Attch_13_Tooele_Valley_Air_Center_Pre-bid_Q_A__2_0002.pdf

PDF 62 KB Posted

Attached to
TOOELE AIR CENTER - DESIGN BUILD
Solicitation number
140L0622R0024
Issued by

About this file

This document provides questions and answers related to solicitation number 140L0622R0024 for the Tooele Air Center Design Build project. The solicitation is seeking proposals from offerors to design and build the Tooele Air Center for the Department of the Interior Bureau of Land Management National Office. One question asked if key personnel licenses and credentials need to be compiled separately or included in resumes, and the response indicated they only need to be identified in resumes and copies do not need to be provided. No other details regarding required products, services, pricing, or timelines are included in this questions and answers document.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tooele Valley Air Center Pre-bid Q&A #2 06/09/2022

1) At the bottom of page 39 of the solicitation, under the description of Subfactor 1: Key personnel, it asks the offerer to provide applicable licenses and professional credentials for both key designers and key personnel, along with their respective resumes. Is it permissible to just include their relative credentials as text in the resumes or do I need to compile each license and include those?

Section L-9 Volume 2: Factor I, Qualifications and Capabilities (Phase One): Licenses and professional credentials should be identified and listed in key personnel resumes. Copies of licenses and professional credentials do not need to be provided in the proposal.

File details come from the government source that posted it. Updated .