STATEMENT_OF_WORK_Fire_mowing_docx_blank.docx

DOCX document 18 KB Posted

Attached to
FL-ST MARKS NWR-HAZARDOUS FUELS REDUCTIO
Solicitation number
140FS324Q0151
Issued by

About this file

This document is a Statement of Work (SOW) for a Fuel Reduction (mowing) Contract at the St. Marks National Wildlife Refuge in Florida. The SOW outlines the requirements for mowing approximately 213 miles of refuge roads twice per year, for a total of 426 miles annually. The contractor will be responsible for mowing the road surfaces, including the front slope, shoulders, and driving surface, and maintaining all infrastructure along the roads. The contract has a base year from 8/9/2024 to 5/31/2025, with the potential for up to 4 additional option years. The unit cost will be renegotiated annually upon each option year extension. Bids are required to include the annual cost for the two complete mowings per year. The authorized government points of contact for this order are Barton Rye and Taija Robinson. The related federal contract opportunity is Solicitation Number 140FS324Q0151, "FL-ST MARKS NWR-HAZARDOUS FUELS REDUCTIO", issued by the Department of the Interior Fish and Wildlife Service.

View the file

Other files

File Type Posted
Attachment_-_Past_Performance_Data_Document.docx DOCX document
Sol_140FS324Q0151.pdf PDF
Wage_Determination.pdf PDF
Mowing_2024_maps.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Fuel Reduction (mowing) Contract

(NAICS)

1. General: Fuel Reduction (mowing) Contract. This is for mowing refuge roads two (2) times per year. Each mowing is 213 miles for a total of 426 miles each year. Additional 4 years may be awarded pending availability of funds.

1.1 St. Marks NWR 1255 Lighthouse Road, St. Marks, FL. 32355

What Mowing/ fire line reduction Fire Zone 4 Where Lighthouse Road, St. Marks Fl. 32344

1.2 Purpose: Mow all identified refuge road surfaces delineated on the attached maps. The road surfaces to be mowed include the front slope, road shoulders, and the driving surface. All vegetation 2" or less root collar diameter at ground level to include trees, shrubs, and grass that are in the defined mowing area will be mowed to a height of 2” to 6”. All 4" DBH trees will be mowed around and left undamaged. All signs, culverts and bridge markers will be mowed around as close as possible, within 2’ of the structure on the approach side and departure side, without damaging the structure. Contractor will replace damaged infrastructure (signs, culvert and bridge markers) at the contractor’s expense. The contractor will remove all down trees on the roadbed within the specified mowing area.

A penalty will be assessed for damage of trees along the defined roadbed. The penalty for 6 or more damaged trees within any continuous mile of defined road with a 4" DBH or greater that is within the defined mowing area will require 1 additional hour to the contract at the contractor’s expense per tree damaged over the 6-tree limit. Damaged defined as tree bark removed and the cambium layer exposed.

At the refuge’s discretion, mowing will be restricted during wet weather to prevent damage to the road surface. The contractor will be responsible for clean-up of all fuel and oil spills, keeping gates closed and damage to any privately owned vehicles or other private property while in the public access areas.

1.3 Other:. This project will have an additional 4-year option. The government may extend this project annually up to 4 additional years. Additional years’ work could occur anywhere on St. Marks Refuge. The unit cost will be renegotiated annually upon each extension.

2. Place of Performance and Period of Performance: St. Marks NWR, Lighthouse Road, St. Marks, FL. 32355

2.1 Period of Performance: Base year 8/9/2024-5/31/2025 with subsequent additional option years to be awarded pending availability of funds. Option years will run concurrently beginning on 6/1 of the next year.

2.2 Normal duty hours Monday thru Friday 8:00 a.m. - 4:30 p.m. In the event of emergencies, Contractor shall provide contact information.

2.3 Nonduty hours include weeknights, weekends, and Government holidays (New Year’s Day, Martin Luther King JR. s’s Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day).

3. Scope

3.1 Mow all identified refuge road surfaces delineated on the attached maps. The road surfaces to be mowed include the front slope, road shoulders, and the driving surface. All vegetation 2" or less root collar diameter at ground level to include trees, shrubs, and grass that are in the defined mowing area will be mowed to a height of 2” to 6”. All 4" DBH trees will be mowed around and left undamaged. All signs, culverts and bridge markers will be mowed around as close as possible, within 2’ of the structure on the approach side and departure side, without damaging the structure. Contractor will replace damaged infrastructure (signs, culvert and bridge markers) at the contractor’s expense. The contractor will remove all down trees on the roadbed within the specified mowing area.

7. Evaluation and Acceptance 7.1 Bids will need to be submitted with an annual cost to include two complete mowings per year

8. Technical Coordinator:

Authorized Government Point of Contact for this order is Barton Rye (850)251-4109 or Taija Robinson (850)251-4109. He/she/they shall not, however, have the authority to make changes to the contract/purchase order.