SNYDER CREEK DAM RECONSTRUCTION
Solicitation number
140L0624R0060
Issued by

About this file

This document is a Sources Sought Notice from the Bureau of Land Management (BLM) for the Snyder Creek Dam Reconstruction project. The BLM has a requirement to repair the Snyder Creek Dam located in Fremont County, Wyoming. The project includes dewatering the reservoir, excavating and reconstructing the dam embankment, constructing a new spillway and outlet conduit, and reclaiming all disturbed areas. The anticipated period of performance is 454 calendar days after the notice to proceed is issued. The estimated magnitude of construction is $1,000,000 to $5,000,000. The North American Industry Classification System (NAICS) code is 237990 - Other Heavy and Civil Engineering Construction, with a small business size standard of $45 million. The BLM anticipates issuing a request for proposals in July 2024 and will likely require bid, performance, and payment bonds. Interested parties are encouraged to respond to the Sources Sought notice using the provided Microsoft Form by June 24, 2024, at 8:00 AM MT.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

BUREAU OF LAND MANAGEMENT

National Operations Center Denver Federal Center, Building 85

P.O. Box 25047 Denver, Colorado 80225-0047 https://www.blm.gov

SNYDER CREEK DAM RECONSTRUCTION

140L0624R0060 | Sources Sought Notice

Purpose: This is a Sources Sought Notice for the purpose of conducting market research, to gain knowledge regarding the type of interested businesses and their qualifications. Responses are being requested from both large and small businesses. Proposals are NOT being requested, nor accepted at this time. The Bureau of Land Management (BLM) will use information obtained through this notice to develop an acquisition strategy.

The Government anticipates conducting a competitive acquisition for this requirement. The amount of interest or lack thereof will determine the possibility of a small business or other socio-economic small business set-aside for the solicitation. Quality of responses received will be considered when making any small business set-aside determinations for this requirement.

Not responding to this announcement does not preclude participation in any future solicitation. If a solicitation is released, it will be synopsized on SAM.gov. It is the responsibility of the potential offerors to monitor the site for additional information pertaining to this requirement.

Cost Reimbursement: Response to this announcement is strictly voluntary. No reimbursement will be made for any costs associated with providing information in response to this notice or any follow-up information requests.

Project Description: The Bureau of Land Management (BLM) has a requirement for a project that will repair Snyder Creek Dam, located in Fremont County approximately 5.5 miles northeast of Lost Cabin, WY. Major work items include: 1. Dewater reservoir and construction area; 2. Excavate a portion of the existing dam embankment; 3. Strip the upstream and downstream surface of the dam embankment; 4. Reconstruct the dam embankment; 5. Construct precast concrete spillway riser for a new principal spillway; 6. Construct concrete encased, precast reinforced concrete pipe outlet conduit; 7. Construct precast concrete low-level inlet structure; 8. Construct a grouted riprap stilling basin; 9. Place road gravel surfacing along the crest of the dam; 10. Reclaim all disturbed areas including staging areas and temporary roads; and 11. Construct a 3 barbed and 1 smooth, 4-wire fence.

Anticipated Period of Performance: 454 calendar days after issuance of the notice to proceed.

Magnitude of Construction: $1,000,000.00 – $5,000,000.00.

North American Industry Classification System (NAICS) code: 237990 | Other Heavy and Civil Engineering Construction.

Small Business Size Standard: $45 million.

Solicitation: The BLM anticipates issuing a request for proposals July of 2024.

Bonding: The BLM anticipates that bid, performance, and payment bonds will be required.

Submission/Response Contents: Interested parties are encouraged to respond to this Sources Sought notice by copying and pasting the link below into a web browser; then fill out the associated Microsoft form. Additional capabilities submissions are welcomed but must be limited to 5 pages. Please submit to Greetchen Jeremie, gjeremie@blm.gov.

https://forms.office.com/g/RiB01z2q9Z

Submittal Due Date/Time: 24 June 2024 8:00 AM MT.