140G0321Q0208_portfolio.pdf

PDF 18 MB Posted

Attached to
M2M LAB SPECIAL INSPECTIONS Federal contract opportunity
Solicitation number
140G0321Q0208
Issued by
Department of the Interior US Geological Survey Office of Acquisitions and Grants

About this file

This solicitation is seeking offers for materials testing and special inspections for a new laboratory building at the NASA Research Park in Moffett Field, California. The Department of the Interior US Geological Survey Office of Acquisitions and Grants is requesting these services to support construction of the new facility. Offerors should submit proposals in response to solicitation number 140G0321Q0208 by the specified due date to be considered for award of a contract to provide laboratory special inspections and materials testing. Relevant services include conducting on-site tests and inspections to verify building components meet design standards, as well as materials testing to ensure structural integrity and compliance with specifications. The location of the work is specified as the NASA Research Park in Moffett Field.

View the file

Other files for this federal contract opportunity

Other files attached to M2M LAB SPECIAL INSPECTIONS, newest first.
File Type Posted
Sol_140G0321Q0208_Amd_0001.pdf PDF
Sol_140G0321Q0208.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

USGS Research Facility Job # 5020159

NASA Ames Research Center, Parcel 15

Menlo Park, CA

Submittal Date:

Submittal Number:

Transmitted For:

Submittal Description:

HENSEL PHELPS CONSTRUCTION CO.

REVIEWED

REVISE & RESUBMIT

NO EXCEPTIONS TAKEN

MAKE CORRECTIONS NOTED

REJECTED

THIS SUBMITTAL HAS BEEN REVIEWED FOR GENERAL COM-

PLIANCE WITH THE CONTRACT DOCUMENTS. APPROVAL DOES

NOT RELIEVE THE SUBCONTRACTOR/SUPPLIER OF THE RESPON-

SIBILITY FOR CONFORMANCE TO THE QUALITY STANDARDS

AS SET FORTH IN THE CONTRACT DOCUMENTS NOR DOES

IT RELIEVE RESPONSIBILITY FOR FIELD VERIFICATION OF

ALL CONDITIONS RELATING TO THE WORK OF SUBCON-

TRACTOR/SUPPLIER. SUBCONTRACTOR/SUPPLIER IS RESPON-

SIBLE FOR DIMENSIONS AND QUANTITIES OF MATERIALS

RELATING TO THIS CONTRACT.

CK'D BY

SUBMITTAL NO.

DATESM 6/14/11

00020330000 x x

07/16/2021

006 - 05 12 00 - 0

CG 07/16/21

006 - 05 12 00 - 0

H P C

S T A M

A E

S T A

O W N E R

A

Includes Shop Welding Procedure Specifications (WPS), Procedure Qualification Records (PQRs), Weld Wire Product Literature, and Shop Welder Qualification Record.

Please Note that all welds at SLRS (Seismic Load Resisting System) members and DC (Demand Critical) welds will be welded using the WPS with Lincoln OSXLH70, weld requirements for SLRS and DC welds).

SUBMITTAL

Approval

No:

06-23-2021 Date:

Project:

Hensel Phelps Construction Co.

1735 Technology Drive Suite 125 San Jose, CA 95110

Jesse Osburn Mobile: (408) 857-5243

Web Site GMC Sub 01 - GMC Shop WPS

USGS Menlo to MoffettRe:

Submittal 1Type #:

Name:

Deliver Via:

Submitted for approval. In order to maintain the schedule, please return this submittal approved to our office not later than 07-07-2021.

If you have any questions please contact:

Shared on Box ~

743 GMC Sub 01 - GMC Shop WPS 06-23-2021

Element Print Size Items Copies Drawing Included (Format: DwgNum-Rev)

8 1/2 x 11 1 1 743 Standard Shop WPS letter (CID 062321-05)

8 1/2 x 11 279 1 743 GMC Sub 01 - GMC Shop WPS

Totals: 280 2

GAYLE MANUFACTURING COMPANY Letter of Transmittal

Pg 1 of 1 R2130: Letter of TransmittalPrinted: 23-Jun-21 13:07 DB:

Production

Sort by Name, Std Only: F, Inc. R1550: T, WPS Attach: T, Electrode Attach: T USGS Menlo to Moffett P:743

# Std WPS FEMA Chpy Weld Joint Description D1 Ref PQR Weldwire Dia Root Prep BG Position DateRevPLDescription

1 T 0_PQR 27

LAST TEST

ALL ALL DC Weld

Joint D1.8 Annex

A

PQR

LAST

All DC Electro de

_D1.8

LAST_0

deg F

All 05-22-194ABLAST (0°F) CVN Heat Input Testing

2 T 001-12-HD-C Fillet T T-Joint Fig.3.5 PREQ E71T- 1&9C-

H8

CO2 UltraCore

HD-C

0" All 09-24-201ABFillet T Joint Skew ±10° max

T < 3" WQTR

3F,4F,5F Test

3 T 001-12-LH70 T T Fillet T T-Joint Fig.3.5

TC-F12-GF

PREQ E7018

H4R

Jetweld

LH70

1/8" 0" T All 06-15-196AFillet T Joint

T < 3"

4 T 001-12-

XLH70

T T Fillet T T Joint Fig.3.5

TC-F12-GF

PREQ E70T-

CO2 Outershield

3/32" 0" 1F, 2F 09-04-197AFillet T Joint

5 T 003-12-71C T T Fillet L Lap-Joint Fig.3.5.

L-F12-GF

PREQ E71T-

71C

.045" 0" All 06-15-196AFillet Lap Joint T < 3"

6 T 003-12-HD-C T T Fillet L Lap-Joint Fig.3.5. L-

F12-GF

0" All 09-24-201ABFillet Lap Joint T

7 T 003-12-LH70 T T Fillet L Lap-Joint Fig.3.5.

PREQ E7018

1/8" 0" All 06-15-196AFillet Lap Joint T

8 T 003-12 -

T T Fillet L Lap-Joint Fig.3.5.

3/32" 0" 1F, 2F 06-15-196AFillet Lap Joint T

9 T 004-12a-

T T Fillet L Lap-Joint Fig.3.5.

L-F12a-GF

3/32" 0" 1F, 2F 06-15-196AFillet Lap Joint T > 3” inc.

10 T 005-12A-71C T T Fillet T T-Joint Fig.3.4(A) PREQ E71T-

.045" 0" All 06-15-196AFillet T Joint Skew 60°-135° inc No Prep T < 3"

11 T 005-12A-HD-

T T Fillet T T-Joint Fig.3.4(A) PREQ E71T-

12 T 005-12A-

T T Fillet T T-Joint Fig.3.4(A) PREQ E7018

1/8" 0" All 06-15-196AFillet T Joint

13 T 005-12A-

T T Fillet T T Joint Fig.3.4(A) PREQ E70T-

3/32" 0" 1F, 2F 06-15-196AFillet T Joint

GAYLE MANUFACTURING COMPANY R1540: Weld Procedure Specs

23Jun21 12:54 DB:Production Pg 1 of 279 Weld Procedure Specs

# Std WPS FEMA Chpy Weld Joint Description D1 Ref PQR Weldwire Dia Root Prep BG Position DateRevPLDescription 14 T 006-12B-71C T T Fillet T T-Joint Fig.3.4 (B) PREQ E71T-

.045" 0" as reqd.

All 06-15-196AFillet T Joint inc Prep As Reqd

15 T 006-12B-HD-

T T Fillet T T-Joint Fig.3.4 (B) PREQ E71T-

0" as

All 09-24-201ABFillet T Joint

16 T 006-12B-

T T Fillet T T-Joint Fig.3.4 (B) PREQ E7018

1/8" 0" as

17 T 006-12B-

T T Fillet T T Joint Fig.3.4 (B) PREQ E70T-

3/32" 0" as

1F, 2F 06-15-196AFillet T Joint

18 T 007-12C-71C T T Fillet T T-Joint Fig.3.4 (C) PREQ E71T-

Skew 60°- 90° inc PL>100° Prep As Reqd T < 3"

19 T 007-12C-HD-

T T Fillet T T-Joint Fig.3.4 (C) PREQ E71T-

20 T 007-12C-

T T Fillet T T-Joint Fig.3.4 (C) PREQ E7018

21 T 007-12C-

T T Fillet T T Joint Fig.3.4 (C) PREQ E70T-

22 T 008-12D-71C T T Fillet T T-Joint Fig.3.4 (D) PREQ E71T-

Skew 60°- 30°

23 T 008-12D-HD-

T T Fillet T T Joint Fig.3.4 (D) PREQ E71T-

24 T 008-12D-

T T Fillet T T-Joint Fig.3.4 (D) PREQ E7018

23Jun21 12:54 DB:Production Pg 2 of 279 Weld Procedure Specs

# Std WPS FEMA Chpy Weld Joint Description D1 Ref PQR Weldwire Dia Root Prep BG Position DateRevPLDescription 25 T 008-12D-

T T Fillet T T Joint Fig.3.4 (D) PREQ E70T-

26 T 009-12-PIPE-

T T Fillet T T-Joint FIg.9.10 PREQ E71T-

.045" 0" All 06-15-196AFillet T Joint Tubular Skew = 30°Dia (B) = 1/3 or = 0.80 @ b

27 T 009-12-PIPE-

T T Fillet T T-Joint FIg.9.10 PREQ E71T-

28 T 009-12-PIPE-

T T Fillet T T-Joint Fig.9.10 PREQ E7018

1/8" 0" All 06-15-196AFillet T Joint

29 T 009-12-PIPE-

T T Fillet T T Joint Fig.9.10 PREQ E70T-

3/32" 0" 1F, 2F 06-15-196AFillet T Joint

30 T 010-12-TACK

-71C

T T Fillet T Tack 5.17 PREQ E71T-

.045" All 06-15-196ATack Weld & Construction Aid

31 T 010-12-TACK

-HD-C

T T Fillet T Tack 5.17 PREQ E71T-

All 09-24-201ABTack Weld &

32 T 010-12-TACK

-LH70

T T Fillet T Tack 5.17 PREQ E7018

1/8" All 06-15-196ATack Weld &

33 T 012-12-RPR-

T T Fillet RPR T-Joint - Repair

3.7.1 PREQ E71T-

.045" All 06-15-196AFillet Undercut Repair S = 3/16"

34 T 012-12-RPR-

T T Fillet RPR T-Joint -

3.7.1 PREQ E71T-

All 09-24-201ABFillet Undercut Repair S = 3/16"

35 T 013-12-RPR-

T T Fillet T T-Joint -

5.21.4 & 5.25(p1)

All 09-24-201ABFillet Root or short matl W = Less of 2t or 3/4

36 T 013-12-RPR-

T T Fillet T T Joint -

3/32" 1F, 2F 06-15-196AFillet Root or short matl W = Less of 2t or 3/4

23Jun21 12:54 DB:Production Pg 3 of 279 Weld Procedure Specs

# Std WPS FEMA Chpy Weld Joint Description D1 Ref PQR Weldwire Dia Root Prep BG Position DateRevPLDescription

37 T 014-12-RPR-

.045" All 06-15-196ASurfacing Weld Build-Up Material to Reduce Gap

38 T 014-12-RPR-

All 09-24-201ABSurfacing Weld Build-Up Material to Reduce Gap

39 T 015-12-RB-

T T Fillet T T-Joint D1.4 fig.3.5 (A)

0" All 09-24-201ABFillet T-Joint Rebar

40 T 024-12-PLUG

-71C

T T Fillet Plug Fillet: Plug / Slot Hole

2.4.4 PREQ E71T-

.045" 0" All 06-15-196AFillet @ Plug or Slot Holes

41 T 024-12-PLUG

-HD-C

T T Fillet Plug Fillet: Plug / Slot Hole

2.4.4 PREQ E71T-

0" All 09-24-201ABFillet @ Plug or Slot Holes

42 T 025-PLUG-

T T Plug Plug Plug / Slot 3.10, 5.24 PREQ E71T-

.045" 0" All 09-04-197APlug or Slot Weld

43 T 025-PLUG-

T T Plug Plug Plug / Slot 3.10, 5.24 PREQ E71T-

0" All 09-24-201ABPlug or Slot Weld

44 T 026-PLUG-

RPR-71C

T T Plug Plug Plug / Slot 3.10, 5.24, 5.25.5

.045" T All 06-15-196APlug Mislocated Holes/Slots

45 T 026-PLUG-

RPR-HD-C

T All 09-24-201ABPlug Mislocated

46 T 026-PLUG-

RPR-XLH70

3/32" 1G, 2G 06-15-196APlug Mislocated

47 T 036-P4-71C T T PJP BTC Single Bevel Groove

Fig.3.2

BTC-P4-GF

.045" 0" 45° All 06-15-196APJP (1) Side Single Bevel

48 T 036-P4-HD-C T T PJP BTC Single Bevel

Fig.3.2 BTC

-P4-GF

0" 45° All 09-24-201ABPJP (1) Side

49 T 036-P4-

T T PJP BTC Single Bevel

BTC-P4-GF

3/32" 0" 45° 1G, 2G 06-15-196APJP (1) Side

50 T 040-P5-HD-C T T PJP BTC Double Bevel

Fig.3.2 BTC-

P5-GF

0" 45° All 09-24-201ABPJP (2) SideDouble Bevel

23Jun21 12:54 DB:Production Pg 4 of 279 Weld Procedure Specs

# Std WPS FEMA Chpy Weld Joint Description D1 Ref PQR Weldwire Dia Root Prep BG Position DateRevPLDescription 51 T 040-P5-

T T PJP BTC Double Bevel

BTC-P5-GF

3/32" 0" 45° 1G, 2G 06-15-196APJP (2)

SideDouble Bevel

52 T 041-P6-HD-C T T PJP BC Single U

Fig.3.2 BC-

P6-GF

0" 20° T All 09-24-201ABPJP (1) Side Single U Groove T =1/4"

53 048-P8-LEN-

T T PJP / Fill T Single J

2.6.4.2 PQR

FCAW

54/54

.6

E71T-

.045" 0" 45° All 06-15-196APJP (1) Side Single J Groove Lenton Coupler = #9

54 048-P8-LEN-

HDC

T T PJP / Fill T Single J

2.6.4.2 PQR

54/54

.6

E71T-

0" 45° All 05-06-217APJP (1) Side

Lenton Coupler = #9

55 T 052-P10-71C T T PJP BTC Flare Bevel Fig.3.2

BTC-P10-GF

.045" 0" All 06-15-196APJP (1) Side Flare Bevel

56 T 052-P10-HD-

T T PJP BTC Flare Bevel Fig.3.2 BTC-

P10-GF

0" All 09-24-201ABPJP (1) Side

57 T 052-P10-

T T PJP BTC Flare Bevel

BTC-P10-GF

3/32" 0" 1G, 2G 06-15-196APJP (1) Side

58 T 057-P11-71C T T PJP B Flare V

B-P11-GF

.045" 0" All 06-15-196APJP (1) Side Flare V Groove Butt Joint

59 T 057-P11-HD-

T T PJP B Flare V

Fig.3.2 B-

P11-GF

0" All 09-24-201ABPJP (1) Side

60 T 057-P11-

T T PJP B Flare V

B-P11-GF

3/32" 0" 1G, 2G 06-15-196APJP (1) Side

61 T 059-L1a-71C T T CJP B Square

Fig.3.3 B-L1a-GF

.045" 0" 0° All 06-15-196ACJP/BU (1) Side Square Groove T = 3/8" max.

62 T 059-L1a-HD-

T T CJP B Square

Fig.3.3 B- L1a-GF

0" 0" All 09-24-201ABCJP/BU (1) Side Square Groove T = 3/8" max.

63 T 065-U2a-HD-

T T CJP B Single V

Fig.3.3 PREQ E71T-

1/4" 45° All 09-24-201ABCJP/BU (1) Side Single V Groove 1/4" @ 45°

64 T 070-U4a-HD-

T T CJP B Single Bevel

U4a-GF

3/16" 30° All 09-24-201ABCJP/BU (1) Side

Groove T = 3/4"

23Jun21 12:54 DB:Production Pg 5 of 279 Weld Procedure Specs

# Std WPS FEMA Chpy Weld Joint Description D1 Ref PQR Weldwire Dia Root Prep BG Position DateRevPLDescription 65 T 070-U4a-

B-U4a-GF

3/32" 3/16" 30° 1G, 2G 06-15-196ACJP/BU (1) Side

66 T 071-U4a-HD-

T T CJP TC Single Bevel

Fig.3.3 TC-

3/16" 30° All 09-24-201ABCJP/BU (1) Side

67 T 071-U4a-

TC-U4a-GF

3/32" 3/16" 30° 1G, 2G 06-15-196ACJP/BU (1) Side

68 T 072-U4a-HD-

1/4" 30° All 09-24-201ABCJP/BU (1) Side

69 T 072-U4a-

3/32" 1/4" 30° 1G 06-15-196ACJP/BU (1) Side

70 T 074-U4a-71C T T CJP TC Single Bevel

.045" 1/4" 30° All 06-15-196ACJP/BU (1) Side

Groove 1G T = 3/4"

71 T 074-U4a-HD-

1/4" 30° All 09-24-201ABCJP/BU (1) Side

72 T 074-U4a-

3/32" 1/4" 30° 1G 06-15-196ACJP/BU (1) Side

73 T 075-U4a-71C T T CJP B Single Bevel

.045" 1/4" 45° All 06-15-196ACJP/BU (1) Side

Groove T > 3/4”

74 T 075-U4a-HD-

75 T 075-U4a-

3/32" 1/4" 45° 1G, 2G 06-15-196ACJP/BU (1) Side

76 T 076-U4a-71C T T CJP BTC Single Bevel

B_TC-U4a-

GF

.045" 1/4" 45° All 06-15-196ACJP/BU (1) Side

77 T 076-U4a-HD-

T T CJP BTC Single Bevel

Fig 3.3 PREQ E71T-

23Jun21 12:54 DB:Production Pg 6 of 279 Weld Procedure Specs

# Std WPS FEMA Chpy Weld Joint Description D1 Ref PQR Weldwire Dia Root Prep BG Position DateRevPLDescription 78 T 076-U4a-

B_TC-U4a-

3/32" 1/4" 45° 1G, 2G 06-15-196ACJP/BU (1) Side

79 T 077.1-U4a-

Fig.3.3 PREQ E70T-

7/16" 30° 1G 06-01-196ACJP/BU (1) Side

Groove 1

80 T 077-U4a-HD-

Fig.3.3 PREQ E71T-

3/8" 30° 1G, 2G 09-24-201ABCJP/BU (1) Side

Groove 1 1/16" = T < 2

81 T 078-U4b-HD-

B_TC-U4b-

0" 45° T All 09-24-201ABCJP/BG (1) Side

Groove No Root or BU

82 T 085-U5-HD-C T T CJP B Double Bevel

U5-GF

0" 45° T All 09-24-201ABCJP/BG (2) Side Double Bevel

83 T 086-U5-HD-C T T CJP TC Double Bevel

U5-GF

0" 45° T All 09-24-201ABCJP/BG (2) Side

84 T 086-U5-

T T CJP TC Double Bevel

TC-U5-GF

3/32" 0" 45° 1G, 2G 06-15-196ACJP/BG (2) Side

85 T 092-U6-RPR-

T T CJP RPR Single U Groove -

ASTM A6

D1.8.6.18.5

20° min.

T All 09-24-201ABCJP/BG (1) Side

ASTM A6 Surface

86 T 092-U6-RPR-

ASTM A6

D1.8.6.18.5

3/32" 20° min.

1G, 2G 06-15-196ACJP/BG (1) Side

ASTM A6 Surface

87 T 093-U6-HD-C T T CJP B Single U

Fig.3.3. B_C

-U6-GF

0" 20° T All 09-24-201ABCJP/BG (1) Side

88 T 094-U6-RPR-

B_C-U6-GF

.045" 0" 20° T All 06-15-196ACJP/BG (1) Side

PZ Zone Weld

23Jun21 12:54 DB:Production Pg 7 of 279 Weld Procedure Specs

# Std WPS FEMA Chpy Weld Joint Description D1 Ref PQR Weldwire Dia Root Prep BG Position DateRevPLDescription

89 T 094-U6-RPR-

Fig.3.3 B_C

-U6-GF

0" 20° T All 09-24-201ABCJP/BG (1) Side

90 T 094-U6-RPR-

B_C-U6-GF

3/32" 0" 20° 1G, 2G 06-15-196ACJP/BG (1) Side

91 T 096-U7-71C T T CJP B Double U

B-U7-GF

.045" 0" 20° T All 06-15-196ACJP/BG (2) Side Double U Groove

92 T 096-U7-HD-C T T CJP B Double U

Fig.3.3 B-U7

-GF

0" 20° T All 09-24-201ABCJP/BG (2) Side

93 T 096-U7-

T T CJP B Double U

3/32" 0" 20° 1G, 2G 06-15-196ACJP/BG (2) Side

94 T 097-U7-RPR-

.045" 0" 20° T All 06-15-196ACJP/BG (2) Side

95 T 097-U7-RPR-

Fig.3.3 B-U7

-GF

0" 20° T All 09-24-201ABCJP/BG (2) Side

96 T 097-U7-RPR-

3/32" 0" 20° 1G, 2G 06-15-196ACJP/BG (2) Side

97 T 102.1 D1.8

T T CJP /

100%

DBR Single J

(Doubler

TC-U8a-GF PQR 102.1 -Dblr-

GF-

XLH7

E70T-

Varies 0° 1G 12-03-19CJP/PJP (1) Side

Doubler @ K area

98 T 102-U8a-

T T CJP /

100%

DBR Single J

(Doubler)

TC-U8a-GF

TC-P8-GF

PQR

68/60

-1

XLH7

E70T-

3/32" Varies 15°. 1G, 2G 06-15-196ACJP/PJP (1) Side

Doubler @ K area

99 T 103-U8a-HD-

T T CJP TC Single J

U8a-GF

0" 30° T All 09-24-201ABCJP/BG (1) Side Single SIde J Groove Doubler @ Web PL

23Jun21 12:54 DB:Production Pg 8 of 279 Weld Procedure Specs

# Std WPS FEMA Chpy Weld Joint Description D1 Ref PQR Weldwire Dia Root Prep BG Position DateRevPLDescription 100 T 103-U8a-

T T CJP TC Single J

TC-U8a-GF

3/32" 0" 30° 1G, 2G 06-15-196ACJP/BG (1) Side Single SIde J Groove bDoubler @ Web PL

101 T 111-STUD CJP T Stud Stud PREQ ASTM

Outershield

Varies 0" 1G 07-05-171ABStud Planar F or HA, B, & C Studs PR-19 Stud Welding

//END OF REPORT

23Jun21 12:54 DB:Production Pg 9 of 279 Weld Procedure Specs

Sort by Name, Std Only: F, Inc. R1550: T, WPS Attach: T, Electrode Attach: T Plant:

InOutDatePositionFillerThickness# Name E-Num Mark Code WPS

1 001-12-XLH70D1.1G6303050Garcia, Jose Unlimited E70T-1&9 2F 11-24-19 T

1 001-12-XLH70D1.1P3700300Petchu, Mongkol Unlimited E70T-1&9 2F 06-14-19 T

1 072.1-U4a-XLH70D1.1R2755500Rolph, Dillyn Term PL E70T-1&9 1G 05-03-17 T 2 075-U4a-71CD1.1 Pipe 3/4-4 E71T-1&9 2G 05-01-20 T 3 FC 01 71CD1.1 Unlimited E71T-1&9 3F up 4F 07-11-19 T 4 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 6G 10-24-16 T 5 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 11-03-15 T 6 SM 18 LH70D1.3 20 ga Galv E7018 Flat 10-08-18 T

1 075-U4a-XLH70D1.1X2792700Siphanounneua, Souvanh

Unlimited E70T-1&9 2G 06-30-19 T

2 FC 15 71CD1.1 PLUG E71T-1&9 1G 01-05-18 T

3 FC 15 71CD1.1 SLOT E70T-1&9 1G 01-05-18 T

GAYLE MANUFACTURING COMPANY R1550: Welder Qualifications

23Jun21 12:54 DB:Production Pg 10 of 279 Weld Procedure Specs

Attach: T, Electrode Attach: T Plant: A

1 D1.1B7081800Barnhart, Tyler Unlimited E71T-1C&9 1G & 1GR 04-15-21 T 2 012-12-RPR-71CD1.1 Unlimited E71T-1&9 3F dn 05-05-16 T 3 072.1-U4a-XLH70D1.1 Term PL E70T-1&9 1G 05-03-17 T 4 FC 01 71CD1.1 Unlimited E71T-1&9 3F up 4F 08-02-17 T

5 FC 15 71CD1.1 PLUG E71T-1&9 1G 10-20-17 T

6 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 10-20-17 T

7 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 1G Rotated 12-08-17 T 8 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 09-30-14 T T 9 SM 18 LH70D1.3 20 ga Galv E7018 Flat 09-15-17 T 10 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 10-20-17 T 11 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 11-14-17 T 12 077.1-U4a-XLH70D1.8 Unlimited E70T-1&9 1G 04-27-19 T

1 072.1-U4a-XLH70D1.1B6087100Beerbower, Robert Term PL E70T-1&9 1G 12-04-17 T 2 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 12-21-17 T

3 FC 15 71CD1.1 PLUG E71T-1&9 1G 12-15-17 T

4 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 12-04-17 T

5 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 05-30-14 T T 6 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 12-13-17 T

1 072.1-U4a-XLH70D1.1B3087150Beers, Joshua Term PL E70T-1&9 1G 09-15-17 T 2 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 09-29-17 T 3 FC 96 71CD1.1 Unlimited E71T-1&9 3F up 07-10-18 T

1 D1.1B1087200Beers, Justin Unlimited E71T-1&9 1G 04-28-21 T 2 FC01 71CD1.1 Unlimited E71T-1&9 4F 07-22-14 T

3 FC 15 71CD1.1 PLUG E71T-1&9 1G 02-02-17 T

4 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 02-02-17 T

5 FC 26 71CD1.1 T=1/8-3/4 E71T-1&9 3G up 07-22-14 T 6 SM 01 LH70D1.1 Unlimited E7018 3F up 4F 07-24-14 T 7 FC 96 71CD1.3 12ga-3/16" E71T-1&9 3G dn 11-25-14 T 8 SM 18 LH70D1.3 20 ga Galv E7018 Flat 01-04-02 T

1 D1.1K1126500Campbell, Kevin Unlimited E71T-8 3G up 4G 05-23-07 T 2 D1.1 Unlimited E7018 3G up 4G 06-16-99 T 3 065-U2a-71CD1.1 T=1/8-3/4 E71T-1&9 3G up 04-10-19 T 4 065-U2a-LH70D1.1 T=1/8-3/4 E7018 3G up 04-10-19 T 5 D1.5 Unlimited E7018 2G 06-16-99 T

23Jun21 12:54 DB:Production Pg 11 of 279 Weld Procedure Specs

1 072.1-U4a-XLH70D1.1R7127000Campos, Ricardo Term PL E70T-1&9 1G 05-08-17 T 2 072.1-U4a-XLH70D1.1 Term PL E70T-1&9 1G 05-08-17 T 3 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 08-29-17 T 4 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 10-07-13 T

5 FC 15 71CD1.1 PLUG E71T-1&9 1G 02-02-17 T

6 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 02-02-17 T

7 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 6G 02-08-18 T 8 FC 35 XLH70D1.1 Term PL E70T-1&9 1G 11-20-07 T 9 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 01-14-17 T 10 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 06-08-17 T 11 SM 01 LH70D1.1 Pipe 4"+ E7018 5F 08-29-17 T 12 FC 66 XLH70_D1.4 Rebar #4 + E70T-1&9 1G CJP 08-12-13 T 13 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 10-23-13 T 14 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 06-06-17 T

1 FC01 71CD1.1T5157000Corbin, Trevor Pipe 4"+ E71T-1&9 5F 08-01-17 T

2 FC 15 71CD1.1 PLUG E71T-1&9 1G 03-08-17 T

3 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 03-08-17 T

4 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 6G 02-08-18 T 5 FC 35 XLH70D1.1 Term PL E70T-1&9 1G 03-10-16 T 6 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 12-05-15 T 7 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 06-13-17 T 8 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 02-06-18 T 9 077.1-U4a-XLH70D1.8 Unlimited E70T-1&9 1G 04-30-19 T

1 FC 05 71CD1.1G3304800Gasca, Jose Unlimited E71T-1&9 3F dn 01-19-07 T

2 FC 15 71CD1.1 PLUG E71T-1&9 1G 11-06-15 T

3 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 11-02-15 T

4 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 6G 01-04-02 T 5 FC 35 XLH70D1.1 Term PL E70T-1&9 1G 11-05-03 T T 6 SM 01 LH70D1.1 Pipe 4"+ E7018 5F 10-07-13 T 7 SM 02 LH70D1.1 T=1/8-3/4 E7018 3G up 4G 04-29-98 T T 8 FC 66 XLH70_D1.4 Rebar #4 + E70T-1&9 1G CJP 08-12-13 T 9 FC 97 XLH70D1.4 Rebar #4 + E71T-1&9 2G PJP 01-13-00 T 10 077.1-U4a-XLH70D1.8 Unlimited E70T-1&9 1G 04-30-19 T

1 D1.1G1329300Guzman, Otoniel T=1/8-3/4 E71T-1&9 4G 09-15-06 T

3 FC 15 71CD1.1 PLUG E71T-1&9 1G 12-14-17 T

4 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 12-14-17 T

5 FC 26 71CD1.1 T=1/8-3/4 E71T-1&9 3G up 08-05-04 T 6 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 12-14-17 T 7 GM 07 MS4+D1.1 Pipe 3/4-4 ER 70S-4 2F. 3F dn 12-28-11 T 8 FC 96 71CD1.3 12ga-3/16" E71T-1&9 3G dn 06-04-08 T 9 FC 97 XLH70D1.4 Rebar #4 + E71T-1&9 2G PJP 10-07-11 T

23Jun21 12:54 DB:Production Pg 12 of 279 Weld Procedure Specs

1 072.1-U4a-XLH70D1.1N5355400Hemanee, Noppanet Term PL E70T-1&9 1G 05-08-17 T 2 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 08-30-17 T

3 FC 15 71CD1.1 PLUG E71T-1&9 1G 06-12-17 T

4 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 06-12-17 T

5 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 06-09-17 T 6 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 06-08-17 T 7 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 06-06-17 T

1 001-12-71CD1.1M5489500Keo-Ounheuane, Khounthong

Unlimited E71T-1&9 3F up 04-11-19 T

2 072.1-U4a-XLH70D1.1 Term PL E70T-1&9 1G 03-18-19 T 3 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 08-21-18 T

1 FC01 71CD1.1K6489400Keopine, Pongpyda Pipe 4"+ E71T-1&9 5F 06-20-16 T

2 FC 15 71CD1.1 PLUG E71T-1&9 1G 11-06-15 T

3 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 10-01-15 T

4 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 6G 02-08-18 T 5 FC 35 XLH70D1.1 Term PL E70T-1&9 1G 12-05-15 T 6 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 09-21-15 T 7 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 12-30-15 T 8 SM 01 LH70D1.1 Pipe 4"+ E7018 5F 07-17-17 T 9 FC 66 XLH70_D1.4 Rebar #4 + E70T-1&9 2G CJP 12-30-15 T 10 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 06-06-17 T

1 FC01 71CD1.1L3531500Long, Caleb Pipe 4"+ E71T-1&9 5F 10-26-11 T 2 FC01 71CD1.1 Unlimited E71T-1&9 3F up 05-29-08 T

3 FC 15 71CD1.1 PLUG E71T-1&9 1G 01-05-18 T

4 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 01-04-18 T

5 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 6G 08-19-14 T 6 FC 26 71CD1.1 T=1/8-3/4 E71T-1&9 3G up 08-17-12 T 7 FC 35 XLH70D1.1 Term PL E70T-1&9 1G 12-22-13 T T 8 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 01-16-18 T 9 SM 01 LH70D1.1 Unlimited E7018 3F up 03-05-15 T 10 FC 96 71CD1.3 12ga-3/16" E71T-1&9 3G dn 04-23-10 T 11 SM 18 LH70D1.3 20 ga Galv E7018 Flat 01-04-02 T 12 FC 66 XLH70_D1.4 Rebar #6 + E70T-1&9 1G CJP 08-17-12 T

1 012-12-RPR-71CD1.1M4572600Miller, Michael Unlimited E71T-1&9 3F dn 05-05-16 T 2 FC01 71CD1.1 Unlimited E71T-1&9 3F up 4F 06-01-16 T 3 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 06-15-17 T 4 FC 01 XLH70D1.1 Unlimited E70T-1&9 2F 03-04-15 T

5 FC 15 71CD1.1 PLUG E71T-1&9 1G 06-12-17 T

6 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 06-12-17 T

7 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 06-11-15 T T 8 SM 01 LH70D1.1 Pipe 4"+ E7018 5F 06-15-17 T

1 001-12-71CD1.1O4665200Ortega, Mario Unlimited E71T-1&9 3F up 06-15-19 T 2 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 05-29-18 T

23Jun21 12:54 DB:Production Pg 13 of 279 Weld Procedure Specs

1 FC 01 XLH70D1.1P5713200Ponce, Rodolfo Unlimited E70T-1&9 2F 10-03-17 T

2 FC 15 71CD1.1 PLUG E71T-1&9 1G 12-04-17 T

3 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 12-04-17 T

4 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 11-30-17 T 5 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 12-05-18 T

1 FC01 71CD1.1Y3719900Promkhan, Pravit Pipe 4"+ E71T-1&9 5F 10-07-13 T 2 FC 05 71CD1.1 Unlimited E71T-1&9 3F dn 01-20-15 T

3 FC 15 71CD1.1 PLUG E71T-1&9 1G 11-06-15 T

4 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 10-28-15 T

5 FC 35 XLH70D1.1 Term PL E70T-1&9 1G 06-13-07 T 6 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 05-14-08 T 7 SM 01 LH70D1.1 Pipe 4"+ E7018 5F 11-16-15 T 8 FC 66 XLH70_D1.4 Rebar #4 + E70T-1&9 1G CJP 08-12-13 T 9 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 03-24-12 T

1 072.1-U4a-XLH70D1.1D2753950Rodriguez, David Term PL E70T-1&9 1G 05-02-17 T 2 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 01-13-18 T

3 FC 15 71CD1.1 PLUG E71T-1&9 1G 01-04-18 T

4 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 01-04-18 T

5 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 1G Rotated 01-04-17 T 6 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 06-24-16 T T 7 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 12-20-16 T 8 FC 96 71CD1.1 Unlimited E71T-1&9 3F up 09-15-17 T 9 FC 96 71CD1.3 12ga-3/16" E71T-1&9 3G dn 09-15-17 T 10 SM 18 LH70D1.3 20 ga Galv E7018 Flat 09-15-17 T 11 077.1-U4a-XLH70D1.8 Unlimited E70T-1&9 1G 04-28-21 T

1 012-12-RPR-71CD1.1A3753600Rodriguez, Jose Unlimited E71T-1&9 3F dn 08-24-01 T T 2 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 10-26-11 T 3 FC 26 71CD1.1 T=1/8-3/4 E71T-1&9 3G up 4G 12-13-01 T T 4 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 6G 08-14-14 T 5 GM 07 MS4+D1.1 Pipe 3/4-4 ER 70S-4 2F. 3F dn 01-23-12 T

6 SM 01 LH70D1.1 T=1/8-3/4 E7018 4F 12-13-01 T T

7 SM 02 LH70D1.1 T=1/8-3/4 E7018 3G up 4G 10-27-00 T 8 SM 02 LH70D1.1 T=1/8-3/4 E7018 3G up 05-25-99 T T 9 SM 02 LH70D1.1 Unlimited E7018 3F dn 12-13-01 T T 10 FC 97 XLH70D1.4 Rebar #4 + E71T-1&9 2G PJP 01-13-00 T

1 072.1-U4a-XLH70D1.1J5762500Rush, Joseph Term PL E70T-1&9 1G 03-28-18 T T 2 075-U4a-71CD1.1 Pipe 3/4-4 E71T-1&9 2G 05-01-20 T 3 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 07-21-17 T 4 FC 96 71CD1.1 Unlimited E71T-1&9 3F up 09-06-18 T 5 SM 01 LH70D1.1 Unlimited E7018 3F up 09-06-18 T

23Jun21 12:54 DB:Production Pg 14 of 279 Weld Procedure Specs

1 072.1-U4a-XLH70D1.1S5769100Sameuchay, Somchay

Term PL E70T-1&9 1G 05-03-17 T

2 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 07-01-17 T

3 FC 15 71CD1.1 PLUG E70T-1&9 1G 07-26-17 T

4 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 07-26-17 T

5 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 02-07-17 T T 6 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 12-14-17 T 7 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 08-02-17 T

1 072.1-U4a-XLH70D1.1S7769300Sameuchay, Somchit Term PL E70T-1&9 1G 01-13-18 T 2 075-U4a-71CD1.1 Pipe 3/4-4 E71T-1&9 2G 03-11-19 T 3 FC01 71CD1.1 Unlimited E71T-1&9 3F up 06-20-18 T

4 FC 15 71CD1.1 PLUG E71T-1&9 1G 01-04-18 T

5 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 01-04-18 T

6 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 12-02-17 T 7 FC 96 71CD1.1 Unlimited E71T-1&9 4F 07-10-18 T 8 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 01-04-18 T

1 072.1-U4a-XLH70D1.1S1769900Sanchez, Miguel Term PL E70T-1&9 1G 12-04-17 T

3 FC01 71CD1.1 Unlimited E71T-1&9 3F up 09-05-13 T

4 FC 15 71CD1.1 PLUG E71T-1&9 1G 12-14-17 T

5 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 12-14-17 T

6 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 12-14-17 T 7 GM 07 MS4+D1.1 Pipe 3/4-4 ER 70S-4 2f, 3F dn 05-10-19 T 8 FC 96 71CD1.3 12ga-3/16" E71T-1&9 3G dn 10-30-13 T

1 075-U4a-XLH70D1.1S4770900Sarla, Anthony Unlimited E70T-1&9 2G 06-17-19 T

1 075-U4a-XLH70D1.1S3806700Sperry, Skyler Unlimited E70T-1&9 2G 10-20-20 T

1 075-U4a-XLH70D1.1U1903300Villagomez, Jose Unlimited E70T-1&9 2G 06-17-19 T

1 FC01 71CD1.1Y2947800Wiriyasanti, Saduak Pipe 4"+ E71T-1&9 5F 10-07-13 T

2 FC 15 71CD1.1 PLUG E70T-1&9 1G 11-06-15 T

3 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 11-09-15 T

4 FC 35 XLH70D1.1 Term PL E70T-1&9 1G 07-09-07 T 5 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 10-22-15 T 6 SM 01 LH70D1.1 Pipe 4"+ E7018 5F 11-16-15 T 7 SM 02 LH70D1.1 Tack E7018 3F up 05-08-08 T 8 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 03-24-12 T

23Jun21 12:54 DB:Production Pg 15 of 279 Weld Procedure Specs

Attach: T, Electrode Attach: T Plant: B

1 FC 15 71CD1.1C1138300Chaysouang, Bounsathiane

PLUG E71T-1&9 1G 10-20-17 T

2 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 10-20-17 T

3 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 6G 08-02-04 T 4 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 09-01-96 5 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 05-14-08 T 6 SM 01 LH70D1.1 Pipe 4"+ E7018 5F 08-29-17 T 7 SM 02 LH70D1.1 T=1/8-3/4 E7018 3G up 4G 06-01-97 T T 8 FC 66 XLH70_D1.4 Rebar #6 + E71T-1&9 1G PJP 12-13-90 T

1 FC01 71CD1.1C2152500Colunga Delgado, Mario

Pipe 4"+ E71T-1&9 5F 12-21-17 T

2 FC 15 71CD1.1 PLUG E71T-1&9 1G 11-11-17 T

3 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 11-11-17 T

4 FC 35 XLH70D1.1 Term PL E70T-1&9 1G 12-20-14 T T 5 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 08-19-14 T T 6 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 11-11-17 T 7 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 11-14-17 T

1 072.1-U4a-XLH70D1.1G5302500Gallegos Huitron, Gerardo

Term PL E70T-1&9 1G 05-03-17 T

2 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 06-15-17 T 3 FC 01 71CD1.1 Unlimited E71T-1&9 3F up 04-19-17 T

4 FC 15 71CD1.1 PLUG E71T-1&9 1G 06-12-17 T

5 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 06-12-17 T

6 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 10-19-16 T T 7 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 06-09-17 T 8 GM 07 MS4+D1.1 Pipe 3/4-4 ER 70S-4 2F, 3F dn 05-10-19 T 9 FC 96 71CD1.3 12ga-3/16" E71T-1&9 3G dn 09-15-17 T 10 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 06-06-17 T

1 FC 26 71CD1.1L2303450Garcia Jacobo, Leonel

T=1/8-3/4 E71T-1&9 3G up 08-05-04 T

2 GM 07 MS4+D1.1 Pipe 3/4-4 ER 70S-4 2F, 3F dn 05-10-19 T 3 SM 01 LH70D1.1 Unlimited E7018 3F up 4F 04-22-08 T 4 FC 96 71CD1.3 12ga-3/16" E71T-1&9 3G dn 04-22-08 T

1 072.1-U4a-XLH70D1.1J4303250Garcia Jr., Refugio Term PL E70T-1&9 1G 08-24-17 T 2 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 08-25-17 T 3 FC 05 71CD1.1 Unlimited E71T-1&9 3F dn 03-12-19 T

4 FC 15 71CD1.1 PLUG E71T-1&9 1G 08-11-17 T

5 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 08-11-17 T

6 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 05-12-17 T T 7 GM 07 MS4+D1.1 Pipe 3/4-4 ER 70S-4 2F, 3F dn 05-10-19 T 8 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 08-24-17 T

23Jun21 12:54 DB:Production Pg 16 of 279 Weld Procedure Specs

Attach: T, Electrode Attach: T Plant: B

1 D1.1P1319800Gonzaga, Primitivo T=1/8-3/4 E71T-1&9 4G 11-04-18 T 2 072.1-U4a-XLH70D1.1 Term PL E70T-1&9 1G 02-20-20 T 3 FC 01 XLH70D1.1 Unlimited E70T-1&9 2F 11-04-18 T 4 FC 26 71CD1.1 T=1/8-3/4 E71T-1&9 3G dn 11-04-18 T 5 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 11-04-18 T 6 GM 07 MS4+D1.1 Pipe 3/4-4 ER 70S-4 2F. 3F dn 05-10-19 T

1 FC 26 71CD1.1M1582000Morales, Fidel T=1/8-3/4 E71T-1&9 3G up 4G 10-14-05 T 2 GM 07 MS4+D1.1 Pipe 3/4-4 ER 70S-4 2F. 3F dn 12-28-11 T 3 SM 01 LH70D1.1 Unlimited E7018 3F up 4F 06-16-04 T 4 SM 02 LH70D1.1 Tack E7018 3F up 05-25-04 T

1 FC01 71CD1.1A2708500Pina Gallegos, Armando

Unlimited E71T-1&9 4F 09-10-08 T

2 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 01-25-18 T 3 FC 01 XLH70D1.1 Unlimited E70T-1&9 2F 10-08-03 T

4 FC 15 71CD1.1 PLUG E71T-1&9 1G 01-16-18 T

5 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 01-16-18 T

6 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 05-25-04 7 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 01-16-18 T 8 SM 01 LH70D1.1 Unlimited E7018 3F up 4F 04-22-08 T 9 SM 01 LH70D1.1 Unlimited E7018 3F up 06-16-04 T 10 FC 96 71CD1.3 12ga-3/16" E71T-1&9 3G dn 09-10-08 T

1 FC 01 71CD1.1R5741700Reynoso, Jose Unlimited E71T-1&9 3F up 4F 08-03-17 T 2 FC 05 71CD1.1 Unlimited E71T-1&9 3F dn 08-03-17 T

3 FC 15 71CD1.1 PLUG E71T-1&9 1G 02-05-18 T

4 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 02-05-18 T

5 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 6G 02-07-18 T 6 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 02-06-18 T

//END OF REPORT

23Jun21 12:54 DB:Production Pg 17 of 279 Weld Procedure Specs

GAYLE MANUFACTURING COMPANY �

GMC PQR FC 27_ LAST(0ºF) Tests

D1.8-09 Annex: CVN HEAT INPUT ENVELOPE TESTING

DEMAND CRITICAL ELECTRODES

I. Lowest Anticipated Service Temperature (LAST)

A. 6.3.6 “Lowest Anticipated Service Temperature Application. “For Demand Critical (DC) Welds in applications where the SFRS is subjected to service temperatures below +50 deg F…..the minimum CVN of 40 ft-lbf…shall be provided at a test temperature not more than 20 deg F above the Lowest Anticipated Service Temperature.”

B. Test temperature 20° F shall result in a LAST of 0° F

II. Test Acceptance Criteria:

A. A7.1 Strength & Ductility Requirements shall be as per Tbl A.2.

B. Table A.2 All weld metal mechanical properties:

1. Yield min:……....58 ksi.

2. Tensile min:……70 ksi.

3. Elongation min:..22% measured in a 2"gage length

4. CVN Toughness min: 40 ft-lb @ 20 deg F.

a) Discard the highest & Lowest values.

b) Remaining (3 of 5) CVN test results

(a) Must average CVN 40 ft-lbs @ 20° F

(b) (2 of 3) must shall equal or exceed CVN 40 ft-lbf @ 20° F.

(c) One of the three may be a lower CVN, but not less than 30 ft-lbf.

III. Test Notes:

A. Fig. A.1-Heat Input Envelope Test Plate

1. All weld metal tensile test specimen

a) (1) ea. Per test assembly.

2. CVN Impact test specimens.

a) (5) ea. Per test assembly.

B. A5.3 Warpage:

1. A completed test plate that is warped more than 5° from flat shall be discarded.

a) Straightening is not allowed.

b) Fig A1 allows up to an optional 5° preset in the test assembly to counter distortion.

(1 of 29)

Glenn W Holmes CWI 96oeo991

QC1 EXP. 61112014

23Jun21 12:54 DB:Production Pg 18 of 279 Weld Procedure Specs

C. Preheat & Interpass temperature.

1. A5.1 Interpass temperature shall be measured 1 in. from the center of the groove, as shown in Fig A.1.

2. A5.2 The computed heat input value for each weld pass shall not vary from the desired heat input value by more than ±20%

IV. Low Heat Envelope Testing Procedure Notes:

A. Table A.1: Low Heat Input: 30 kJ/in.

1. Heat Input of 30 kJ/in computed ±20% range is 24 to 36 kJ/in.

B. Preheat Maximum Temperature: 120° F

C. Interpass Maximum Temperature: 250° F

D. C-A5.2. For the Low input test, interruptions of welding, for cooling, is allowed to maintain a max. interpass temperature of 250°F.

V. High Heat Envelope Testing Procedure Notes:

A. Table A.1: High Heat Input: 80 kJ/in.

1. Heat Input of 80 kJ/in computed ±20% range is 64 to 96 kJ/in

B. Preheat Minimum Temperature: 250ºF

C. Tbl A.1 (a) The high heat input test requires that upon initial min. preheat of 250ºF, welding shall continue without substantial, deliberate interruption, until the 450ºF interpass temperature is achieved.

1. C-A5.2. Several passes, without interruption of weld processes may be used to achieve the initial 450ºF interpass temperature.

a) Weld processes include cleaning and measurement of the interpass temperatures, etc.

D. A 450ºF preheat or interpass temperature shall be maintained for all subsequent weld passes.

VI. WPS Production Settings

A. C-A1. Production WPSs may utilize any combination of welding variables that result in a computed heat input that is not greater than the high or less than the low heat envelope test limit.

B. C-A3 Production preheat and interpass temperature controls are to be in accordance with this code and AWS D1.1, and will likely not be the same as the limits of Table A.1.

(2 of 29)

23Jun21 12:54 DB:Production Pg 19 of 279 Weld Procedure Specs

(3 of 29)

23Jun21 12:54 DB:Production Pg 20 of 279 Weld Procedure Specs

FC 27 E7018 LAST- Low

Gayle Manufacturing Co.

Procedure Qualification Record

FC 27 E7018 LAST- LowPQR No. Date By10/14/2015 Glenn Holmes

Welding Process(es) Reference WPS No.SMAW

Type

JOINT

Type 0 deg F LAST Testing Low

Backing Material

Root Opening Root Face Dimension1/2"

Groove Angle Radius (J-U)45 deg

Method

BASE METALS

Material Spec.

Type or Grade

Thickness: Groove ( ) Fillet ( )3/4in

A572 A572to

Gr 50toGr 50

Diameter (Pipe, )

FILLER METALS

AWS Specification

AWS Classification

A5.1 LCN JW LH70

E7018 H4R

SHIELDING

Flux Gas

Composition Flow Rate

Gas Cup Size

Electrode-Flux (Class)

NA

POSITION

Position of Groove Fillet

Vertical Progression:

1G

ELECTRICAL CHARACTERISTICS

Transfer Mode (GMAW):

Current:

Other

Tungsten Electrode (GTAW):

Size Type

NA NA

TECHNIQUE

Stringer or Weave Bead

Multi-pass or Single Pass (per side)

Number of Electrodes

Electrode Spacing: Longitudinal

Lateral Angle

Contact Tube to Work Distance

Peening

Interpass Cleaning

Stringer

D1.1-10tb3.7

NA Push

None

D1.1-10 sec. 5.30.1

PREHEAT

Preheat Temp., Min.

Interpass Temp., Min. Max.

POSTWELD HEAT TREATMENT

Temp.

Time

50 to 120F 50 to 250F 250 deg F

WELDING PROCEDURE

Backing

A36

Revision

Authorized By Date 02/21/2011Glenn Holmes

Back Gouging

Manual Machine

AutoSemi-Auto

Yes

Single Weld Double Weld

Up Down

Short-Circuiting Globular Spray

AC DCEP DCEN Pulsed

No

1/2" 45°

CJP

Typ.

" M in

A36 back up typ.

5" Min. 5" Min.

3/8 Min. Typ.

D1.8-09 Annex A Heat Input Envelope Testing.

Fig. A.1 Heat Envelope Test Plate

LD

TA

L

TE

IM

N

IMPACT SPECIMEN

CL

A/A

B/B

Sect. B/B

Sect. A/A

1" m

1/

Le ng th

1" min.

Point of Temperature Measurement

20° F Testing for 0° LAST

Preset Up To 5° as Reqd.

Required

Layer/Pass Process Filler Metal Class Diameter Cur. Type Amps or WFS Volts Travel Speed Other Notes

SMAW E7018 1/8 DCEP 130 21-22 5-6 28-34 kJ/in (Actual) 1/8 DCEP 120 24 5-7 80 kJ/in -/-20%

(4 of 29)

Required Heat Range

@ 30 kJ/in +/- 20% =

24 to 36 kJ/in.

Lincoln Jetweld

E7018 (1/8" dia.)

Heat Envelope Testing

LAST = 0 F

Testing @ 20 F

LOW Heat

23Jun21 12:54 DB:Production Pg 21 of 279 Weld Procedure Specs

FC 27 E7018 LAST- Low

TEST RESULTS

TENSILE TEST

Specimen no. Width Thickness Area

Ultimate tensile load, lb

Ultimate unit stress, psi

Character of failure and location

1(#1) 0.505 0.2 15210 lbs. 12720 lbs. ALL WELD METAL

3(#2) 0.505 0.2 15430 lbs. 12160 lbs. ALL WELD METAL

5(#3) 0.505 0.2 15270 lbs. 12400 lbs. ALL WELD METAL

GUIDED BEND TEST

Specimen no. Type of bend Result Remark

VISUAL INSPECTION

Appearance

Undercut

Piping porosity

Convexity

Test date

Witnessed by

Satisfactory

10/21/2011

Charles O'Hare CTS

Radiographic-ultrasonic examination

Welder's name

Test conducted by

Test number

Clock no. Stamp no.

Laboratory

Per

Manufacturer By Date

Title

RT report no:

UT report no:

Result

FILLET WELD TEST RESULTS

Minimum size multiple pass Maximum size single pass

Macroetch Macroetch

1.

2.

NA 1. NA

All-weld-metal tension test

Tensile strength, psi

Yield point/strength, psi

Elongation in 2 in.,%

Laboratory test no.

84.5K, 77.0K, 76.5K

70.5K, 63.5K, 62.5K

24%, 34%, 28%

PR61861 #1, 3, & 5

Other Test

Richard Munoz 589501 R1

Construction Testing Services

CTS Job #8039A Charles O'Hare CTS

Gayle Manufacturing Glenn Holmes

Quality Control Manager

10/25/2011

3. 3.

ALL WELD METAL CVN TEST @ 20 Deg F #1 Min: 154, 139, 126 ft-lbs. Average.= 140 ft-lbs.

#2 Min: 132, 129, 125 ft-lbs. Average = 129 ft-lbs.

#3 Min: 94, 54, 80 ft-lbs. Average = 76 ft-lbs.

Reference:

CTS 8039A CVN Test......(Pg 4, 5. & 6 of 9) CTS 8039A Tensile Test..(Pg 1 & 2 of 5)

We, the undersigned, certify that the statements in this record are correct and that the test welds were prepared, welded, and tested in accordance with the requirements of AWS D1.1-2010 Clause 4 & D1.8-09 Annex A, Heat Input Envelope Testing

(5 of 29)

23Jun21 12:54 DB:Production Pg 22 of 279 Weld Procedure Specs

Page 1 of

FC 27 E7018 LAST- High

FC 27 E7018 LAST- HighPQR No. Date By10/25/2011 Glenn Holmes

Welding Process(es) Reference WPS No.SMAW

Type 0 deg F LAST Testing High

A5.1 LCN JW LH70

E7018 H4R

250 deg F

450 deg F 550 deg F

Authorized By Date 10/21/2011Glenn Holmes

SMAW E7018 1/8 DCEP 155 24 2.5 - 3 74-89 kJ/in (Actual)

(6 of 29)

@ 80 kJ/in +/- 20% =

64 to 96 kJ/in.

Heat Envelope Testing

LAST = 0 F

HIGH Heat

23Jun21 12:54 DB:Production Pg 23 of 279 Weld Procedure Specs

Page 2 of

FC 27 E7018 LAST- High

2(#1) 0.505 0.2 14850 lbs. 12160 lbs ALL WELD METAL

4(#2) 0.505 0.2 14900 lbs. 12510 lbs. ALL WELD METAL

6(#3) 0.505 0.2 14700 lbs. 12000 lbs. ALL WELD METAL

74.5K, 74.5K, 73.5K

61.5K, 62.5K, 60.0K

34%, 30%, 27%

PR61861 #2, 4, & 6

,ALL WELD METAL CVN TEST @ 20 Deg F #1 Max: 164, 175, 183 ft-lbs. Average.= 174 ft-lbs.

#2 Max: 136, 142, 173 ft-lbs. Average = 150 ft-lbs.

#3 Max: 170, 159, 171 ft-lbs. Average = 167 ft-lbs Reference:

CTS 8039A CVN Test......(Pg 4, 5. & 6 of 9) CTS 8039A Tensile Test..(Pg 1 & 2 of 5)

We, the undersigned, certify that the statements in this record are correct and that the test welds were prepared, welded, and tested in accordance with the requirements of AWS D1.1-2010 Clause 4 & D1.8-09 Annex A, Heat Input Envelope Testing

(7 of 29)

23Jun21 12:54 DB:Production Pg 24 of 279 Weld Procedure Specs

FC 27 71C LAST- Low

FC 27 71C LAST- LowPQR No. Date By10/25/2011 Glenn Holmes

Welding Process(es) Reference WPS No.FCAW-G

A5.20 LCN UC 71C, CVN

E71T-1&9 C H8 40ftlb@ 70degF

Cored

CO2

100 %

45 CFH

1 1/4"

FCAW-G E7 T-1&9 .045 DCEP 170/300 25 7-10 kJ/in

(8 of 29)

@ 30 kJ/in. +/- 20% =

Lincoln Ultracore 71C

E71T-1&9 (.045" dia.)

23Jun21 12:54 DB:Production Pg 25 of 279 Weld Procedure Specs

FC 27 71C LAST- Low

7(#1) 0.505 0.2 17100 lbs. 15720 lbs. ALL WELD METAL

9(#2) 0.505 0.2 16500 lbs. 15190 lbs. ALL WELD METAL

11(#3) 0.505 0.2 16700 lbs. 15300 lbs. ALL WELD METAL

85.5K, 82.5K, 83.5K

78.5K, 76.0K, 75.5K

24%, 28%, 28%

PR61861 #7, 9, & 11

#1 Min: 54, 45, 52 ft-lbs. Average.= 51 ft-lbs.

#2 Min: 62, 75, 110 ft-lbs. Average = 82 ft-lbs.

#3 Min: 51, 58, 59 ft-lbs. Average = 56 ft-lbs.

Reference:

CTS 8039A CVN Test......(Pg 7, 8. & 9 of 9) CTS 8039A Tensile Test..(Pg 2 & 3 of 5)

We, the undersigned, certify that the statements in this record are correct and that the test welds were prepared, welded, and tested in accordance with the requirements of AWS D1.1-2010 Clause 4 & D1.8-09 Annex A, Heat Input Envelope Testing

(9 of 29)

23Jun21 12:54 DB:Production Pg 26 of 279 Weld Procedure Specs

FC 27 71C LAST- High

FC 27 71C LAST- HighPQR No. Date By10/25/2011 Glenn Holmes

A5.20 LCN UC 71C, CVN

E71T-1&9 C H8 40ftlb@ 70degF

NA Pull

FCAW-G E7 T- 1 & 9 .045 DCEP 260/600 29 5-7 kJ/in +/-20%

(10 of 29)

@ 80kJ/in +/- 20% =

23Jun21 12:54 DB:Production Pg 27 of 279 Weld Procedure Specs

FC 27 71C LAST- High

8(#1) 0.505 0.2 15730 lbs. 13800 lbs. ALL WELD METAL

10(#2) 0.505 0.2 15880 lbs. 14030 lbs. ALL WELD METAL

12(#3) 0.505 0.2 15920 lbs. 14070 lbs. ALL WELD METAL

78.5K,79.5K,79.5K

69.0K, 70.0K, 70.5K

23%, 22%, 22%

PR61861 #8, 10, & 12

CTS Job#3039A Charles O'Hare CTS

#1 Max: 74, 55, 59 ft-lbs. Average.= 63 ft-lbs.

#2 Max: 124, 98, 93 ft-lbs. Average = 105 ft-lbs.

#3 Max: 60, 58, 55 ft-lbs. Average = 58 ft-lbs.

Reference:

CTS 8039A CVN Test......(Pg 7, 8. & 9 of 9) CTS 8039A Tensile Test..(Pg 2 & 3 of 5)

We, the undersigned, certify that the statements in this record are correct and that the test welds were prepared, welded, and tested in accordance with the requirements of AWS D1.1-2010 Clause 4 & D1.8-09 Annex A, Heat Input Envelope Testing

(11 of 29)

23Jun21 12:54 DB:Production Pg 28 of 279 Weld Procedure Specs

FC 27 XLH70 LAST- Low

FC 27 XLH70 LAST- LowPQR No. Date By10/25/2011 Glenn Holmes

A5.20 OS XLH70, CVN

E70T-1&9 C H8 40ftlb@ 70degF

FCAW-G E70T- 1 & 9 3/32" DCEP 350/150 25 21 25 kJ/in (Actual)

(12 of 29)

Lincoln Outershield XLH 70 E70T-1&9 (3/32" dia.)

Heat Envelope Testing

LAST = 0 F

@ 30 kJ/in +/-20%

23Jun21 12:54 DB:Production Pg 29 of 279 Weld Procedure Specs

FC 27 XLH70 LAST- Low

13(#1) 0.505 0.2 19190 lbs. 17340 lbs. All Weld Metal

15(#2) 0.505 0.2 18870 lbs. 17120 lbs. All Weld Metal

17(#3) 0.505 0.2 18970 lbs. 16890 lbs. All Weld Metal

96.0K, 94.5K, & 95.0K

86.5K, 85.5K, & 84.5K

23%, 29%, & 25%

PR61861 #13, 15, & 17

#1 Min: 120, 113, 120 ft-lbs. Average.= 118 ft-lbs.

#2 Min: 112, 109, 112 ft-lbs. Average = 111 ft-lbs.

#3 Min: 99, 109, 101 ft-lbs. Average = 103 ft-lbs.

Reference:

CTS 8039A CVN Test......(Pg 1,2 & 3 of 9) CTS 8039A Tensile Test..(Pg 4 & 5 of 5)

We, the undersigned, certify that the statements in this record are correct and that the test welds were prepared, welded, and tested in accordance with the requirements of AWS D1.1-2010 Clause 4 & D1.8-09 Annex A, Heat Input Envelope Testing

(13 of 29)

23Jun21 12:54 DB:Production Pg 30 of 279 Weld Procedure Specs

FC 27 XLH70 LAST- High

FC 27 XLH70 LAST- HighPQR No. Date By10/25/2011 Glenn Holmes

A5.20 OS XLH70, CVN

E70T-1&9 C H8 40ft-lb @ 70 dF

FCAW-G E70T-1&9 3/32" DCEP 570/300 33 14-15 75-81 (Actual)

(14 of 29)

@80 kJ/in +/-20% =

23Jun21 12:54 DB:Production Pg 31 of 279 Weld Procedure Specs

FC 27 XLH70 LAST- High

14(#1) 0.505 0.2 18280 lbs. 15510 lbs. All Weld Metal

16(#2) 0.505 0.2 17700 lbs. 15120 lbs. All Weld Metal

18(#3) 0.505 0.2 17860 lbs. 15120 lbs. All Weld Metal

91.5K, 88.5K, & 89.5K

77.5K, 75.5K, & 75.5K

26%, 26%, & 25%

PR61861 #14, 16, & 18

#1 Max: 45, 51, 45 ft-lbs. Average.= 47 ft-lbs.

#2 Max: 64, 62, 55 ft-lbs. Average = 60 ft-lbs.

#3 Max: 84, 72, 80 ft-lbs. Average = 79 ft-lbs.

Reference:

CTS 8039A CVN TEST.............(Pg 1,2 & 3 of 9) CTS 8039A TENSILE TESTS...(Pg 4 & 5 of 5)

We, the undersigned, certify that the statements in this record are correct and that the test welds were prepared, welded, and tested in accordance with the requirements of AWS D1.1-2010 Clause 4 & D1.8-09 Annex A, Heat Input Envelope Testing

(15 of 29)

23Jun21 12:54 DB:Production Pg 32 of 279 Weld Procedure Specs

Laboratory: Pleasanton Date: 10/25/2011 Page 1 of 5

Sampled by: C.O'hare

Test Number 1 2 3 4

Sample Designation #1 #1 #2 #2

Mill Gayle Gayle Gayle Gayle

Imput Min Input Max Input Min Input Max Input

Electrode/ Diameter 7018/ 1/8" 7018/ 1/8" 7018/ 1/8" 7018/ 1/8"

Diameter (in) 0.505 0.505 0.505 0.505

Area, Sq. Ins. 0.18 0.2 0.2 0.2

Yield Point, Lbs. 12720 12160 12720 12510

Maximum Load, Lbs. 15210 14850 15430 14900

Yield Strength, Lbs. Per Sq. In. 70500 61000 63500 62500

TESTING

INSPEC TIO N

ENG INEERING

Date of Sampling: 10/21/2011

Project: PQR Testing Place of Sampling: GayleLab Log No.: PR 61861

Job No.: 8039A

C O NSTRUC TIO N

TESTING SERVIC ES

TENSILE TESTS

Tensile Strength, Lbs. Per Sq. In. 84500 74500 77000 74500

Elongation in 2, Inches 0.48 0.68 0.48 0.6

Total Elongation 24% 34% 24% 30%

Remarks:

Construction Testing Services, Inc.

By:

Jonathan Felts, Testing Laboratory Supervisor

Results reported to: Distribution List

4770 Duckhorn Drive, Sacramento, CA 95834 | (916) 419-4747 office | (916) 419-4774 fax

2174 Rheem Drive, Suite A | Pleasanton, CA 94588 | (925) 462-5151 office | (925) 462-5183 fax

Test Equipment: INSTRON 1000HDX

Yield determined by autographic diagram method. Items tested in accordance with AWS D1.8, Annex A.

(16 of 29)

23Jun21 12:54 DB:Production Pg 33 of 279 Weld Procedure Specs

Laboratory: Pleasanton Date: 10/25/2011 Page 2 of 5

Test Number 5 6 7 8

Sample Designation #3 #3 #1 #1

Electrode/ Diameter 7018/ 1/8" 7018/ 1/8" E71T-1C/ .045 E71T-1C/ .045

Area, Sq. Ins. 0.2 0.2 0.2 0.2

Yield Point, Lbs. 12400 12000 15720 13800

Maximum Load, Lbs. 15270 14700 17100 15730

Yield Strength, Lbs. Per Sq. In. 62000 60000 78500 69000

Project: PQR Testing Lab Log No.: PR 61861 Place of Sampling: Gayle

Job No.: 8039A Date of Sampling: 10/21/2011

Tensile Strength, Lbs. Per Sq. In. 76500 73500 85500 78500

Elongation in 2, Inches 0.55 0.54 0.48 0.46

Total Elongation 28% 27% 24% 23%

(17 of 29)

23Jun21 12:54 DB:Production Pg 34 of 279 Weld Procedure Specs

Laboratory: Pleasanton Date: 10/25/2011 Page 3 of 5

Test Number 9 10 11 12

Sample Designation #2 #2 #3 #3

Electrode/ Diameter E71T-1C/ .045 E71T-1C/ .045 E71T-1C/ .045 E71T-1C/ .045

Yield Point, Lbs. 15190 14030 15300 14070

Maximum Load, Lbs. 16500 15880 16700 15920

Yield Strength, Lbs. Per Sq. In. 76000 70000 76500 70500

Tensile Strength, Lbs. Per Sq. In. 82500 79500 83500 79500

Elongation in 2, Inches 0.55 0.44 0.56 0.44

Total Elongation 28% 22% 28% 22%

(18 of 29)

23Jun21 12:54 DB:Production Pg 35 of 279 Weld Procedure Specs

Laboratory: Pleasanton Date: 10/25/2011 Page 4 of 5

Test Number 13 14 15 16

Sample Designation #1 #1 #2 #2

Electrode/ Diameter E70T-1/ 3/32" E70T-1/ 3/32" E70T-1/ 3/32" E70T-1/ 3/32"

Yield Point, Lbs. 17340 15510 17120 15120

Maximum Load, Lbs. 19190 18280 18870 17700

Yield Strength, Lbs. Per Sq. In. 86500 77500 85500 75500

Tensile Strength, Lbs. Per Sq. In. 96000 91500 94500 88500

Elongation in 2, Inches 0.46 0.52 0.58 0.52

Total Elongation 23% 26% 29% 26%

(19 of 29)

23Jun21 12:54 DB:Production Pg 36 of 279 Weld Procedure Specs

Laboratory: Pleasanton Date: 10/25/2011 Page 5 of 5

Test Number 17 18

Sample Designation #3 #3

Mill Gayle Gayle

Imput Min Input Max Input

Electrode/ Diameter E70T-1/ 3/32" E70T-1/ 3/32"

Diameter (in) 0.505 0.505

Area, Sq. Ins. 0.2 0.2

Yield Point, Lbs. 16890 15120

Maximum Load, Lbs. 18970 17860

Yield Strength, Lbs. Per Sq. In. 84500 75500

Tensile Strength, Lbs. Per Sq. In. 95000 89500

Elongation in 2, Inches 0.49 0.5

Total Elongation 25% 25%

(20 of 29)

23Jun21 12:54 DB:Production Pg 37 of 279 Weld Procedure Specs

Laboratory: Pleasanton Date: 10/21/11 Page 1 of 9

Material: 3/32" E70T

Sample ID

#1 Min - 1

#1 Min - 2

#1 Min - 3

#1 Min - 4

#1 Min - 5

#1 Max - 1

#1 Max - 2

#1 Max - 3

#1 Max - 4

#1 Max - 5

Charles O'Hare, ASNDT Level III

Testing was performed by qualfied personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.

All Weld

Average - 47

10mm x 10mm

Average - 118

Tested at 20ºF

10mm x 10mm 120

Test Equipment: Wiedemann S1-1C S/N: S11-1061

Project: PQR Testing

CHARPY V-NOTCH IMPACT

Machined and tested in accordance with ASTM A370.

Specimens meet the requirements of 40 ftlbf@20ºF.

Place of Sampling: Gayle

Size Absorbed Energy, Ft.Lbs.

Sampled By: C. O'Hare

Orientation to Base Metal

(21 of 29)

23Jun21 12:54 DB:Production Pg 38 of 279 Weld Procedure Specs

Laboratory: Pleasanton Date: 10/21/11 Page 2 of 9

#2 Min - 1

#2 Min - 2

#2 Min - 3

#2 Min - 4

#2 Min - 5

#2 Max - 1

#2 Max - 2

#2 Max - 3

#2 Max - 4

#2 Max - 5

10mm x 10mm 129

Average - 111

Testing was performed by qualfied personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.

Average - 60

(22 of 29)

23Jun21 12:54 DB:Production Pg 39 of 279 Weld Procedure Specs

Laboratory: Pleasanton Date: 10/21/11 Page 3 of 9

#3 Min - 1

#3 Min - 2

#3 Min - 3

#3 Min - 4

#3 Min - 5

#3 Max - 1

#3 Max - 2

#3 Max - 3

#3 Max - 4

#3 Max - 5

Testing was performed by qualfied personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.

Average - 79

Average - 103

(23 of 29)

23Jun21 12:54 DB:Production Pg 40 of 279 Weld Procedure Specs

Laboratory: Pleasanton Date: 10/22/11 Page 4 of 9

Material: 1/8" 7018

10mm x 10mm 154

Average - 140

Testing was performed by qualfied personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.

Average - 174

(24 of 29)

23Jun21 12:54 DB:Production Pg 41 of 279 Weld Procedure Specs

Laboratory: Pleasanton Date: 10/22/11 Page 5 of 9

Testing was performed by qualfied personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.

Average - 150

Average - 129

(25 of 29)

23Jun21 12:54 DB:Production Pg 42 of 279 Weld Procedure Specs

Laboratory: Pleasanton Date: 10/22/11 Page 6 of 9

10mm x 10mm 94

Average - 76

Testing was performed by qualfied personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.

Average - 167

(26 of 29)

23Jun21 12:54 DB:Production Pg 43 of 279 Weld Procedure Specs

Laboratory: Pleasanton Date: 10/22/11 Page 7 of 9

Material: 0.045" E71T-1C

Testing was performed by qualfied personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .