B09_22R0029_Attach_7_Questions_and_Answers_0001.pdf
PDF 282 KB Posted
- Attached to
- GAOA-MONIDA CREEK DAM #1 AND #2 RECON
- Solicitation number
- 140L0622R0029
About this file
This document contains questions and answers related to solicitation number 140L0622R0029 for the reconstruction of Monida Creek Dam numbers 1 and 2. The solicitation involves reconstructing two dams for the Bureau of Land Management. Contractors are responsible for identifying their own material sources that meet the specifications, with notable requirements including class 2 riprap and 3/4 inch crushed aggregate. While specific quarry sources are not identified, alternative materials can be proposed. Lima Reservoir adjacent to the site and a nearby stream 2 miles away are identified as available water sources, with contractors responsible for obtaining appropriate water rights if needed. Erosion control practices are required but silt fencing is not mandatory. All proposed materials must be approved by the government prior to installation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
BUREAU OF LAND MANAGEMENT
National Operations Center Building 50, Denver Federal Center
P.O. Box 2547 https://www.blm.gov
140L0622R0029 Monida Creek Dam #1 and #2
Solicitation Questions and Answers
1) Q: Is there a list of approved local quarries?
A: The BLM have not identified specific pits; it is the contractor’s responsibility to find specified material or propose alternative available materials.
2) Q: Can you please indicate the closest water source for construction?
A: Lima Reservoir is adjacent to the site for drafting. There is a small stream 2 miles away for drafting. Contractor is responsible to seek appropriate water rights for use if applicable.
3) Q: I do not see silt fencing indicated on the plans/drawings. Is it a requirement?
A: Not Required however, erosion control and sediment deposit must be accounted for.
4) Q: On page 14 of 22 of the “CONSTRUCTION SPECIFICATIONS MONIDA CREEK DAM #1 AND #2 RECONSTRUCTION” it states: “The 3/4”-inch crushed aggregate material shall be from a source approved by the Engineer. Any other aggregate as called for on the plans shall be supplied in a manner that meets the gradation as specified. All materials shall be approved by the government prior to installation.”
Will you please be so kind to make known approved sources for the required aggregates? (Class 2 riprap and 0.75” crushed aggregates.)
A: The BLM have not identified specific pits; it is the contractor’s responsibility to find specified material or propose alternative available materials.