Sol_140L0124Q0014_Amd_0002.pdf

PDF 4 MB Posted

Attached to
Request for Quote-Demolition, Lake Vermilion Federal contract opportunity
Solicitation number
140L0124Q0014
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This document is a modification to a Request for Quote for demolition services on an island in Lake Vermillion, Minnesota. The purpose of the modification is to provide answers to questions received, post a revised Statement of Work, and provide a Past Performance Reference Template.

The key details are:

  • The BLM is requesting demolition services to remove all structures, debris, docks, and hazardous materials from a 0.18-acre island in Lake Vermillion, MN. This includes a cabin, three sheds, and two docks.
  • Asbestos has been identified in the window glazing of the main cabin and must be removed by an approved asbestos contractor.
  • The contractor shall provide a Comprehensive Technical and Management Plan, remove all structures and debris, and provide disposal documentation.
  • The work must be completed between May 2024 and September 2024.
  • Past performance information is required but will only be reviewed for responsibility determination, not as an evaluation factor.

View the file

Other files for this federal contract opportunity

Other files attached to Request for Quote-Demolition, Lake Vermilion, newest first.
File Type Posted
Sol_140L0124Q0014_Amd_0001.pdf PDF
Sol_140L0124Q0014.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140L0124Q0014 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

LWA

Washington DC 20003 20 M Street SE

BLM ACQ & FA (WO855)

04/24/20240002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/24/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of Modification 2 is to provide answers to received questions (4.29.2024), to post Revised SOW (changes highlighted yellow) and to post Past Performance Reference

Template.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Oksana Rollins

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation # 140L0124Q0014 Demolition, Lake Vermilion, MN Company’s Name:

Questions – Received by 4.29.2024

Item Pa ge

No

Parag raph

Ref/S enten ce

Question/Comment Government Response Solicitation

Change

1 We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services.

This is a brand new contract. There is no incumbent.

2 HAZMAT Survey – Has a HAZMAT Survey been conducted on the buildings, land, concrete, etc. that you can provide for us to review what

HAZ Waste there is to dispose of and quantities?

No HAZMAT survey has been done other than the Asbestos sampling. Please refer to the “Link

1: Minnesota State Rules 1” in the RFQ for guidance. The structures do not have any knowledge of specific uses other than a living space for recreational activities. The contractor is required to characterize the debris and test according to the standards set by the MN Rules.

3 In your Solicitation you reference Appendix A links (1-5) There is only

4 links in Appendix A but starting on page 7/70 it references Link

5. Please confirm how many links we should have in this package.

There are 4 links. Page 7. Please see the attached

SOW (B08 140L0124Q0014 - SOW - Final -

Revised). Revisions are highlighted yellow.

4 For the existing utilities (above ground or underground) do you want them totally removed or cut/capped in place?

All man-made materials and debris will be removed above the surface. Any subsurface items will be cut and capped if determined by the COR.

5 For the outhouse, what are you wanting to do with the pit/waste hole?

No outhouse is known to be on the island. If one is found during the contract, the contractor will report it to the COR and the CO for the changes in the condition of the site. The COR will be opening all structures during the site visit and if one is found at that time, it will be addressed by a revision in the RFQ.

6 Under Attachment 4 FAR 52.212-1, you outline what is required in each volume:

E.4 – Will the cover page, glossary, and table of contents count as part of the page count?

No, cover page, glossary and table of contents do not count against page count.

No

Parag raph

Ref/S enten ce

Question/Comment Government Response Solicitation

Change

7 Under Attachment 4 FAR 52.212-1, you outline what is required in each volume:

F.1.a – lists 4 items you would like for us to include in the volume

i. You are only allowing 5 pages for a technical approach, Key Project

Management, Schedule, and QCP.

1. Will you allow consider increasing the allowable pages for this section

2. How many on-site personnel are required for this project?

a. Also reference Attachment 5, Volume 1 section 4.1.b.

b. May one person serve as the Super/QCM/SSHO for this project?

1.

1-The Page count remains the same. Appendixes do not count against the page count.

2-2a-Any number of folks can attend the site meeting.

2-2b-One person can serve as the

Super/QCM/SSHO for this project.

8 Under Attachment 4 FAR 52.212-1, you outline what is required in each volume:

i. Under Attachment 5 FAR 52.212-2 Evaluation, you state that we are going to be evaluated on the following but Past Performance is not showing as a requirement to be included in the Technical

Volume, please advise how to proceed:

1.Technical

2.Past Performance

2a.If Past Performance is required, is there a specific format or place you would like us to include this information?

3.Price

Past Performance will be reviewed for responsibility determination only. It is not a part of Technical Volume. Past performance is not an evaluation factor. Please send the past performance references for prior similar projects. Sample of the reference is attached.

9 Is there road access to the island in Lake Vermillion to mobilize equipment and to haul off debris?

The access points to get to the island are boat launches. All of the boat launches are accessible by road. There are parking lots at the launches which would allow for hauling off debris and mobilizing equipment.

No

Parag raph

Ref/S enten ce

Question/Comment Government Response Solicitation

Change

ATTACHMENT 1 – PRICING TABLE

Please provide the pricing for each line item and then total price.

Task: Detail:

Time

(hrs/days): Cost:

Mobilization Lumpsum

Demolition Crew

Equipment

Materials

Demobilization Lumpsum

Total

Duration Hours

Weeks

ATTACHMENT 2 – STATEMENT OF WORK

STATEMENT OF WORK

Introduction

The Bureau of Land Management (BLM) is responsible for the management of 70 islands in Lake

Vermillion, Minnesota. In 2003, the Bureau of Land Management (BLM) issued a three-year permit for a recreational cabin to an individual with the right to renew for his "lifetime" with no rights to assign or otherwise transfer the permit to a subsequent party. The permit was issued to resolve the unauthorized use and occupancy of the island by the family which began in 1921. Pursuant to 43 CFR

2920.9-3(a)(1), the use permit automatically terminated by operation of law on December 31, 2018, the end of the period for which it was issued.

Objectives

The BLM has a requirement to remove all structures, debris, docks, and any hazardous materials from the 0.18-acre island located in Lake Vermillion, Minnesota. The structures include a 22.5’x12.5’ cabin, a 6’x4’ shed, a 10’x6.5’ shed, and a 10’x7.5’ shed. The Contractor shall move the materials for disposal to an appropriate disposal site in Minnesota that complies with State and Federal regulations.

All hazardous material shall be placed into proper containers and taken to an appropriate disposal site.

There are hazardous materials on the island such as propane tanks, fuel cans, oil containers, and fuel lines. The BLM is not aware if tanks contain any gas or fuel, or oil. Minnesota Administrative Rules

7035.0805 Subpart 1 says the state of Minnesota requires “hazardous materials or items present in structures are removed prior to the commencement of renovation or demolition and that the hazardous materials or items generated as a result are properly characterized and disposed of or recycled.” The structures on the island were tested for asbestos in 2023, and asbestos was found within the window glazing on the windows in the main cabin. The asbestos shall be removed by an approved asbestos contractor by the state of Minnesota. The Contractor shall be responsible for following all the demolition rules at the Link 1: Minnesota State Rules 1. following link: See Appendix A for maps, photos, links, and asbestos results. The Contractor shall obtain any necessary permits for demolition.

The Contractor shall abide by any and all conditions set forth in said permits. This work shall be completed between May 2024 and September 2024.

Deliverables

1. Comprehensive Technical and Management Plan. The Contractor shall provide a written plan for the BLM in advance of starting the project. The plan must include the following:

a. A listing of personnel, including subcontractor(s), working on the project.

b. Key personnel and their responsibilities during the project.

c. Qualifications and experience of personnel and subcontractors.

d. Detailed description of how the activities shall be performed.

e. Detailed listing of the equipment to be used in the project.

f. Detailed procedure of identifying and handling of hazardous materials.

g. Waste storage and disposal methods.

h. Debris Management Plan (detailed plan on how the Contractor shall follow the debris rules (see Appendix A Link 1: Minnesota State Rules 1)

i. Project Work Schedule.

2. Complete removal of each structure, docks, and any associated debris in accordance with the demolition rules of the state of Minnesota. (See Appendix A Link 1: Minnesota State Rules 1)

a. All structures, docks, and debris shall be removed and disposed in an appropriate manner that is complaint with all state and federal laws/regulations. All hazardous material shall be placed into proper containers and taken to an approved disposal site. All metal objects that go subsurface shall be cut at surface level. All metal objects that go subsurface shall be documented and the contracting officer’s representative (COR) would determine if the metal object would be capped by the Contractor for safety concerns. Any equipment, such as excavators or backhoes, used on the island needs to contain EPA-approved environmental acceptable lubricants that are biodegradable, minimally toxic to aquatic organisms and non-bio accumulative.

b. Any use of equipment on the island should be as minimal as possible and ground protection mats must be used where the machine shall operate over soil. Ground protection mats must be at least a half inch thick and wide enough to cover the width of the equipment. Due to site conditions, it is not foreseeable that the Contractor would be able to use the island for equipment cache or storage during operations. The Contractor shall not store fuel on the island. All debris and hazardous waste containers must be marked (see Appendix A Link 2 3: EPA Hazardous Waste Containers EPA) so that they are readily identified. In addition, the Contractor must ensure that there is a clear audit trail for all items until the final recycling or treatment/disposal is accomplished.

c. Post-work removal report: Contractor shall provide before removal and after removal photos of each structure.

d. Post-work debris disposal report: Contractor shall provide proof of disposal, including the destination, reported weight, and a copy of the invoice.

e. Hazardous waste: Contractor shall follow all Minnesota Rules (See Appendix A Link 1:

Minnesota State Rules 1) regarding the testing (See Appendix A Link 3 4: Minnesota

State Rules 2) of materials, removal, transportation, and disposal of hazardous waste.

f. No trees shall be removed in the project area.

g. Straw wattles shall be used around the perimeter of the island and straw mats shall be installed in the foundation imprint of the cabin post removal.

3. Permits: The Contractor shall be responsible for identifying and acquiring all permits needed for this project.

• All work must be accepted by the COR prior to final payment.

Work Hours/Schedule:

All actions must be completed between May 1, 2024 and September 30, 2024. The Contractor shall follow all local county rules on hours of operation of noise producing equipment.

The Contractor shall observe the following as legal public holidays and no work shall be performed:

• New Year’s Day

• Martin Luther King’s Birthday

• Presidents’ Day

• Memorial Day

• Juneteenth

• Independence Day

• Labor Day

• Columbus Day

• Veteran’s Day

• Thanksgiving Day

• Christmas Day

NEPA and Other Laws and Regulations:

This project is under environmental review in accordance with NEPA and other associated environmental laws and regulations, including but not limited to:

• FLPMA (The Federal Land Policy and Management Act of 1976 as Amended)

• FAR (Federal Acquisition Regulation)

• R&PP (Recreation & Public Purposes Act)

• ESA (Endangered Species Act)

• NHPA (National Historic Preservation Act)

• EO 13175 (Consultation and Coordination With Indian Tribal Governments)

Inspections and Acceptance:

Reports: All reports must be approved by the Contracting Officer Representative. Reports shall be provided in PDF format.

• Comprehensive Technical and Management Plan (See Comprehensive Technical and Management

Plan above for list)

• Debris Report: measured in tonnage by each load and a total weight, name of the sites used for disposal, date of disposal, and a minimum of two pictures.

Government Responsibilities:

a. Provide final inspection of services provided by the Contractor.

b. COR would review and sign that services have been received.

Safety Requirements:

In performing the scope of work, all safety on or off the site shall be the sole responsibility of the Contractor.

The Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions in connection with the work. The Contractor shall provide a safety plan that aligns with relevant OSHA and DOI

(See Appendix A Link 4 5: BLM Manuals) regulations and policies for on-water operations and abide by this plan for all project operations. The Contractor shall have on site at all times an appropriate first-aid kit.

All Contractor personnel shall comply with all applicable Federal, State and local laws while engaged in the performance of this contract to include safety policies and regulations (See Safety Manual at Link under

Appendix A Link 4 5: BLM Manuals) established by the BLM. Supplements or amendments to listed publications may be issued during the life of the contract.

A. Occupational Safety and Health

The Contractor shall comply with all provisions of the Wouldiam-Steiger Occupational Safety and

Health Act of 1970, all applicable safety and health regulations that have been promulgated by the

Secretary of Labor under the Wouldiams-Steiger Occupational Safety and Health Act of 1970, to include 29 Code of Federal Regulation (CFR) Part 1910 (Occupational Safety and Health Standards), and all applicable safety and health codes and standards of the state and local jurisdictions where the work is to be performed. Periodic inspections would be made by the Government to ensure safe and healthy working conditions. Provisions of the Wouldiam-Steiger Occupational Safety and Health Act of 1970 and the Occupational Safety and Health Standards can be found at the following links:

1) Wouldiam-Steiger Occupational Safety and Health Act of 1970 http://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=OSHACT

2) 29 (CFR) Part 1910 Occupational Safety & Health Standards http://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=OSHACT http://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_level=1&p_part_number=

B. Safety, Health, and Environmental Requirements

The Contractor shall ensure that their personnel comply with all BLM safety, health, fire protection, and security policies, guidelines, and directives. The Contractor shall ensure safety in the assigned work area of the 0.18-acre island as well as unassigned work areas (including but not limited to the path to and from the island and the path to and from the boat launch to the disposal site). Prior to any work being performed, the Contractor shall advise personnel performing the work of any hazards involved.

C. Energy Conservation

The Contractor shall participate in Government utility conservation and resource recycling programs.

The Contractor shall instruct all personnel in energy and resource conservation practices and shall require them to operate utilities under conditions that preclude wasteful use of energy. Current recycling programs include aluminum cans, paper, and printer ink cartridges. Federal guidelines concerning recycling can be found at http://www.ofee.gov.

Miscellaneous Information:

• There are no government-provided bathrooms, the Contractor shall provide their own Port-a-John and

Service.

• There are neither live electricity nor live water connections to any structures.

• BLM does not own any of the boat launches. It is up to the contractor to determine what type of launch is needed for equipment they will be using and how to arrive to the island.

http://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_level=1&p_part_number http://www.ofee.gov/

Appendix A

Photo 1: Cabin

Photo 2: Inside Cabin

Photo 3: Outbuilding 1

Photo 4: Inside Outbuilding 1

Photo 5: Outbuilding 2

Photo 6: Inside Outbuilding 2

Photo 7: Outbuilding 3

Photo 8: Inside Outbuilding 3

Photo 9: Dock 1

Photo 10: Dock 2

Map 1: Location of the Island in Lake Vermillion, MN

Link 1: Minnesota State Rules 1 https://www.revisor.mn.gov/rules/7035.0805/#rule.7035.0805.5

Link 2: EPA Hazardous Waste Containers https://iwaste.epa.gov/rpts/handbk4.pdf

Link 3: Minnesota State Rules 2 https://www.revisor.mn.gov/rules/7045.0214/

Link 4: BLM Manuals

Manuals | Bureau of Land Management (blm.gov) https://www.revisor.mn.gov/rules/7035.0805/#rule.7035.0805.5 https://iwaste.epa.gov/rpts/handbk4.pdf https://www.revisor.mn.gov/rules/7045.0214/ https://www.blm.gov/policy/manuals

PAST PERFORMANCE REFERENCES

OFFEROR INFORMATION

Company Name:

Cage Code: DUNS Number:

Company Address:

Company Point of Contact (POC):

Company POC Phone Number:

Company POC Email:

FIRST PAST PERFORMANCE INFORMATION CITATION

Contracting Agency:

Reference Citation Number: 1 Contract Number:

Contract Type: Contract Value:

Period of Performance:

Brief Description of Contract Effort:

Reference Citation Point of Contact (POC):

POC

Phone Number:

POC Email:

SECOND PAST PERFORMANCE INFORMATION CITATION

Contracting Agency:

Reference Citation Number: 2 Contract Number:

Contract Type: Contract Value:

Period of Performance:

Brief Description of Contract Effort:

Reference Citation Point of Contact (POC):

POC

Phone Number:

POC Email:

PAST PERFORMANCE REFERENCES

THIRD PAST PERFORMANCE INFORMATION CITATION

Contracting Agency:

Reference Citation Number: 3 Contract Number:

Contract Type: Contract Value:

Period of Performance:

Brief Description of Contract Effort:

Reference Citation Point of Contact (POC):

POC

Phone Number:

POC Email:

B08 Questions Received by 4.29.24
B08 140L0124Q0014 - SOW - Final - Revised
Past Performance References Template