B08_-_LW_Statement_of_Work.pdf

PDF 56 KB Posted

Attached to
FL LAKE WOODRUFF NWR REHAB IMPOUNDMENT
Solicitation number
140FS324Q0143
Issued by

About this file

This document is a Statement of Work for the rehabilitation of a levee around Impoundment #1 at the Lake Woodruff National Wildlife Refuge in Deleon Springs, Florida. The project requires 950 tons of base rock (Limerock), 2,070 cubic yards of Clay, 621 cubic yards of clean fill dirt, and 621 cubic yards of 57 stone. The work is to be completed by refuge staff between July 6, 2024 and October 15, 2024. The Statement of Work is associated with a Federal Contract Opportunity (Solicitation Number: 140FS324Q0143) issued by the U.S. Department of the Interior Fish and Wildlife Service for the rehabilitation of the Lake Woodruff NWR impoundment.

View the file

Other files

File Type Posted
Sol_140FS324Q0143.pdf PDF
B08_-_Delivery_Location.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work/Period of Performance

Lake Woodruff NWR Earthen Material and Gravel Delivery

This statement of work is for the rehabilitation of the levee around impoundment #1 at Lake Woodruff National Wildlife Refuge in Deleon Springs Florida. The Deferred Maintenance project will be completed by refuge staff. The project is for approximately 1,000 LNF of levee that has settled and too low. For the impoundment to operate properly these areas need to be brought up with an additional 4 feet of material. Then capped, dressed, and armored. The levee system has suffered erosion and requires repairs as identified during a recent inspection.

Rehabilitation of the levee will require 950 tons of base rock (Limerock), 2,070 cubic yards of Clay, 621 cubic yards clean fill dirt, and 621 cubic yards of 57 stone.

Site may close due to weather related events.

Point of Contacts:

Tom Penn, 321-301-0614, Wes Allie (on site contact) 386-414-4943

Delivery Location:

2045 Mud Lake Rd, De Leon Springs, FL 32130, + 1.3 miles from office. See attached map for location.

Period of Performance:

July 6, 2024 – October 15, 2024