140G0321Q0208_portfolio.pdf
PDF 18 MB Posted
- Attached to
- M2M LAB SPECIAL INSPECTIONS Federal contract opportunity
- Solicitation number
- 140G0321Q0208
About this file
This solicitation is seeking offers for materials testing and special inspections for a new laboratory building at the NASA Research Park in Moffett Field, California. The Department of the Interior US Geological Survey Office of Acquisitions and Grants is requesting these services to support construction of the new facility. Offerors should submit proposals in response to solicitation number 140G0321Q0208 by the specified due date to be considered for award of a contract to provide laboratory special inspections and materials testing. Relevant services include conducting on-site tests and inspections to verify building components meet design standards, as well as materials testing to ensure structural integrity and compliance with specifications. The location of the work is specified as the NASA Research Park in Moffett Field.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140G0321Q0208_Amd_0001.pdf | ||
| Sol_140G0321Q0208.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
USGS Research Facility Job # 5020159
NASA Ames Research Center, Parcel 15
Menlo Park, CA
Submittal Date:
Submittal Number:
Transmitted For:
Submittal Description:
HENSEL PHELPS CONSTRUCTION CO.
REVIEWED
REVISE & RESUBMIT
NO EXCEPTIONS TAKEN
MAKE CORRECTIONS NOTED
REJECTED
THIS SUBMITTAL HAS BEEN REVIEWED FOR GENERAL COM-
PLIANCE WITH THE CONTRACT DOCUMENTS. APPROVAL DOES
NOT RELIEVE THE SUBCONTRACTOR/SUPPLIER OF THE RESPON-
SIBILITY FOR CONFORMANCE TO THE QUALITY STANDARDS
AS SET FORTH IN THE CONTRACT DOCUMENTS NOR DOES
IT RELIEVE RESPONSIBILITY FOR FIELD VERIFICATION OF
ALL CONDITIONS RELATING TO THE WORK OF SUBCON-
TRACTOR/SUPPLIER. SUBCONTRACTOR/SUPPLIER IS RESPON-
SIBLE FOR DIMENSIONS AND QUANTITIES OF MATERIALS
RELATING TO THIS CONTRACT.
CK'D BY
SUBMITTAL NO.
DATESM 6/14/11
00020330000 x x
07/16/2021
006 - 05 12 00 - 0
CG 07/16/21
006 - 05 12 00 - 0
H P C
S T A M
A E
S T A
O W N E R
A
Includes Shop Welding Procedure Specifications (WPS), Procedure Qualification Records (PQRs), Weld Wire Product Literature, and Shop Welder Qualification Record.
Please Note that all welds at SLRS (Seismic Load Resisting System) members and DC (Demand Critical) welds will be welded using the WPS with Lincoln OSXLH70, weld requirements for SLRS and DC welds).
SUBMITTAL
Approval
No:
06-23-2021 Date:
Project:
Hensel Phelps Construction Co.
1735 Technology Drive Suite 125 San Jose, CA 95110
Jesse Osburn Mobile: (408) 857-5243
Web Site GMC Sub 01 - GMC Shop WPS
USGS Menlo to MoffettRe:
Submittal 1Type #:
Name:
Deliver Via:
Submitted for approval. In order to maintain the schedule, please return this submittal approved to our office not later than 07-07-2021.
If you have any questions please contact:
Shared on Box ~
743 GMC Sub 01 - GMC Shop WPS 06-23-2021
Element Print Size Items Copies Drawing Included (Format: DwgNum-Rev)
8 1/2 x 11 1 1 743 Standard Shop WPS letter (CID 062321-05)
8 1/2 x 11 279 1 743 GMC Sub 01 - GMC Shop WPS
Totals: 280 2
GAYLE MANUFACTURING COMPANY Letter of Transmittal
Pg 1 of 1 R2130: Letter of TransmittalPrinted: 23-Jun-21 13:07 DB:
Production
Sort by Name, Std Only: F, Inc. R1550: T, WPS Attach: T, Electrode Attach: T USGS Menlo to Moffett P:743
# Std WPS FEMA Chpy Weld Joint Description D1 Ref PQR Weldwire Dia Root Prep BG Position DateRevPLDescription
1 T 0_PQR 27
LAST TEST
ALL ALL DC Weld
Joint D1.8 Annex
A
PQR
LAST
All DC Electro de
_D1.8
LAST_0
deg F
All 05-22-194ABLAST (0°F) CVN Heat Input Testing
2 T 001-12-HD-C Fillet T T-Joint Fig.3.5 PREQ E71T- 1&9C-
H8
CO2 UltraCore
HD-C
0" All 09-24-201ABFillet T Joint Skew ±10° max
T < 3" WQTR
3F,4F,5F Test
3 T 001-12-LH70 T T Fillet T T-Joint Fig.3.5
TC-F12-GF
PREQ E7018
H4R
Jetweld
LH70
1/8" 0" T All 06-15-196AFillet T Joint
T < 3"
4 T 001-12-
XLH70
T T Fillet T T Joint Fig.3.5
TC-F12-GF
PREQ E70T-
CO2 Outershield
3/32" 0" 1F, 2F 09-04-197AFillet T Joint
5 T 003-12-71C T T Fillet L Lap-Joint Fig.3.5.
L-F12-GF
PREQ E71T-
71C
.045" 0" All 06-15-196AFillet Lap Joint T < 3"
6 T 003-12-HD-C T T Fillet L Lap-Joint Fig.3.5. L-
F12-GF
0" All 09-24-201ABFillet Lap Joint T
7 T 003-12-LH70 T T Fillet L Lap-Joint Fig.3.5.
PREQ E7018
1/8" 0" All 06-15-196AFillet Lap Joint T
8 T 003-12 -
T T Fillet L Lap-Joint Fig.3.5.
3/32" 0" 1F, 2F 06-15-196AFillet Lap Joint T
9 T 004-12a-
T T Fillet L Lap-Joint Fig.3.5.
L-F12a-GF
3/32" 0" 1F, 2F 06-15-196AFillet Lap Joint T > 3” inc.
10 T 005-12A-71C T T Fillet T T-Joint Fig.3.4(A) PREQ E71T-
.045" 0" All 06-15-196AFillet T Joint Skew 60°-135° inc No Prep T < 3"
11 T 005-12A-HD-
T T Fillet T T-Joint Fig.3.4(A) PREQ E71T-
12 T 005-12A-
T T Fillet T T-Joint Fig.3.4(A) PREQ E7018
1/8" 0" All 06-15-196AFillet T Joint
13 T 005-12A-
T T Fillet T T Joint Fig.3.4(A) PREQ E70T-
3/32" 0" 1F, 2F 06-15-196AFillet T Joint
GAYLE MANUFACTURING COMPANY R1540: Weld Procedure Specs
23Jun21 12:54 DB:Production Pg 1 of 279 Weld Procedure Specs
# Std WPS FEMA Chpy Weld Joint Description D1 Ref PQR Weldwire Dia Root Prep BG Position DateRevPLDescription 14 T 006-12B-71C T T Fillet T T-Joint Fig.3.4 (B) PREQ E71T-
.045" 0" as reqd.
All 06-15-196AFillet T Joint inc Prep As Reqd
15 T 006-12B-HD-
T T Fillet T T-Joint Fig.3.4 (B) PREQ E71T-
0" as
All 09-24-201ABFillet T Joint
16 T 006-12B-
T T Fillet T T-Joint Fig.3.4 (B) PREQ E7018
1/8" 0" as
17 T 006-12B-
T T Fillet T T Joint Fig.3.4 (B) PREQ E70T-
3/32" 0" as
1F, 2F 06-15-196AFillet T Joint
18 T 007-12C-71C T T Fillet T T-Joint Fig.3.4 (C) PREQ E71T-
Skew 60°- 90° inc PL>100° Prep As Reqd T < 3"
19 T 007-12C-HD-
T T Fillet T T-Joint Fig.3.4 (C) PREQ E71T-
20 T 007-12C-
T T Fillet T T-Joint Fig.3.4 (C) PREQ E7018
21 T 007-12C-
T T Fillet T T Joint Fig.3.4 (C) PREQ E70T-
22 T 008-12D-71C T T Fillet T T-Joint Fig.3.4 (D) PREQ E71T-
Skew 60°- 30°
23 T 008-12D-HD-
T T Fillet T T Joint Fig.3.4 (D) PREQ E71T-
24 T 008-12D-
T T Fillet T T-Joint Fig.3.4 (D) PREQ E7018
23Jun21 12:54 DB:Production Pg 2 of 279 Weld Procedure Specs
# Std WPS FEMA Chpy Weld Joint Description D1 Ref PQR Weldwire Dia Root Prep BG Position DateRevPLDescription 25 T 008-12D-
T T Fillet T T Joint Fig.3.4 (D) PREQ E70T-
26 T 009-12-PIPE-
T T Fillet T T-Joint FIg.9.10 PREQ E71T-
.045" 0" All 06-15-196AFillet T Joint Tubular Skew = 30°Dia (B) = 1/3 or = 0.80 @ b
27 T 009-12-PIPE-
T T Fillet T T-Joint FIg.9.10 PREQ E71T-
28 T 009-12-PIPE-
T T Fillet T T-Joint Fig.9.10 PREQ E7018
1/8" 0" All 06-15-196AFillet T Joint
29 T 009-12-PIPE-
T T Fillet T T Joint Fig.9.10 PREQ E70T-
3/32" 0" 1F, 2F 06-15-196AFillet T Joint
30 T 010-12-TACK
-71C
T T Fillet T Tack 5.17 PREQ E71T-
.045" All 06-15-196ATack Weld & Construction Aid
31 T 010-12-TACK
-HD-C
T T Fillet T Tack 5.17 PREQ E71T-
All 09-24-201ABTack Weld &
32 T 010-12-TACK
-LH70
T T Fillet T Tack 5.17 PREQ E7018
1/8" All 06-15-196ATack Weld &
33 T 012-12-RPR-
T T Fillet RPR T-Joint - Repair
3.7.1 PREQ E71T-
.045" All 06-15-196AFillet Undercut Repair S = 3/16"
34 T 012-12-RPR-
T T Fillet RPR T-Joint -
3.7.1 PREQ E71T-
All 09-24-201ABFillet Undercut Repair S = 3/16"
35 T 013-12-RPR-
T T Fillet T T-Joint -
5.21.4 & 5.25(p1)
All 09-24-201ABFillet Root or short matl W = Less of 2t or 3/4
36 T 013-12-RPR-
T T Fillet T T Joint -
3/32" 1F, 2F 06-15-196AFillet Root or short matl W = Less of 2t or 3/4
23Jun21 12:54 DB:Production Pg 3 of 279 Weld Procedure Specs
# Std WPS FEMA Chpy Weld Joint Description D1 Ref PQR Weldwire Dia Root Prep BG Position DateRevPLDescription
37 T 014-12-RPR-
.045" All 06-15-196ASurfacing Weld Build-Up Material to Reduce Gap
38 T 014-12-RPR-
All 09-24-201ABSurfacing Weld Build-Up Material to Reduce Gap
39 T 015-12-RB-
T T Fillet T T-Joint D1.4 fig.3.5 (A)
0" All 09-24-201ABFillet T-Joint Rebar
40 T 024-12-PLUG
-71C
T T Fillet Plug Fillet: Plug / Slot Hole
2.4.4 PREQ E71T-
.045" 0" All 06-15-196AFillet @ Plug or Slot Holes
41 T 024-12-PLUG
-HD-C
T T Fillet Plug Fillet: Plug / Slot Hole
2.4.4 PREQ E71T-
0" All 09-24-201ABFillet @ Plug or Slot Holes
42 T 025-PLUG-
T T Plug Plug Plug / Slot 3.10, 5.24 PREQ E71T-
.045" 0" All 09-04-197APlug or Slot Weld
43 T 025-PLUG-
T T Plug Plug Plug / Slot 3.10, 5.24 PREQ E71T-
0" All 09-24-201ABPlug or Slot Weld
44 T 026-PLUG-
RPR-71C
T T Plug Plug Plug / Slot 3.10, 5.24, 5.25.5
.045" T All 06-15-196APlug Mislocated Holes/Slots
45 T 026-PLUG-
RPR-HD-C
T All 09-24-201ABPlug Mislocated
46 T 026-PLUG-
RPR-XLH70
3/32" 1G, 2G 06-15-196APlug Mislocated
47 T 036-P4-71C T T PJP BTC Single Bevel Groove
Fig.3.2
BTC-P4-GF
.045" 0" 45° All 06-15-196APJP (1) Side Single Bevel
48 T 036-P4-HD-C T T PJP BTC Single Bevel
Fig.3.2 BTC
-P4-GF
0" 45° All 09-24-201ABPJP (1) Side
49 T 036-P4-
T T PJP BTC Single Bevel
BTC-P4-GF
3/32" 0" 45° 1G, 2G 06-15-196APJP (1) Side
50 T 040-P5-HD-C T T PJP BTC Double Bevel
Fig.3.2 BTC-
P5-GF
0" 45° All 09-24-201ABPJP (2) SideDouble Bevel
23Jun21 12:54 DB:Production Pg 4 of 279 Weld Procedure Specs
# Std WPS FEMA Chpy Weld Joint Description D1 Ref PQR Weldwire Dia Root Prep BG Position DateRevPLDescription 51 T 040-P5-
T T PJP BTC Double Bevel
BTC-P5-GF
3/32" 0" 45° 1G, 2G 06-15-196APJP (2)
SideDouble Bevel
52 T 041-P6-HD-C T T PJP BC Single U
Fig.3.2 BC-
P6-GF
0" 20° T All 09-24-201ABPJP (1) Side Single U Groove T =1/4"
53 048-P8-LEN-
T T PJP / Fill T Single J
2.6.4.2 PQR
FCAW
54/54
.6
E71T-
.045" 0" 45° All 06-15-196APJP (1) Side Single J Groove Lenton Coupler = #9
54 048-P8-LEN-
HDC
T T PJP / Fill T Single J
2.6.4.2 PQR
54/54
.6
E71T-
0" 45° All 05-06-217APJP (1) Side
Lenton Coupler = #9
55 T 052-P10-71C T T PJP BTC Flare Bevel Fig.3.2
BTC-P10-GF
.045" 0" All 06-15-196APJP (1) Side Flare Bevel
56 T 052-P10-HD-
T T PJP BTC Flare Bevel Fig.3.2 BTC-
P10-GF
0" All 09-24-201ABPJP (1) Side
57 T 052-P10-
T T PJP BTC Flare Bevel
BTC-P10-GF
3/32" 0" 1G, 2G 06-15-196APJP (1) Side
58 T 057-P11-71C T T PJP B Flare V
B-P11-GF
.045" 0" All 06-15-196APJP (1) Side Flare V Groove Butt Joint
59 T 057-P11-HD-
T T PJP B Flare V
Fig.3.2 B-
P11-GF
0" All 09-24-201ABPJP (1) Side
60 T 057-P11-
T T PJP B Flare V
B-P11-GF
3/32" 0" 1G, 2G 06-15-196APJP (1) Side
61 T 059-L1a-71C T T CJP B Square
Fig.3.3 B-L1a-GF
.045" 0" 0° All 06-15-196ACJP/BU (1) Side Square Groove T = 3/8" max.
62 T 059-L1a-HD-
T T CJP B Square
Fig.3.3 B- L1a-GF
0" 0" All 09-24-201ABCJP/BU (1) Side Square Groove T = 3/8" max.
63 T 065-U2a-HD-
T T CJP B Single V
Fig.3.3 PREQ E71T-
1/4" 45° All 09-24-201ABCJP/BU (1) Side Single V Groove 1/4" @ 45°
64 T 070-U4a-HD-
T T CJP B Single Bevel
U4a-GF
3/16" 30° All 09-24-201ABCJP/BU (1) Side
Groove T = 3/4"
23Jun21 12:54 DB:Production Pg 5 of 279 Weld Procedure Specs
# Std WPS FEMA Chpy Weld Joint Description D1 Ref PQR Weldwire Dia Root Prep BG Position DateRevPLDescription 65 T 070-U4a-
B-U4a-GF
3/32" 3/16" 30° 1G, 2G 06-15-196ACJP/BU (1) Side
66 T 071-U4a-HD-
T T CJP TC Single Bevel
Fig.3.3 TC-
3/16" 30° All 09-24-201ABCJP/BU (1) Side
67 T 071-U4a-
TC-U4a-GF
3/32" 3/16" 30° 1G, 2G 06-15-196ACJP/BU (1) Side
68 T 072-U4a-HD-
1/4" 30° All 09-24-201ABCJP/BU (1) Side
69 T 072-U4a-
3/32" 1/4" 30° 1G 06-15-196ACJP/BU (1) Side
70 T 074-U4a-71C T T CJP TC Single Bevel
.045" 1/4" 30° All 06-15-196ACJP/BU (1) Side
Groove 1G T = 3/4"
71 T 074-U4a-HD-
1/4" 30° All 09-24-201ABCJP/BU (1) Side
72 T 074-U4a-
3/32" 1/4" 30° 1G 06-15-196ACJP/BU (1) Side
73 T 075-U4a-71C T T CJP B Single Bevel
.045" 1/4" 45° All 06-15-196ACJP/BU (1) Side
Groove T > 3/4”
74 T 075-U4a-HD-
75 T 075-U4a-
3/32" 1/4" 45° 1G, 2G 06-15-196ACJP/BU (1) Side
76 T 076-U4a-71C T T CJP BTC Single Bevel
B_TC-U4a-
GF
.045" 1/4" 45° All 06-15-196ACJP/BU (1) Side
77 T 076-U4a-HD-
T T CJP BTC Single Bevel
Fig 3.3 PREQ E71T-
23Jun21 12:54 DB:Production Pg 6 of 279 Weld Procedure Specs
# Std WPS FEMA Chpy Weld Joint Description D1 Ref PQR Weldwire Dia Root Prep BG Position DateRevPLDescription 78 T 076-U4a-
B_TC-U4a-
3/32" 1/4" 45° 1G, 2G 06-15-196ACJP/BU (1) Side
79 T 077.1-U4a-
Fig.3.3 PREQ E70T-
7/16" 30° 1G 06-01-196ACJP/BU (1) Side
Groove 1
80 T 077-U4a-HD-
Fig.3.3 PREQ E71T-
3/8" 30° 1G, 2G 09-24-201ABCJP/BU (1) Side
Groove 1 1/16" = T < 2
81 T 078-U4b-HD-
B_TC-U4b-
0" 45° T All 09-24-201ABCJP/BG (1) Side
Groove No Root or BU
82 T 085-U5-HD-C T T CJP B Double Bevel
U5-GF
0" 45° T All 09-24-201ABCJP/BG (2) Side Double Bevel
83 T 086-U5-HD-C T T CJP TC Double Bevel
U5-GF
0" 45° T All 09-24-201ABCJP/BG (2) Side
84 T 086-U5-
T T CJP TC Double Bevel
TC-U5-GF
3/32" 0" 45° 1G, 2G 06-15-196ACJP/BG (2) Side
85 T 092-U6-RPR-
T T CJP RPR Single U Groove -
ASTM A6
D1.8.6.18.5
20° min.
T All 09-24-201ABCJP/BG (1) Side
ASTM A6 Surface
86 T 092-U6-RPR-
ASTM A6
D1.8.6.18.5
3/32" 20° min.
1G, 2G 06-15-196ACJP/BG (1) Side
ASTM A6 Surface
87 T 093-U6-HD-C T T CJP B Single U
Fig.3.3. B_C
-U6-GF
0" 20° T All 09-24-201ABCJP/BG (1) Side
88 T 094-U6-RPR-
B_C-U6-GF
.045" 0" 20° T All 06-15-196ACJP/BG (1) Side
PZ Zone Weld
23Jun21 12:54 DB:Production Pg 7 of 279 Weld Procedure Specs
# Std WPS FEMA Chpy Weld Joint Description D1 Ref PQR Weldwire Dia Root Prep BG Position DateRevPLDescription
89 T 094-U6-RPR-
Fig.3.3 B_C
-U6-GF
0" 20° T All 09-24-201ABCJP/BG (1) Side
90 T 094-U6-RPR-
B_C-U6-GF
3/32" 0" 20° 1G, 2G 06-15-196ACJP/BG (1) Side
91 T 096-U7-71C T T CJP B Double U
B-U7-GF
.045" 0" 20° T All 06-15-196ACJP/BG (2) Side Double U Groove
92 T 096-U7-HD-C T T CJP B Double U
Fig.3.3 B-U7
-GF
0" 20° T All 09-24-201ABCJP/BG (2) Side
93 T 096-U7-
T T CJP B Double U
3/32" 0" 20° 1G, 2G 06-15-196ACJP/BG (2) Side
94 T 097-U7-RPR-
.045" 0" 20° T All 06-15-196ACJP/BG (2) Side
95 T 097-U7-RPR-
Fig.3.3 B-U7
-GF
0" 20° T All 09-24-201ABCJP/BG (2) Side
96 T 097-U7-RPR-
3/32" 0" 20° 1G, 2G 06-15-196ACJP/BG (2) Side
97 T 102.1 D1.8
T T CJP /
100%
DBR Single J
(Doubler
TC-U8a-GF PQR 102.1 -Dblr-
GF-
XLH7
E70T-
Varies 0° 1G 12-03-19CJP/PJP (1) Side
Doubler @ K area
98 T 102-U8a-
T T CJP /
100%
DBR Single J
(Doubler)
TC-U8a-GF
TC-P8-GF
PQR
68/60
-1
XLH7
E70T-
3/32" Varies 15°. 1G, 2G 06-15-196ACJP/PJP (1) Side
Doubler @ K area
99 T 103-U8a-HD-
T T CJP TC Single J
U8a-GF
0" 30° T All 09-24-201ABCJP/BG (1) Side Single SIde J Groove Doubler @ Web PL
23Jun21 12:54 DB:Production Pg 8 of 279 Weld Procedure Specs
# Std WPS FEMA Chpy Weld Joint Description D1 Ref PQR Weldwire Dia Root Prep BG Position DateRevPLDescription 100 T 103-U8a-
T T CJP TC Single J
TC-U8a-GF
3/32" 0" 30° 1G, 2G 06-15-196ACJP/BG (1) Side Single SIde J Groove bDoubler @ Web PL
101 T 111-STUD CJP T Stud Stud PREQ ASTM
Outershield
Varies 0" 1G 07-05-171ABStud Planar F or HA, B, & C Studs PR-19 Stud Welding
//END OF REPORT
23Jun21 12:54 DB:Production Pg 9 of 279 Weld Procedure Specs
Sort by Name, Std Only: F, Inc. R1550: T, WPS Attach: T, Electrode Attach: T Plant:
InOutDatePositionFillerThickness# Name E-Num Mark Code WPS
1 001-12-XLH70D1.1G6303050Garcia, Jose Unlimited E70T-1&9 2F 11-24-19 T
1 001-12-XLH70D1.1P3700300Petchu, Mongkol Unlimited E70T-1&9 2F 06-14-19 T
1 072.1-U4a-XLH70D1.1R2755500Rolph, Dillyn Term PL E70T-1&9 1G 05-03-17 T 2 075-U4a-71CD1.1 Pipe 3/4-4 E71T-1&9 2G 05-01-20 T 3 FC 01 71CD1.1 Unlimited E71T-1&9 3F up 4F 07-11-19 T 4 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 6G 10-24-16 T 5 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 11-03-15 T 6 SM 18 LH70D1.3 20 ga Galv E7018 Flat 10-08-18 T
1 075-U4a-XLH70D1.1X2792700Siphanounneua, Souvanh
Unlimited E70T-1&9 2G 06-30-19 T
2 FC 15 71CD1.1 PLUG E71T-1&9 1G 01-05-18 T
3 FC 15 71CD1.1 SLOT E70T-1&9 1G 01-05-18 T
GAYLE MANUFACTURING COMPANY R1550: Welder Qualifications
23Jun21 12:54 DB:Production Pg 10 of 279 Weld Procedure Specs
Attach: T, Electrode Attach: T Plant: A
1 D1.1B7081800Barnhart, Tyler Unlimited E71T-1C&9 1G & 1GR 04-15-21 T 2 012-12-RPR-71CD1.1 Unlimited E71T-1&9 3F dn 05-05-16 T 3 072.1-U4a-XLH70D1.1 Term PL E70T-1&9 1G 05-03-17 T 4 FC 01 71CD1.1 Unlimited E71T-1&9 3F up 4F 08-02-17 T
5 FC 15 71CD1.1 PLUG E71T-1&9 1G 10-20-17 T
6 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 10-20-17 T
7 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 1G Rotated 12-08-17 T 8 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 09-30-14 T T 9 SM 18 LH70D1.3 20 ga Galv E7018 Flat 09-15-17 T 10 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 10-20-17 T 11 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 11-14-17 T 12 077.1-U4a-XLH70D1.8 Unlimited E70T-1&9 1G 04-27-19 T
1 072.1-U4a-XLH70D1.1B6087100Beerbower, Robert Term PL E70T-1&9 1G 12-04-17 T 2 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 12-21-17 T
3 FC 15 71CD1.1 PLUG E71T-1&9 1G 12-15-17 T
4 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 12-04-17 T
5 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 05-30-14 T T 6 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 12-13-17 T
1 072.1-U4a-XLH70D1.1B3087150Beers, Joshua Term PL E70T-1&9 1G 09-15-17 T 2 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 09-29-17 T 3 FC 96 71CD1.1 Unlimited E71T-1&9 3F up 07-10-18 T
1 D1.1B1087200Beers, Justin Unlimited E71T-1&9 1G 04-28-21 T 2 FC01 71CD1.1 Unlimited E71T-1&9 4F 07-22-14 T
3 FC 15 71CD1.1 PLUG E71T-1&9 1G 02-02-17 T
4 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 02-02-17 T
5 FC 26 71CD1.1 T=1/8-3/4 E71T-1&9 3G up 07-22-14 T 6 SM 01 LH70D1.1 Unlimited E7018 3F up 4F 07-24-14 T 7 FC 96 71CD1.3 12ga-3/16" E71T-1&9 3G dn 11-25-14 T 8 SM 18 LH70D1.3 20 ga Galv E7018 Flat 01-04-02 T
1 D1.1K1126500Campbell, Kevin Unlimited E71T-8 3G up 4G 05-23-07 T 2 D1.1 Unlimited E7018 3G up 4G 06-16-99 T 3 065-U2a-71CD1.1 T=1/8-3/4 E71T-1&9 3G up 04-10-19 T 4 065-U2a-LH70D1.1 T=1/8-3/4 E7018 3G up 04-10-19 T 5 D1.5 Unlimited E7018 2G 06-16-99 T
23Jun21 12:54 DB:Production Pg 11 of 279 Weld Procedure Specs
1 072.1-U4a-XLH70D1.1R7127000Campos, Ricardo Term PL E70T-1&9 1G 05-08-17 T 2 072.1-U4a-XLH70D1.1 Term PL E70T-1&9 1G 05-08-17 T 3 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 08-29-17 T 4 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 10-07-13 T
5 FC 15 71CD1.1 PLUG E71T-1&9 1G 02-02-17 T
6 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 02-02-17 T
7 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 6G 02-08-18 T 8 FC 35 XLH70D1.1 Term PL E70T-1&9 1G 11-20-07 T 9 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 01-14-17 T 10 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 06-08-17 T 11 SM 01 LH70D1.1 Pipe 4"+ E7018 5F 08-29-17 T 12 FC 66 XLH70_D1.4 Rebar #4 + E70T-1&9 1G CJP 08-12-13 T 13 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 10-23-13 T 14 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 06-06-17 T
1 FC01 71CD1.1T5157000Corbin, Trevor Pipe 4"+ E71T-1&9 5F 08-01-17 T
2 FC 15 71CD1.1 PLUG E71T-1&9 1G 03-08-17 T
3 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 03-08-17 T
4 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 6G 02-08-18 T 5 FC 35 XLH70D1.1 Term PL E70T-1&9 1G 03-10-16 T 6 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 12-05-15 T 7 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 06-13-17 T 8 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 02-06-18 T 9 077.1-U4a-XLH70D1.8 Unlimited E70T-1&9 1G 04-30-19 T
1 FC 05 71CD1.1G3304800Gasca, Jose Unlimited E71T-1&9 3F dn 01-19-07 T
2 FC 15 71CD1.1 PLUG E71T-1&9 1G 11-06-15 T
3 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 11-02-15 T
4 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 6G 01-04-02 T 5 FC 35 XLH70D1.1 Term PL E70T-1&9 1G 11-05-03 T T 6 SM 01 LH70D1.1 Pipe 4"+ E7018 5F 10-07-13 T 7 SM 02 LH70D1.1 T=1/8-3/4 E7018 3G up 4G 04-29-98 T T 8 FC 66 XLH70_D1.4 Rebar #4 + E70T-1&9 1G CJP 08-12-13 T 9 FC 97 XLH70D1.4 Rebar #4 + E71T-1&9 2G PJP 01-13-00 T 10 077.1-U4a-XLH70D1.8 Unlimited E70T-1&9 1G 04-30-19 T
1 D1.1G1329300Guzman, Otoniel T=1/8-3/4 E71T-1&9 4G 09-15-06 T
3 FC 15 71CD1.1 PLUG E71T-1&9 1G 12-14-17 T
4 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 12-14-17 T
5 FC 26 71CD1.1 T=1/8-3/4 E71T-1&9 3G up 08-05-04 T 6 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 12-14-17 T 7 GM 07 MS4+D1.1 Pipe 3/4-4 ER 70S-4 2F. 3F dn 12-28-11 T 8 FC 96 71CD1.3 12ga-3/16" E71T-1&9 3G dn 06-04-08 T 9 FC 97 XLH70D1.4 Rebar #4 + E71T-1&9 2G PJP 10-07-11 T
23Jun21 12:54 DB:Production Pg 12 of 279 Weld Procedure Specs
1 072.1-U4a-XLH70D1.1N5355400Hemanee, Noppanet Term PL E70T-1&9 1G 05-08-17 T 2 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 08-30-17 T
3 FC 15 71CD1.1 PLUG E71T-1&9 1G 06-12-17 T
4 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 06-12-17 T
5 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 06-09-17 T 6 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 06-08-17 T 7 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 06-06-17 T
1 001-12-71CD1.1M5489500Keo-Ounheuane, Khounthong
Unlimited E71T-1&9 3F up 04-11-19 T
2 072.1-U4a-XLH70D1.1 Term PL E70T-1&9 1G 03-18-19 T 3 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 08-21-18 T
1 FC01 71CD1.1K6489400Keopine, Pongpyda Pipe 4"+ E71T-1&9 5F 06-20-16 T
2 FC 15 71CD1.1 PLUG E71T-1&9 1G 11-06-15 T
3 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 10-01-15 T
4 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 6G 02-08-18 T 5 FC 35 XLH70D1.1 Term PL E70T-1&9 1G 12-05-15 T 6 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 09-21-15 T 7 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 12-30-15 T 8 SM 01 LH70D1.1 Pipe 4"+ E7018 5F 07-17-17 T 9 FC 66 XLH70_D1.4 Rebar #4 + E70T-1&9 2G CJP 12-30-15 T 10 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 06-06-17 T
1 FC01 71CD1.1L3531500Long, Caleb Pipe 4"+ E71T-1&9 5F 10-26-11 T 2 FC01 71CD1.1 Unlimited E71T-1&9 3F up 05-29-08 T
3 FC 15 71CD1.1 PLUG E71T-1&9 1G 01-05-18 T
4 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 01-04-18 T
5 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 6G 08-19-14 T 6 FC 26 71CD1.1 T=1/8-3/4 E71T-1&9 3G up 08-17-12 T 7 FC 35 XLH70D1.1 Term PL E70T-1&9 1G 12-22-13 T T 8 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 01-16-18 T 9 SM 01 LH70D1.1 Unlimited E7018 3F up 03-05-15 T 10 FC 96 71CD1.3 12ga-3/16" E71T-1&9 3G dn 04-23-10 T 11 SM 18 LH70D1.3 20 ga Galv E7018 Flat 01-04-02 T 12 FC 66 XLH70_D1.4 Rebar #6 + E70T-1&9 1G CJP 08-17-12 T
1 012-12-RPR-71CD1.1M4572600Miller, Michael Unlimited E71T-1&9 3F dn 05-05-16 T 2 FC01 71CD1.1 Unlimited E71T-1&9 3F up 4F 06-01-16 T 3 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 06-15-17 T 4 FC 01 XLH70D1.1 Unlimited E70T-1&9 2F 03-04-15 T
5 FC 15 71CD1.1 PLUG E71T-1&9 1G 06-12-17 T
6 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 06-12-17 T
7 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 06-11-15 T T 8 SM 01 LH70D1.1 Pipe 4"+ E7018 5F 06-15-17 T
1 001-12-71CD1.1O4665200Ortega, Mario Unlimited E71T-1&9 3F up 06-15-19 T 2 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 05-29-18 T
23Jun21 12:54 DB:Production Pg 13 of 279 Weld Procedure Specs
1 FC 01 XLH70D1.1P5713200Ponce, Rodolfo Unlimited E70T-1&9 2F 10-03-17 T
2 FC 15 71CD1.1 PLUG E71T-1&9 1G 12-04-17 T
3 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 12-04-17 T
4 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 11-30-17 T 5 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 12-05-18 T
1 FC01 71CD1.1Y3719900Promkhan, Pravit Pipe 4"+ E71T-1&9 5F 10-07-13 T 2 FC 05 71CD1.1 Unlimited E71T-1&9 3F dn 01-20-15 T
3 FC 15 71CD1.1 PLUG E71T-1&9 1G 11-06-15 T
4 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 10-28-15 T
5 FC 35 XLH70D1.1 Term PL E70T-1&9 1G 06-13-07 T 6 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 05-14-08 T 7 SM 01 LH70D1.1 Pipe 4"+ E7018 5F 11-16-15 T 8 FC 66 XLH70_D1.4 Rebar #4 + E70T-1&9 1G CJP 08-12-13 T 9 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 03-24-12 T
1 072.1-U4a-XLH70D1.1D2753950Rodriguez, David Term PL E70T-1&9 1G 05-02-17 T 2 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 01-13-18 T
3 FC 15 71CD1.1 PLUG E71T-1&9 1G 01-04-18 T
4 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 01-04-18 T
5 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 1G Rotated 01-04-17 T 6 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 06-24-16 T T 7 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 12-20-16 T 8 FC 96 71CD1.1 Unlimited E71T-1&9 3F up 09-15-17 T 9 FC 96 71CD1.3 12ga-3/16" E71T-1&9 3G dn 09-15-17 T 10 SM 18 LH70D1.3 20 ga Galv E7018 Flat 09-15-17 T 11 077.1-U4a-XLH70D1.8 Unlimited E70T-1&9 1G 04-28-21 T
1 012-12-RPR-71CD1.1A3753600Rodriguez, Jose Unlimited E71T-1&9 3F dn 08-24-01 T T 2 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 10-26-11 T 3 FC 26 71CD1.1 T=1/8-3/4 E71T-1&9 3G up 4G 12-13-01 T T 4 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 6G 08-14-14 T 5 GM 07 MS4+D1.1 Pipe 3/4-4 ER 70S-4 2F. 3F dn 01-23-12 T
6 SM 01 LH70D1.1 T=1/8-3/4 E7018 4F 12-13-01 T T
7 SM 02 LH70D1.1 T=1/8-3/4 E7018 3G up 4G 10-27-00 T 8 SM 02 LH70D1.1 T=1/8-3/4 E7018 3G up 05-25-99 T T 9 SM 02 LH70D1.1 Unlimited E7018 3F dn 12-13-01 T T 10 FC 97 XLH70D1.4 Rebar #4 + E71T-1&9 2G PJP 01-13-00 T
1 072.1-U4a-XLH70D1.1J5762500Rush, Joseph Term PL E70T-1&9 1G 03-28-18 T T 2 075-U4a-71CD1.1 Pipe 3/4-4 E71T-1&9 2G 05-01-20 T 3 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 07-21-17 T 4 FC 96 71CD1.1 Unlimited E71T-1&9 3F up 09-06-18 T 5 SM 01 LH70D1.1 Unlimited E7018 3F up 09-06-18 T
23Jun21 12:54 DB:Production Pg 14 of 279 Weld Procedure Specs
1 072.1-U4a-XLH70D1.1S5769100Sameuchay, Somchay
Term PL E70T-1&9 1G 05-03-17 T
2 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 07-01-17 T
3 FC 15 71CD1.1 PLUG E70T-1&9 1G 07-26-17 T
4 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 07-26-17 T
5 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 02-07-17 T T 6 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 12-14-17 T 7 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 08-02-17 T
1 072.1-U4a-XLH70D1.1S7769300Sameuchay, Somchit Term PL E70T-1&9 1G 01-13-18 T 2 075-U4a-71CD1.1 Pipe 3/4-4 E71T-1&9 2G 03-11-19 T 3 FC01 71CD1.1 Unlimited E71T-1&9 3F up 06-20-18 T
4 FC 15 71CD1.1 PLUG E71T-1&9 1G 01-04-18 T
5 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 01-04-18 T
6 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 12-02-17 T 7 FC 96 71CD1.1 Unlimited E71T-1&9 4F 07-10-18 T 8 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 01-04-18 T
1 072.1-U4a-XLH70D1.1S1769900Sanchez, Miguel Term PL E70T-1&9 1G 12-04-17 T
3 FC01 71CD1.1 Unlimited E71T-1&9 3F up 09-05-13 T
4 FC 15 71CD1.1 PLUG E71T-1&9 1G 12-14-17 T
5 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 12-14-17 T
6 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 12-14-17 T 7 GM 07 MS4+D1.1 Pipe 3/4-4 ER 70S-4 2f, 3F dn 05-10-19 T 8 FC 96 71CD1.3 12ga-3/16" E71T-1&9 3G dn 10-30-13 T
1 075-U4a-XLH70D1.1S4770900Sarla, Anthony Unlimited E70T-1&9 2G 06-17-19 T
1 075-U4a-XLH70D1.1S3806700Sperry, Skyler Unlimited E70T-1&9 2G 10-20-20 T
1 075-U4a-XLH70D1.1U1903300Villagomez, Jose Unlimited E70T-1&9 2G 06-17-19 T
1 FC01 71CD1.1Y2947800Wiriyasanti, Saduak Pipe 4"+ E71T-1&9 5F 10-07-13 T
2 FC 15 71CD1.1 PLUG E70T-1&9 1G 11-06-15 T
3 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 11-09-15 T
4 FC 35 XLH70D1.1 Term PL E70T-1&9 1G 07-09-07 T 5 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 10-22-15 T 6 SM 01 LH70D1.1 Pipe 4"+ E7018 5F 11-16-15 T 7 SM 02 LH70D1.1 Tack E7018 3F up 05-08-08 T 8 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 03-24-12 T
23Jun21 12:54 DB:Production Pg 15 of 279 Weld Procedure Specs
Attach: T, Electrode Attach: T Plant: B
1 FC 15 71CD1.1C1138300Chaysouang, Bounsathiane
PLUG E71T-1&9 1G 10-20-17 T
2 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 10-20-17 T
3 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 6G 08-02-04 T 4 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 09-01-96 5 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 05-14-08 T 6 SM 01 LH70D1.1 Pipe 4"+ E7018 5F 08-29-17 T 7 SM 02 LH70D1.1 T=1/8-3/4 E7018 3G up 4G 06-01-97 T T 8 FC 66 XLH70_D1.4 Rebar #6 + E71T-1&9 1G PJP 12-13-90 T
1 FC01 71CD1.1C2152500Colunga Delgado, Mario
Pipe 4"+ E71T-1&9 5F 12-21-17 T
2 FC 15 71CD1.1 PLUG E71T-1&9 1G 11-11-17 T
3 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 11-11-17 T
4 FC 35 XLH70D1.1 Term PL E70T-1&9 1G 12-20-14 T T 5 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 08-19-14 T T 6 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 11-11-17 T 7 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 11-14-17 T
1 072.1-U4a-XLH70D1.1G5302500Gallegos Huitron, Gerardo
Term PL E70T-1&9 1G 05-03-17 T
2 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 06-15-17 T 3 FC 01 71CD1.1 Unlimited E71T-1&9 3F up 04-19-17 T
4 FC 15 71CD1.1 PLUG E71T-1&9 1G 06-12-17 T
5 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 06-12-17 T
6 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 10-19-16 T T 7 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 06-09-17 T 8 GM 07 MS4+D1.1 Pipe 3/4-4 ER 70S-4 2F, 3F dn 05-10-19 T 9 FC 96 71CD1.3 12ga-3/16" E71T-1&9 3G dn 09-15-17 T 10 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 06-06-17 T
1 FC 26 71CD1.1L2303450Garcia Jacobo, Leonel
T=1/8-3/4 E71T-1&9 3G up 08-05-04 T
2 GM 07 MS4+D1.1 Pipe 3/4-4 ER 70S-4 2F, 3F dn 05-10-19 T 3 SM 01 LH70D1.1 Unlimited E7018 3F up 4F 04-22-08 T 4 FC 96 71CD1.3 12ga-3/16" E71T-1&9 3G dn 04-22-08 T
1 072.1-U4a-XLH70D1.1J4303250Garcia Jr., Refugio Term PL E70T-1&9 1G 08-24-17 T 2 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 08-25-17 T 3 FC 05 71CD1.1 Unlimited E71T-1&9 3F dn 03-12-19 T
4 FC 15 71CD1.1 PLUG E71T-1&9 1G 08-11-17 T
5 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 08-11-17 T
6 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 05-12-17 T T 7 GM 07 MS4+D1.1 Pipe 3/4-4 ER 70S-4 2F, 3F dn 05-10-19 T 8 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 08-24-17 T
23Jun21 12:54 DB:Production Pg 16 of 279 Weld Procedure Specs
Attach: T, Electrode Attach: T Plant: B
1 D1.1P1319800Gonzaga, Primitivo T=1/8-3/4 E71T-1&9 4G 11-04-18 T 2 072.1-U4a-XLH70D1.1 Term PL E70T-1&9 1G 02-20-20 T 3 FC 01 XLH70D1.1 Unlimited E70T-1&9 2F 11-04-18 T 4 FC 26 71CD1.1 T=1/8-3/4 E71T-1&9 3G dn 11-04-18 T 5 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 11-04-18 T 6 GM 07 MS4+D1.1 Pipe 3/4-4 ER 70S-4 2F. 3F dn 05-10-19 T
1 FC 26 71CD1.1M1582000Morales, Fidel T=1/8-3/4 E71T-1&9 3G up 4G 10-14-05 T 2 GM 07 MS4+D1.1 Pipe 3/4-4 ER 70S-4 2F. 3F dn 12-28-11 T 3 SM 01 LH70D1.1 Unlimited E7018 3F up 4F 06-16-04 T 4 SM 02 LH70D1.1 Tack E7018 3F up 05-25-04 T
1 FC01 71CD1.1A2708500Pina Gallegos, Armando
Unlimited E71T-1&9 4F 09-10-08 T
2 FC01 71CD1.1 Pipe 4"+ E71T-1&9 5F 01-25-18 T 3 FC 01 XLH70D1.1 Unlimited E70T-1&9 2F 10-08-03 T
4 FC 15 71CD1.1 PLUG E71T-1&9 1G 01-16-18 T
5 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 01-16-18 T
6 FC 45 XLH70D1.1 Unlimited E70T-1&9 2G 05-25-04 7 FC 47 71CD1.1 Pipe 3/4-4 E71T-1&9 2G 01-16-18 T 8 SM 01 LH70D1.1 Unlimited E7018 3F up 4F 04-22-08 T 9 SM 01 LH70D1.1 Unlimited E7018 3F up 06-16-04 T 10 FC 96 71CD1.3 12ga-3/16" E71T-1&9 3G dn 09-10-08 T
1 FC 01 71CD1.1R5741700Reynoso, Jose Unlimited E71T-1&9 3F up 4F 08-03-17 T 2 FC 05 71CD1.1 Unlimited E71T-1&9 3F dn 08-03-17 T
3 FC 15 71CD1.1 PLUG E71T-1&9 1G 02-05-18 T
4 FC 15 XLH70D1.1 SLOT E70T-1&9 1G 02-05-18 T
5 FC 26 71CD1.1 Pipe 4"+ E71T-1&9 6G 02-07-18 T 6 FC 97 XLH70D1.4 Rebar #4 + E70T-1&9 2G PJP 02-06-18 T
//END OF REPORT
23Jun21 12:54 DB:Production Pg 17 of 279 Weld Procedure Specs
GAYLE MANUFACTURING COMPANY �
GMC PQR FC 27_ LAST(0ºF) Tests
D1.8-09 Annex: CVN HEAT INPUT ENVELOPE TESTING
DEMAND CRITICAL ELECTRODES
I. Lowest Anticipated Service Temperature (LAST)
A. 6.3.6 “Lowest Anticipated Service Temperature Application. “For Demand Critical (DC) Welds in applications where the SFRS is subjected to service temperatures below +50 deg F…..the minimum CVN of 40 ft-lbf…shall be provided at a test temperature not more than 20 deg F above the Lowest Anticipated Service Temperature.”
B. Test temperature 20° F shall result in a LAST of 0° F
II. Test Acceptance Criteria:
A. A7.1 Strength & Ductility Requirements shall be as per Tbl A.2.
B. Table A.2 All weld metal mechanical properties:
1. Yield min:……....58 ksi.
2. Tensile min:……70 ksi.
3. Elongation min:..22% measured in a 2"gage length
4. CVN Toughness min: 40 ft-lb @ 20 deg F.
a) Discard the highest & Lowest values.
b) Remaining (3 of 5) CVN test results
(a) Must average CVN 40 ft-lbs @ 20° F
(b) (2 of 3) must shall equal or exceed CVN 40 ft-lbf @ 20° F.
(c) One of the three may be a lower CVN, but not less than 30 ft-lbf.
III. Test Notes:
A. Fig. A.1-Heat Input Envelope Test Plate
1. All weld metal tensile test specimen
a) (1) ea. Per test assembly.
2. CVN Impact test specimens.
a) (5) ea. Per test assembly.
B. A5.3 Warpage:
1. A completed test plate that is warped more than 5° from flat shall be discarded.
a) Straightening is not allowed.
b) Fig A1 allows up to an optional 5° preset in the test assembly to counter distortion.
(1 of 29)
Glenn W Holmes CWI 96oeo991
QC1 EXP. 61112014
23Jun21 12:54 DB:Production Pg 18 of 279 Weld Procedure Specs
C. Preheat & Interpass temperature.
1. A5.1 Interpass temperature shall be measured 1 in. from the center of the groove, as shown in Fig A.1.
2. A5.2 The computed heat input value for each weld pass shall not vary from the desired heat input value by more than ±20%
IV. Low Heat Envelope Testing Procedure Notes:
A. Table A.1: Low Heat Input: 30 kJ/in.
1. Heat Input of 30 kJ/in computed ±20% range is 24 to 36 kJ/in.
B. Preheat Maximum Temperature: 120° F
C. Interpass Maximum Temperature: 250° F
D. C-A5.2. For the Low input test, interruptions of welding, for cooling, is allowed to maintain a max. interpass temperature of 250°F.
V. High Heat Envelope Testing Procedure Notes:
A. Table A.1: High Heat Input: 80 kJ/in.
1. Heat Input of 80 kJ/in computed ±20% range is 64 to 96 kJ/in
B. Preheat Minimum Temperature: 250ºF
C. Tbl A.1 (a) The high heat input test requires that upon initial min. preheat of 250ºF, welding shall continue without substantial, deliberate interruption, until the 450ºF interpass temperature is achieved.
1. C-A5.2. Several passes, without interruption of weld processes may be used to achieve the initial 450ºF interpass temperature.
a) Weld processes include cleaning and measurement of the interpass temperatures, etc.
D. A 450ºF preheat or interpass temperature shall be maintained for all subsequent weld passes.
VI. WPS Production Settings
A. C-A1. Production WPSs may utilize any combination of welding variables that result in a computed heat input that is not greater than the high or less than the low heat envelope test limit.
B. C-A3 Production preheat and interpass temperature controls are to be in accordance with this code and AWS D1.1, and will likely not be the same as the limits of Table A.1.
(2 of 29)
23Jun21 12:54 DB:Production Pg 19 of 279 Weld Procedure Specs
(3 of 29)
23Jun21 12:54 DB:Production Pg 20 of 279 Weld Procedure Specs
FC 27 E7018 LAST- Low
Gayle Manufacturing Co.
Procedure Qualification Record
FC 27 E7018 LAST- LowPQR No. Date By10/14/2015 Glenn Holmes
Welding Process(es) Reference WPS No.SMAW
Type
JOINT
Type 0 deg F LAST Testing Low
Backing Material
Root Opening Root Face Dimension1/2"
Groove Angle Radius (J-U)45 deg
Method
BASE METALS
Material Spec.
Type or Grade
Thickness: Groove ( ) Fillet ( )3/4in
A572 A572to
Gr 50toGr 50
Diameter (Pipe, )
FILLER METALS
AWS Specification
AWS Classification
A5.1 LCN JW LH70
E7018 H4R
SHIELDING
Flux Gas
Composition Flow Rate
Gas Cup Size
Electrode-Flux (Class)
NA
POSITION
Position of Groove Fillet
Vertical Progression:
1G
ELECTRICAL CHARACTERISTICS
Transfer Mode (GMAW):
Current:
Other
Tungsten Electrode (GTAW):
Size Type
NA NA
TECHNIQUE
Stringer or Weave Bead
Multi-pass or Single Pass (per side)
Number of Electrodes
Electrode Spacing: Longitudinal
Lateral Angle
Contact Tube to Work Distance
Peening
Interpass Cleaning
Stringer
D1.1-10tb3.7
NA Push
None
D1.1-10 sec. 5.30.1
PREHEAT
Preheat Temp., Min.
Interpass Temp., Min. Max.
POSTWELD HEAT TREATMENT
Temp.
Time
50 to 120F 50 to 250F 250 deg F
WELDING PROCEDURE
Backing
A36
Revision
Authorized By Date 02/21/2011Glenn Holmes
Back Gouging
Manual Machine
AutoSemi-Auto
Yes
Single Weld Double Weld
Up Down
Short-Circuiting Globular Spray
AC DCEP DCEN Pulsed
No
1/2" 45°
CJP
Typ.
" M in
A36 back up typ.
5" Min. 5" Min.
3/8 Min. Typ.
D1.8-09 Annex A Heat Input Envelope Testing.
Fig. A.1 Heat Envelope Test Plate
LD
TA
L
TE
IM
N
IMPACT SPECIMEN
CL
A/A
B/B
Sect. B/B
Sect. A/A
1" m
1/
Le ng th
1" min.
Point of Temperature Measurement
20° F Testing for 0° LAST
Preset Up To 5° as Reqd.
Required
Layer/Pass Process Filler Metal Class Diameter Cur. Type Amps or WFS Volts Travel Speed Other Notes
SMAW E7018 1/8 DCEP 130 21-22 5-6 28-34 kJ/in (Actual) 1/8 DCEP 120 24 5-7 80 kJ/in -/-20%
(4 of 29)
Required Heat Range
@ 30 kJ/in +/- 20% =
24 to 36 kJ/in.
Lincoln Jetweld
E7018 (1/8" dia.)
Heat Envelope Testing
LAST = 0 F
Testing @ 20 F
LOW Heat
23Jun21 12:54 DB:Production Pg 21 of 279 Weld Procedure Specs
FC 27 E7018 LAST- Low
TEST RESULTS
TENSILE TEST
Specimen no. Width Thickness Area
Ultimate tensile load, lb
Ultimate unit stress, psi
Character of failure and location
1(#1) 0.505 0.2 15210 lbs. 12720 lbs. ALL WELD METAL
3(#2) 0.505 0.2 15430 lbs. 12160 lbs. ALL WELD METAL
5(#3) 0.505 0.2 15270 lbs. 12400 lbs. ALL WELD METAL
GUIDED BEND TEST
Specimen no. Type of bend Result Remark
VISUAL INSPECTION
Appearance
Undercut
Piping porosity
Convexity
Test date
Witnessed by
Satisfactory
10/21/2011
Charles O'Hare CTS
Radiographic-ultrasonic examination
Welder's name
Test conducted by
Test number
Clock no. Stamp no.
Laboratory
Per
Manufacturer By Date
Title
RT report no:
UT report no:
Result
FILLET WELD TEST RESULTS
Minimum size multiple pass Maximum size single pass
Macroetch Macroetch
1.
2.
NA 1. NA
All-weld-metal tension test
Tensile strength, psi
Yield point/strength, psi
Elongation in 2 in.,%
Laboratory test no.
84.5K, 77.0K, 76.5K
70.5K, 63.5K, 62.5K
24%, 34%, 28%
PR61861 #1, 3, & 5
Other Test
Richard Munoz 589501 R1
Construction Testing Services
CTS Job #8039A Charles O'Hare CTS
Gayle Manufacturing Glenn Holmes
Quality Control Manager
10/25/2011
3. 3.
ALL WELD METAL CVN TEST @ 20 Deg F #1 Min: 154, 139, 126 ft-lbs. Average.= 140 ft-lbs.
#2 Min: 132, 129, 125 ft-lbs. Average = 129 ft-lbs.
#3 Min: 94, 54, 80 ft-lbs. Average = 76 ft-lbs.
Reference:
CTS 8039A CVN Test......(Pg 4, 5. & 6 of 9) CTS 8039A Tensile Test..(Pg 1 & 2 of 5)
We, the undersigned, certify that the statements in this record are correct and that the test welds were prepared, welded, and tested in accordance with the requirements of AWS D1.1-2010 Clause 4 & D1.8-09 Annex A, Heat Input Envelope Testing
(5 of 29)
23Jun21 12:54 DB:Production Pg 22 of 279 Weld Procedure Specs
Page 1 of
FC 27 E7018 LAST- High
FC 27 E7018 LAST- HighPQR No. Date By10/25/2011 Glenn Holmes
Welding Process(es) Reference WPS No.SMAW
Type 0 deg F LAST Testing High
A5.1 LCN JW LH70
E7018 H4R
250 deg F
450 deg F 550 deg F
Authorized By Date 10/21/2011Glenn Holmes
SMAW E7018 1/8 DCEP 155 24 2.5 - 3 74-89 kJ/in (Actual)
(6 of 29)
@ 80 kJ/in +/- 20% =
64 to 96 kJ/in.
Heat Envelope Testing
LAST = 0 F
HIGH Heat
23Jun21 12:54 DB:Production Pg 23 of 279 Weld Procedure Specs
Page 2 of
FC 27 E7018 LAST- High
2(#1) 0.505 0.2 14850 lbs. 12160 lbs ALL WELD METAL
4(#2) 0.505 0.2 14900 lbs. 12510 lbs. ALL WELD METAL
6(#3) 0.505 0.2 14700 lbs. 12000 lbs. ALL WELD METAL
74.5K, 74.5K, 73.5K
61.5K, 62.5K, 60.0K
34%, 30%, 27%
PR61861 #2, 4, & 6
,ALL WELD METAL CVN TEST @ 20 Deg F #1 Max: 164, 175, 183 ft-lbs. Average.= 174 ft-lbs.
#2 Max: 136, 142, 173 ft-lbs. Average = 150 ft-lbs.
#3 Max: 170, 159, 171 ft-lbs. Average = 167 ft-lbs Reference:
CTS 8039A CVN Test......(Pg 4, 5. & 6 of 9) CTS 8039A Tensile Test..(Pg 1 & 2 of 5)
We, the undersigned, certify that the statements in this record are correct and that the test welds were prepared, welded, and tested in accordance with the requirements of AWS D1.1-2010 Clause 4 & D1.8-09 Annex A, Heat Input Envelope Testing
(7 of 29)
23Jun21 12:54 DB:Production Pg 24 of 279 Weld Procedure Specs
FC 27 71C LAST- Low
FC 27 71C LAST- LowPQR No. Date By10/25/2011 Glenn Holmes
Welding Process(es) Reference WPS No.FCAW-G
A5.20 LCN UC 71C, CVN
E71T-1&9 C H8 40ftlb@ 70degF
Cored
CO2
100 %
45 CFH
1 1/4"
FCAW-G E7 T-1&9 .045 DCEP 170/300 25 7-10 kJ/in
(8 of 29)
@ 30 kJ/in. +/- 20% =
Lincoln Ultracore 71C
E71T-1&9 (.045" dia.)
23Jun21 12:54 DB:Production Pg 25 of 279 Weld Procedure Specs
FC 27 71C LAST- Low
7(#1) 0.505 0.2 17100 lbs. 15720 lbs. ALL WELD METAL
9(#2) 0.505 0.2 16500 lbs. 15190 lbs. ALL WELD METAL
11(#3) 0.505 0.2 16700 lbs. 15300 lbs. ALL WELD METAL
85.5K, 82.5K, 83.5K
78.5K, 76.0K, 75.5K
24%, 28%, 28%
PR61861 #7, 9, & 11
#1 Min: 54, 45, 52 ft-lbs. Average.= 51 ft-lbs.
#2 Min: 62, 75, 110 ft-lbs. Average = 82 ft-lbs.
#3 Min: 51, 58, 59 ft-lbs. Average = 56 ft-lbs.
Reference:
CTS 8039A CVN Test......(Pg 7, 8. & 9 of 9) CTS 8039A Tensile Test..(Pg 2 & 3 of 5)
We, the undersigned, certify that the statements in this record are correct and that the test welds were prepared, welded, and tested in accordance with the requirements of AWS D1.1-2010 Clause 4 & D1.8-09 Annex A, Heat Input Envelope Testing
(9 of 29)
23Jun21 12:54 DB:Production Pg 26 of 279 Weld Procedure Specs
FC 27 71C LAST- High
FC 27 71C LAST- HighPQR No. Date By10/25/2011 Glenn Holmes
A5.20 LCN UC 71C, CVN
E71T-1&9 C H8 40ftlb@ 70degF
NA Pull
FCAW-G E7 T- 1 & 9 .045 DCEP 260/600 29 5-7 kJ/in +/-20%
(10 of 29)
@ 80kJ/in +/- 20% =
23Jun21 12:54 DB:Production Pg 27 of 279 Weld Procedure Specs
FC 27 71C LAST- High
8(#1) 0.505 0.2 15730 lbs. 13800 lbs. ALL WELD METAL
10(#2) 0.505 0.2 15880 lbs. 14030 lbs. ALL WELD METAL
12(#3) 0.505 0.2 15920 lbs. 14070 lbs. ALL WELD METAL
78.5K,79.5K,79.5K
69.0K, 70.0K, 70.5K
23%, 22%, 22%
PR61861 #8, 10, & 12
CTS Job#3039A Charles O'Hare CTS
#1 Max: 74, 55, 59 ft-lbs. Average.= 63 ft-lbs.
#2 Max: 124, 98, 93 ft-lbs. Average = 105 ft-lbs.
#3 Max: 60, 58, 55 ft-lbs. Average = 58 ft-lbs.
Reference:
CTS 8039A CVN Test......(Pg 7, 8. & 9 of 9) CTS 8039A Tensile Test..(Pg 2 & 3 of 5)
We, the undersigned, certify that the statements in this record are correct and that the test welds were prepared, welded, and tested in accordance with the requirements of AWS D1.1-2010 Clause 4 & D1.8-09 Annex A, Heat Input Envelope Testing
(11 of 29)
23Jun21 12:54 DB:Production Pg 28 of 279 Weld Procedure Specs
FC 27 XLH70 LAST- Low
FC 27 XLH70 LAST- LowPQR No. Date By10/25/2011 Glenn Holmes
A5.20 OS XLH70, CVN
E70T-1&9 C H8 40ftlb@ 70degF
FCAW-G E70T- 1 & 9 3/32" DCEP 350/150 25 21 25 kJ/in (Actual)
(12 of 29)
Lincoln Outershield XLH 70 E70T-1&9 (3/32" dia.)
Heat Envelope Testing
LAST = 0 F
@ 30 kJ/in +/-20%
23Jun21 12:54 DB:Production Pg 29 of 279 Weld Procedure Specs
FC 27 XLH70 LAST- Low
13(#1) 0.505 0.2 19190 lbs. 17340 lbs. All Weld Metal
15(#2) 0.505 0.2 18870 lbs. 17120 lbs. All Weld Metal
17(#3) 0.505 0.2 18970 lbs. 16890 lbs. All Weld Metal
96.0K, 94.5K, & 95.0K
86.5K, 85.5K, & 84.5K
23%, 29%, & 25%
PR61861 #13, 15, & 17
#1 Min: 120, 113, 120 ft-lbs. Average.= 118 ft-lbs.
#2 Min: 112, 109, 112 ft-lbs. Average = 111 ft-lbs.
#3 Min: 99, 109, 101 ft-lbs. Average = 103 ft-lbs.
Reference:
CTS 8039A CVN Test......(Pg 1,2 & 3 of 9) CTS 8039A Tensile Test..(Pg 4 & 5 of 5)
We, the undersigned, certify that the statements in this record are correct and that the test welds were prepared, welded, and tested in accordance with the requirements of AWS D1.1-2010 Clause 4 & D1.8-09 Annex A, Heat Input Envelope Testing
(13 of 29)
23Jun21 12:54 DB:Production Pg 30 of 279 Weld Procedure Specs
FC 27 XLH70 LAST- High
FC 27 XLH70 LAST- HighPQR No. Date By10/25/2011 Glenn Holmes
A5.20 OS XLH70, CVN
E70T-1&9 C H8 40ft-lb @ 70 dF
FCAW-G E70T-1&9 3/32" DCEP 570/300 33 14-15 75-81 (Actual)
(14 of 29)
@80 kJ/in +/-20% =
23Jun21 12:54 DB:Production Pg 31 of 279 Weld Procedure Specs
FC 27 XLH70 LAST- High
14(#1) 0.505 0.2 18280 lbs. 15510 lbs. All Weld Metal
16(#2) 0.505 0.2 17700 lbs. 15120 lbs. All Weld Metal
18(#3) 0.505 0.2 17860 lbs. 15120 lbs. All Weld Metal
91.5K, 88.5K, & 89.5K
77.5K, 75.5K, & 75.5K
26%, 26%, & 25%
PR61861 #14, 16, & 18
#1 Max: 45, 51, 45 ft-lbs. Average.= 47 ft-lbs.
#2 Max: 64, 62, 55 ft-lbs. Average = 60 ft-lbs.
#3 Max: 84, 72, 80 ft-lbs. Average = 79 ft-lbs.
Reference:
CTS 8039A CVN TEST.............(Pg 1,2 & 3 of 9) CTS 8039A TENSILE TESTS...(Pg 4 & 5 of 5)
We, the undersigned, certify that the statements in this record are correct and that the test welds were prepared, welded, and tested in accordance with the requirements of AWS D1.1-2010 Clause 4 & D1.8-09 Annex A, Heat Input Envelope Testing
(15 of 29)
23Jun21 12:54 DB:Production Pg 32 of 279 Weld Procedure Specs
Laboratory: Pleasanton Date: 10/25/2011 Page 1 of 5
Sampled by: C.O'hare
Test Number 1 2 3 4
Sample Designation #1 #1 #2 #2
Mill Gayle Gayle Gayle Gayle
Imput Min Input Max Input Min Input Max Input
Electrode/ Diameter 7018/ 1/8" 7018/ 1/8" 7018/ 1/8" 7018/ 1/8"
Diameter (in) 0.505 0.505 0.505 0.505
Area, Sq. Ins. 0.18 0.2 0.2 0.2
Yield Point, Lbs. 12720 12160 12720 12510
Maximum Load, Lbs. 15210 14850 15430 14900
Yield Strength, Lbs. Per Sq. In. 70500 61000 63500 62500
TESTING
INSPEC TIO N
ENG INEERING
Date of Sampling: 10/21/2011
Project: PQR Testing Place of Sampling: GayleLab Log No.: PR 61861
Job No.: 8039A
C O NSTRUC TIO N
TESTING SERVIC ES
TENSILE TESTS
Tensile Strength, Lbs. Per Sq. In. 84500 74500 77000 74500
Elongation in 2, Inches 0.48 0.68 0.48 0.6
Total Elongation 24% 34% 24% 30%
Remarks:
Construction Testing Services, Inc.
By:
Jonathan Felts, Testing Laboratory Supervisor
Results reported to: Distribution List
4770 Duckhorn Drive, Sacramento, CA 95834 | (916) 419-4747 office | (916) 419-4774 fax
2174 Rheem Drive, Suite A | Pleasanton, CA 94588 | (925) 462-5151 office | (925) 462-5183 fax
Test Equipment: INSTRON 1000HDX
Yield determined by autographic diagram method. Items tested in accordance with AWS D1.8, Annex A.
(16 of 29)
23Jun21 12:54 DB:Production Pg 33 of 279 Weld Procedure Specs
Laboratory: Pleasanton Date: 10/25/2011 Page 2 of 5
Test Number 5 6 7 8
Sample Designation #3 #3 #1 #1
Electrode/ Diameter 7018/ 1/8" 7018/ 1/8" E71T-1C/ .045 E71T-1C/ .045
Area, Sq. Ins. 0.2 0.2 0.2 0.2
Yield Point, Lbs. 12400 12000 15720 13800
Maximum Load, Lbs. 15270 14700 17100 15730
Yield Strength, Lbs. Per Sq. In. 62000 60000 78500 69000
Project: PQR Testing Lab Log No.: PR 61861 Place of Sampling: Gayle
Job No.: 8039A Date of Sampling: 10/21/2011
Tensile Strength, Lbs. Per Sq. In. 76500 73500 85500 78500
Elongation in 2, Inches 0.55 0.54 0.48 0.46
Total Elongation 28% 27% 24% 23%
(17 of 29)
23Jun21 12:54 DB:Production Pg 34 of 279 Weld Procedure Specs
Laboratory: Pleasanton Date: 10/25/2011 Page 3 of 5
Test Number 9 10 11 12
Sample Designation #2 #2 #3 #3
Electrode/ Diameter E71T-1C/ .045 E71T-1C/ .045 E71T-1C/ .045 E71T-1C/ .045
Yield Point, Lbs. 15190 14030 15300 14070
Maximum Load, Lbs. 16500 15880 16700 15920
Yield Strength, Lbs. Per Sq. In. 76000 70000 76500 70500
Tensile Strength, Lbs. Per Sq. In. 82500 79500 83500 79500
Elongation in 2, Inches 0.55 0.44 0.56 0.44
Total Elongation 28% 22% 28% 22%
(18 of 29)
23Jun21 12:54 DB:Production Pg 35 of 279 Weld Procedure Specs
Laboratory: Pleasanton Date: 10/25/2011 Page 4 of 5
Test Number 13 14 15 16
Sample Designation #1 #1 #2 #2
Electrode/ Diameter E70T-1/ 3/32" E70T-1/ 3/32" E70T-1/ 3/32" E70T-1/ 3/32"
Yield Point, Lbs. 17340 15510 17120 15120
Maximum Load, Lbs. 19190 18280 18870 17700
Yield Strength, Lbs. Per Sq. In. 86500 77500 85500 75500
Tensile Strength, Lbs. Per Sq. In. 96000 91500 94500 88500
Elongation in 2, Inches 0.46 0.52 0.58 0.52
Total Elongation 23% 26% 29% 26%
(19 of 29)
23Jun21 12:54 DB:Production Pg 36 of 279 Weld Procedure Specs
Laboratory: Pleasanton Date: 10/25/2011 Page 5 of 5
Test Number 17 18
Sample Designation #3 #3
Mill Gayle Gayle
Imput Min Input Max Input
Electrode/ Diameter E70T-1/ 3/32" E70T-1/ 3/32"
Diameter (in) 0.505 0.505
Area, Sq. Ins. 0.2 0.2
Yield Point, Lbs. 16890 15120
Maximum Load, Lbs. 18970 17860
Yield Strength, Lbs. Per Sq. In. 84500 75500
Tensile Strength, Lbs. Per Sq. In. 95000 89500
Elongation in 2, Inches 0.49 0.5
Total Elongation 25% 25%
(20 of 29)
23Jun21 12:54 DB:Production Pg 37 of 279 Weld Procedure Specs
Laboratory: Pleasanton Date: 10/21/11 Page 1 of 9
Material: 3/32" E70T
Sample ID
#1 Min - 1
#1 Min - 2
#1 Min - 3
#1 Min - 4
#1 Min - 5
#1 Max - 1
#1 Max - 2
#1 Max - 3
#1 Max - 4
#1 Max - 5
Charles O'Hare, ASNDT Level III
Testing was performed by qualfied personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
All Weld
Average - 47
10mm x 10mm
Average - 118
Tested at 20ºF
10mm x 10mm 120
Test Equipment: Wiedemann S1-1C S/N: S11-1061
Project: PQR Testing
CHARPY V-NOTCH IMPACT
Machined and tested in accordance with ASTM A370.
Specimens meet the requirements of 40 ftlbf@20ºF.
Place of Sampling: Gayle
Size Absorbed Energy, Ft.Lbs.
Sampled By: C. O'Hare
Orientation to Base Metal
(21 of 29)
23Jun21 12:54 DB:Production Pg 38 of 279 Weld Procedure Specs
Laboratory: Pleasanton Date: 10/21/11 Page 2 of 9
#2 Min - 1
#2 Min - 2
#2 Min - 3
#2 Min - 4
#2 Min - 5
#2 Max - 1
#2 Max - 2
#2 Max - 3
#2 Max - 4
#2 Max - 5
10mm x 10mm 129
Average - 111
Testing was performed by qualfied personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Average - 60
(22 of 29)
23Jun21 12:54 DB:Production Pg 39 of 279 Weld Procedure Specs
Laboratory: Pleasanton Date: 10/21/11 Page 3 of 9
#3 Min - 1
#3 Min - 2
#3 Min - 3
#3 Min - 4
#3 Min - 5
#3 Max - 1
#3 Max - 2
#3 Max - 3
#3 Max - 4
#3 Max - 5
Testing was performed by qualfied personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Average - 79
Average - 103
(23 of 29)
23Jun21 12:54 DB:Production Pg 40 of 279 Weld Procedure Specs
Laboratory: Pleasanton Date: 10/22/11 Page 4 of 9
Material: 1/8" 7018
10mm x 10mm 154
Average - 140
Testing was performed by qualfied personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Average - 174
(24 of 29)
23Jun21 12:54 DB:Production Pg 41 of 279 Weld Procedure Specs
Laboratory: Pleasanton Date: 10/22/11 Page 5 of 9
Testing was performed by qualfied personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Average - 150
Average - 129
(25 of 29)
23Jun21 12:54 DB:Production Pg 42 of 279 Weld Procedure Specs
Laboratory: Pleasanton Date: 10/22/11 Page 6 of 9
10mm x 10mm 94
Average - 76
Testing was performed by qualfied personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is applicable only to the items listed herein. The tests performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of items tested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.
Average - 167
(26 of 29)
23Jun21 12:54 DB:Production Pg 43 of 279 Weld Procedure Specs
Laboratory: Pleasanton Date: 10/22/11 Page 7 of 9
Material: 0.045" E71T-1C
Testing was performed by qualfied personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .