B08_Attachment_1_-_Pricing_Schedule_0001.xlsx

XLSX spreadsheet 97 KB Posted

Attached to
Waste and Recycling Removal Services
Solicitation number
140G0225Q0122
Issued by

About this file

This document is a Pricing Schedule and Independent Government Estimate for a USGS project involving KOD (Knock-Out Drum) fabrication and waste/recycling removal services. The supplies portion includes a universal refrigerant vessel priced at $30,647, with the manufacturer warning that pricing is only valid for one day due to fluctuating steel costs. The labor estimate covers multiple engineering and scientific labor categories across a base year and four option years, with total labor costs of $124,824, including Junior Engineers, Senior Engineers, and Journeyman Scientists with incrementally increasing hourly rates.

The pricing schedule also includes waste management services, specifically garbage and recycling removal. The waste services are proposed for monthly pricing, with garbage pickup twice per week using a 6-yard container and recycling pickup once per week using an 8-yard container. The solicitation is issued by the Department of the Interior's US Geological Survey Office of Acquisitions and Grants, with the solicitation number 140G0225Q0122 for Waste and Recycling Removal Services. The document is marked "For Official Use Only" with source selection information protected under FAR 3.104-4.

View the file

Other files

File Type Posted
Sol_140G0225Q0122_Amd_0001.pdf PDF
Sol_140G0225Q0122.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Supplies Only Independent Government Estimate

Requiring Office:USGS/NWHC
Project Title:KOD fabrication
Project Manager:Curtis LaBombard
Prepared by:Curtis LaBombard
Date Prepared:Jun 11 2021
ItemQuantityUnitUnit PriceTotalRemarks/Source of Estimate/Link
Knock out drum (KOD) fabrication for NSF-ICF refridgeration system1$30,647.00Provide one universal refrigerant vessel that would be capable of replacing one of The 16" x 84" intercooler plus a
$0.0016" x 60" Knock-out vessel plus a 10 3/4" x 60" knock-out vessel. The vessel has multiple connection points and
$0.00should serve as an emergency back up should any of the three vessels fail.
$0.00The vessel manufacturer has stated that they can only honor the price for one day sue to the fluctuating price of
$0.00steel. This price is likely to change. Freight is estimated could change per carrier.
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total1$30,647.00
For Official Use Only
Source Selection Information
See FAR 3.104-4

Labor Only (fully burdened)

Independent Government Estimate
Labor Only/Fully Burdened Rates
Requiring Office:Instructions: Enter all proposed labor categories for the project and the estimate hours for each. Enter source of rate in Remarks column, with link, if available.
Project Title:
Project Manager:
Prepared by:
Date Prepared:
Base YearOption Year 1Option Year 2Option Year 3Option Year 4TotalsRemarks/Source of Estimate/Link
Labor CategoryHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursRateTotalHoursTotal
Junior Engineer53$39.00$2,067.0053$42.00$2,226.0053$43.00$2,279.0053$44.00$2,332.0053$45.00$2,385.00265$11,289.00
Senior Engineer75$55.00$4,125.0075$57.00$4,275.0075$60.00$4,500.0075$61.00$4,575.0075$964.00$72,300.00375$89,775.00
Journeyman Scientists110$40.00$4,400.00110$41.00$4,510.00110$42.00$4,620.00110$45.00$4,950.00110$48.00$5,280.00550$23,760.00
$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.000$0.00
Labor Total238$10,592.00238$11,011.00238$11,399.00238$11,857.00238$79,965.001190$124,824.00
Labor Categories. Enter all proposed labor categories for the project and the estimate hours for each related task. Loaded rates should be used whenever possible.
A loaded rate includes the percentage of overhead costs that are allocable to the contract.
For Official Use Only
Source Selection Information
See FAR 3.104-4

Pricing Schedule

BASE YEAROPTION YEAR 1OPTION YEAR 2OPTION YEAR 3OPTION YEAR 46-Month ExtensionTOTALS
DescriptionQuantityUnitUnit PriceTotalUnit PriceTotalUnit PriceTotalUnit PriceTotalUnit PriceTotalQuantityUnitUnit PriceTotal
PICK-UP, TRANSPORT, AND DISPOSAL OF GARBAGE. Service to be provided 2 times per week and includes a contractor-provided 6-yard container. Provide monthly pricing. Price shall include all associated fees.12MO6MO
PICK-UP,TRANSPORT, AND DISPOSAL OF RECYCLING MATERIAL. Service to be provided 1 time per week and includes a contractor-provided 8-yard container. Provide monthly pricing. Price shall include all associated fees.12MO6MO
GRAND TOTAL