This document contains questions and answers regarding Amendment 001 to solicitation number 140G0123Q0236 for the removal and disposal of a modular office building for the United States Geological Survey. The answers clarify that the contractor is not required to be certified to install TPO roofing systems for this demolition project. The government will disconnect and remove electrical panels and roll back wiring. Filling in the building site and leveling the ground is included in the scope of work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140G0123Q0236 Amendment 001 Questions and Answers
1. Under Section D. 1. A of the SOW, it states “A. All work under this contract must be performed by personnel who are experienced and qualified to provide professional services. Contractor will be certified to install TPO roofing systems.” Does the contractor have to be certified to install TPO roofing systems to bid on this demolition project?
a. "Contractor will be certified to install TPO roofing systems." should not have been included in the SOW for the modular removal. That is a line from the roof replacement SOW. I have removed that from the SOW.
2. Does the government plan on calling the electrical company to disconnect and remove panels and roll back wires per local regulation
a. Yes, government will have electric service disconnected and rolled back from building. I have added that to SOW.
3. Once the building is removed it was noted at the site visit that the grounds needed to be leveled, filled with dirt, and made aesthetically pleasing for site development. Since the land grading was not included in the contract we did want clarity if this should be included in the quote. (if so, we need to update the SOW with specifics).
a. Filling in the pit that the building sits in and leveling the ground should have been included as well. I have added that to the SOW.
File details come from the government source that posted it. Updated .