This document contains questions and answers related to a federal construction contract for road and parking lot rehabilitation work. The contract will involve repairing cracks along curb lines, removing and reinstalling speed bumps, preparing and repaving areas without existing pavement, and replacing all striping and parking dots to match existing markings, including use of ADA symbols. Patching of failures or hollow areas will be included in the double chip seal work. The quantity of any necessary patching will depend on the quality of the first chip seal layer completed by the contractor. The solicitation number for this opportunity is 140L0624R0011 and it is being issued by the Bureau of Land Management for work at the TK Jones Recreation Area located 25 miles north of Yuma, Arizona.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

BUREAU OF LAND MANAGEMENT

National Operations Center

Denver Federal Center, Building 85

P.O. Box 25047

Denver, Colorado 80225-0047 http://www.blm.gov

140L0624R0011

TK Jones Site Road and Parking Lot

Questions & Answers

1. Q: Do cracks along the curb lines need to be filled very wide and deep?

A: Yes, the cracks along the curb lines are to be cleaned and prepared per specifications and double chip over per specifications.

2. Q: Will the weeds be sprayed in the cracks prior to the work to kill them?

A: No.

3. Q: Will the curbs be repainted as before?

A: No, curbs will not be repainted under this contract.

4. Q: In the one parking lot the spaces are delineated by dots now are they to be replaced after removal or replaced with paint stripe?

A: No, all parking stalls will require painting/striping per specifications.

5. Q: Will speed bumps be removed and replaced after work or remain in place?

A: Speed bumps are to be removed and reinstalled.

6. Q: Does the new work go back to the curb in the one area that has no paving at this time?

A: Yes, area to be prepared and double chipped per specification.

7. Q: In which CLIN would patching issue listed below be paid for?

A: Patching will be performed as needed due to failures or to correct hollow areas left in the layers of chip seal and is considered part of the double chip portion of the work. At this time, only one CLIN is planned for the contract award.

8. Q: Quantities for Patch Work and why the government believe this may be an issue? Notes: If patch work is needed because of the first chip seal layer failure, the patch work must be completed and approved by the COR or PI before starting second chip seal layer.

A: The amount of patching required should be minimized by the contractor and the quantity will vary depending on the quality of work that is performed.

9. Q: Will all striping be replaced to match existing striping?

A: Yes, striping will match existing. Parking lot dots to be replaced with striping. Use Active ISA Parking Symbol at ADA Parking Stalls.