use materials identical to in-place materials. For exposed surfaces, use ma-terials that visually match in-place adjacent surfaces to the fullest extent possible.
1. If identical materials are unavailable or cannot be used, use materials that, when installed, will match the visual and functional performance of in-place materials.
3.1 EXAMINATION
A. Examine surfaces to be cut and patched and conditions under which cutting and patching are to be performed.
1. Compatibility: Before patching, verify compatibility with and suitability of substrates, including compatibility with in-place finishes or primers.
2. Proceed with installation only after unsafe or unsatisfactory conditions have been cor-rected.
3.2 PREPARATION
A. Temporary Support: Provide temporary support of Work to be cut.
B. Protection: Protect in-place construction during cutting and patching to prevent damage. Pro-vide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.
C. Adjoining Areas: Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.
D. Existing Utility Services and Mechanical/Electrical Systems: Where existing services/systems are required to be removed, relocated, or abandoned, bypass such services/systems before cut-ting to prevent interruption to occupied areas.
3.3 PERFORMANCE
A. General: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time, and complete without delay.
1. Cut in-place construction to provide for installation of other components or performance of other construction, and subsequently patch as required to restore surfaces to their orig-inal condition.
B. Cutting: Cut in-place construction by sawing, drilling, breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or ad-joining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations.
1. In general, use hand or small power tools designed for sawing and grinding, not hammer-ing and chopping. Cut holes and slots as small as possible, neatly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.
2. Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces.
3. Concrete or Masonry: Cut using a cutting machine, such as an abrasive saw or a dia-mond-core drill.
4. Excavating and Backfilling: Comply with requirements in applicable Division 2 Sections where required by cutting and patching operations.
5. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit to prevent en-trance of moisture or other foreign matter after cutting.
6. Proceed with patching after construction operations requiring cutting are complete.
C. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other Work. Patch with durable seams that are as invisible as possi-ble. Provide materials and comply with installation requirements specified in other Sections.
1. Inspection: Where feasible, test and inspect patched areas after completion to demon-strate integrity of installation.
2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish restora-tion into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing.
3. Floors and Walls: Where walls or partitions that are removed extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish, color, texture, and appearance. Remove in-place floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and ap-pearance.
4. Ceilings: Patch, repair, or rehang in-place ceilings as necessary to provide an even-plane surface of uniform appearance.
5. Exterior Building Enclosure: Patch components in a manner that restores enclosure to a weathertight condition.
D. Cleaning: Clean areas and spaces where cutting and patching are performed. Completely remove paint, mortar, oils, putty, and similar materials.
END OF SECTION 01731
SECTION 01732 - SELECTIVE DEMOLITION
A. This Section includes the following:
1. Demolition and removal of selected portions of building or structure.
2. Demolition and removal of selected site elements.
3. Salvage of existing items to be reused or recycled.
B. See Division 1 Section "Construction Waste Management" for disposal of demolished materi-als.
A. Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled.
B. Remove and Salvage: Detach items from existing construction and deliver them to Govern-ment.
C. Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and re-install them where indicated.
D. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
1.3 SUBMITTALS
A. Schedule of Selective Demolition Activities: Indicate detailed sequence of selective demolition and removal work, with starting and ending dates for each activity, interruption of utility ser-vices, use of elevator and stairs, and locations of temporary partitions and means of egress.
B. Pre-demolition Photographs or Videotapes: Show existing conditions of adjoining construction and site improvements, including finish surfaces that might be misconstrued as damage caused by selective demolition operations. Comply with Division 1 Section "Photographic Documenta-tion." Submit before Work begins.
C. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility li-censed to accept hazardous wastes.
1. Comply with submittal requirements in Division 1 Section "Construction Waste Man-agement."
1.4 QUALITY ASSURANCE
A. Demolition Firm Qualifications: An experienced firm that has specialized in demolition work similar in material and extent to that indicated for this Project.
B. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program.
C. Regulatory Requirements: Comply with governing EPA notification…