Sol_140G0225Q0135_Amd_0001.pdf
PDF 157 KB Posted
- Attached to
- TIERED BAT CAGING Federal contract opportunity
- Solicitation number
- 140G0225Q0135
About this file
This document is a Standard Form 30 Amendment to a Solicitation for bat cages, issued by the USGS OAG Denver Acquisition Branch. Amendment 0001 incorporates Questions and Answers and extends the proposal due date to September 8, 2025, at 12PM ET, with questions to be sent to Justice Pryor at jpryor@usgs.gov. The Q&A section provides detailed specifications for bat cages, including material requirements (ASTM Type 304/304L stainless steel), fabrication details (1x1x18ga SS tubing, fully seam welded, TIG welded), and flexibility in design. Key design considerations include floor space (3.78-4.0 sq ft), cage depth, potential for removable panels, cage pairing options, and the ability to accommodate both bats and small passerines while withstanding autoclave temperatures up to 134 Celsius.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140G0225Q0135.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140G0225Q0135 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
GDB
DENVER CO 80225-0046
204 DENVER FEDERAL CENTER
PO BOX 25046
USGS OAG DENVER ACQUISITION BRANCH
08/28/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/28/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 0001 is issued to incorporate Questions and Answers. The due date for proposals is changed to September 8, 2025, at 12PM ET. Any additional questions are to be sent to
Justice Pryor, jpryor@usgs.gov.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Trisha Beals
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
140G0225Q0135 Amendment 1 Questions and Answers
1) Are you open to existing bat cage designs we have on file or do we need to stick to the description in the Solicitation? We have built bat cages and have some ideas that might be of interest to you and the end users.
a. The design must meet or exceed the description in the solicitation.
2) Do you need a full 4.0 square feet of floor space or is the 3.78 square feet described sufficient?
a. If dimensions can be altered to create a more stable cage without sacrificing too much floor space, that is acceptable. We plan to use these cages primarily for bats, but regularly get small passerines that could be housed in these cages as well.
3) The 17” cage depth is a slight concern, possibly making the racks a little “tippy”. Can we alter the dimensions, keeping the same square footage, to create a more stable cage rack?
a. See above, but yes as long as not too much floor space is sacrificed.
4) Do you require a squeezeback on the cages?
a. Do not require one, but not opposed (again, as long as space isn't sacrificed)
5) Do you want the cages to pair to other like cages side to side?
a. Not required but acceptable. Would the racks just connect to each other, or does this allow the option of combining two horizontal cages together?
6) Do you want removable panels above and below the removable waste pan to allow for the option to create a taller cage, for additional flight room?"
a. Not required but preferred! If this is an option, absolutely.
7) "Do you have any drawings of what this cage/rack looks like? What material are they needing this to be fabricated with?"
a. We do not have drawings of the cages. Materials are typically ASTM Type 304/304L stainless steel minimum. We would like it fabricated with stainless steel, or something equivalent, that can withstand autoclaves reaching up to 134Celcius. Frame is 1x1x18ga SS tubing, fully seam welded to prevent harborage of bacteria and vermin. Welds to be smooth and un-ground formed via Tungsten Inert Gas process. (No MIG welds). Cage to have matte (media blasted) finish. Latches, pans and certain other features to remain polished or mill finish.