B09_A01_Attachment10_22R0021_Sol_Q_and_A_0001.pdf

PDF 123 KB Posted

Attached to
La Posa LTVA Sites Road Repaving FY22
Solicitation number
140L0622R0021
Issued by

About this file

This document contains questions and answers regarding solicitation number 140L0622R0021 for road and pavement rehabilitation work at the La Posa Long Term Visitor Area. The solicitation seeks all material, equipment, labor, and supervision to perform the road and pavement work in accordance with provided plans, specifications, and attachments. Key details include that there are no economic price adjustment clauses or liquidated damages included in the solicitation. The quality control testing must be performed by a third party. While the project specifications call for an MAG mix with PG 64-22 oil, PG 70-10 oil is an acceptable substitution. Project supervision can perform multiple duties if they can demonstrate the required experience, and the quality control manager position can be subcontracted out if necessary qualifications are provided.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

BUREAU OF LAND MANAGEMENT

National Operations Center Building 50, Denver Federal Center

P.O. Box 2547 https://www.blm.gov

140L0622R0021 La Posa LTVA Sites Road Repaving

Questions and Answers #1

1) Q: Given the NTP issuance time frame and the rising inflation/construction/fuel costs it can be reasonably expected that there will be cost escalations, how are these to be accounted for or recouped?

A: There are no Economic Price Adjustment clauses included in the solicitation. The clause 52.211-10 Commencement, Prosecution, and Completion of Work has been updated, please see the Attachment 2 to Amendment 0001

2) Q: Is there any specific required qualifications for the Site Safety or QCM?

A: No specific requirements. Site Safety and QCM shall be capable of performing duties and knowledgeable of all regulations and laws pertaining to the work to be performed. Proof needs to be provided through the form of a resume or past performance.

3) Q: The bid documents state that the project supervision can perform multiple duties, what are the limitations on this? For example, can the QC Manager also be Site Safety or can the Superintendent triple hat also as QC and Safety?

A: There are no limitations if the project is fully covered. The superintendent can perform the QC and Safety duties if they can prove they have experience performing these duties which could include past performances. If superintendent is not on job site, contractor is responsible for having someone be an alternate to perform these duties.

4) Q: What are the liquidated damages (if any)?

A: There are no liquidated damages included in the solicitation.

5) Q: Can the QC Manager position be subcontracted out or do they have to be an employee of the prime contractor?

A: QC Manager can be subcontracted out if contractor wants to do that. Qualifications of QC manager will need to be provided to prove they can perform duties. The quality control testing which includes, but not limited to, compaction testing and material testing will need to be from a third party as stated in the specifications.

6) Q: The project specifications call for a MAG ¾” mix but with a PG 64-22 oil. This oil is not normally used in this climate, it is too brittle and therefore not typically used. The MAG mixes used are designed with the PG 70-10. Is that an acceptable substitution?

A: PG 70-10 oil is acceptable to be used.