Attachment_1-_Statement_of_Work-rev1_0003.pdf
PDF 3 MB Posted
- Solicitation number
- 140FS324Q0117
About this file
This document is a Statement of Work (SOW) for an aerial herbicide control project at the Bayou Sauvage Urban National Wildlife Refuge in Louisiana.
The SOW requires a contractor to apply herbicide and adjuvant to approximately 1,117 acres on the Little Pine Island tract to control Chinese tallow trees and Chinaberry trees. The contractor must supply all materials, equipment, and labor to perform the herbicide treatments. The application must be completed by October 31, 2024, and the government will inspect the application by November 30, 2024. The contractor will be required to provide GPS files, shapefiles, and other documentation to the government for inspection and acceptance. The relevant federal contract opportunity, Solicitation Number 140FS324Q0117, is a small business set-aside for the aerial herbicide treatment project with a period of performance from August 1, 2024 to November 31, 2024. Quotes are due by June 13, 2024 and the award will be made on a best value basis considering technical factors, past experience, and price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FS324Q0117_Amd_0003.pdf | ||
| Sol_140FS324Q0117_Amd_0002.pdf | ||
| Attachment_2-_Quote_schedule_corrected_0002.docx | DOCX document | |
| Sol_140FS324Q0117_Amd_0001.pdf | ||
| Attachment_1-_Statement_of_Work.pdf | ||
| Attachment_2-_Quote_schedule.docx | DOCX document | |
| Sol_140FS324Q0117.pdf | ||
| Attachment_3-_SCA_Wage_Determination.pdf | ||
| Attachment_4-_Past_Performance_Data_Document.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BAYOU SAUVAGE URBAN NWR AERIAL HERBICIDE CONTROL OF CHINESE TALLOW
Scope of Work for Aerial Herbicide Control of Chinese Tallow Trees
QUOTE INSTRUCTIONS: Detailed quotes must be submitted for the area shown on the attached map with the price shown as a separate line item. The US Fish and Wildlife Service reserves the right to remove acres from the bid package due to insufficient funding and may select any or all of the acres to be treated under contract with the vendor.
3. SCOPE:
3.1 The contractor will apply herbicide and appropriate adjuvant to approximately 1,117 acres on the Little Pine Island tract on Bayou Sauvage Urban National Wildlife Refuge (BSUNWR). Application can be applied either by helicopter or fixed wing aircraft and the equipment choice will be left up to the contractor to maximize effectiveness of the treatment. Herbicide will be applied to areas that have been pre-defined and mapped within the US Fish and Wildlife Service (USFWS) geographic information system (GIS) database. The contractor will apply enough herbicide to control 95% of Chinese tallow tree (Triadica serbifera) aa well as Chinaberry tree (Melia azedarach).
3.2 The contractor shall supply all material, equipment, and labor to perform the herbicide treatments.
The contractor shall purchase and supply all chemicals, including herbicide and adjuvant. All herbicides must be submitted and pre-approved by USFWS 30 days prior to application. The contractor will also supply equipment to meter chemicals and water mixtures and will provide mixing and loading equipment and water. Water hauling services may be required depending upon airport arrangements secured by contractor (see Clauses 3.5 and 7.1 below). Equipment and personnel must be able to work at a semi-remote and semi-primitive site (i.e., no electrical or water hookups, no hanger or aircraft tie-down facilities, nearest services are 6.5 miles away, etc.).
3.3 The contractor must be capable of calibrating equipment to the final application rate specifications. All spraying equipment and/or aircraft must be equipped with global positioning system (GPS) tracking equipment that can map application areas and flight paths that will be provided to
USFWS.
3.4 The Wildlife Biologist or Refuge Manager must be notified at least 48 hours prior to any application. The contractor shall provide adequate personnel for the purpose of loading and dispersing of the chemicals. All personnel and equipment to be used shall be appropriately licensed and certificated as appropriate for the work to be done. The contractor shall be responsible for providing sufficient equipment, equipment fuel, safety items, spill response kit, personnel and their subsistence needs during the project period, as well as checking all work sites for hazards of any type which could impact their ability to accomplish the spraying project.
3.5 The contractor will be required to make all necessary arrangements for use of airport runways, loading zones, and equipment and fuel storage areas. The contractor will be responsible for all loading operations. Movement of chemicals, water, and equipment in and around an operation location will be the sole responsibility of the applicators. This may require special handling equipment including, but not limited to, a forklift, water truck, or pallet jack.
3.6 The contractor must be licensed and bonded. Proof of bonding will be required upon notification of Contract award. The contractor is required to obtain a performance bond of 25% of the total bid price and a payment bond of 20% of the total bid price. Submission of bonding will be required prior to any work commencing.
3.8 The contractor shall be responsible for conducting all flight-following of aerial applications.
Communications must be maintained between ground personnel and the aircraft at all times.
Additionally, aircraft and ground personnel must have appropriate communication capability to communicate with Hanford dispatch and/or USFWS personnel.
3.9 The contractor shall provide USFWS with contact information for all ground personnel, and vehicle and equipment identification information (including make, model, and license and/or identification numbers) at least 48 hours before implementation of the project.
3.10 No chemical applications may be made during inversions, when winds exceed 8 mph sustained, when temperatures exceed 95 F, or when precipitation is forecast within 6 hours. Minimum buffers must be maintained to prevent spray drift onto undesired areas.
4. PLACE/DELIVERY AND PERIOD OF PERFORMANCE:
4.1 GIS-designated areas on BSUNWR, located in Orleans Parish, LA. (see attached map).
4.2 The project shall be conducted during the months of August, September, or October to ensure optimal effectiveness of the herbicide and to provide sufficient time for government representatives to inspect the application prior to the dormant season. Aerial application must be completed by October 31, 2024, and final inspection by a government representative will occur no later than November 30, 2024.
5. INSPECTION AND ACCEPTANCE:
5.1 The contractor will supply GPS files of all application paths and of all application locations. The contractor will also supply shapefiles in Environmental Systems Research Institute (ESRI) format of all application paths and of all application locations at the conclusion of the application.
5.2 Evaluation and acceptance will be determined by the Technical Coordinator(s) and/or Refuge Manager(s). Chemical applications will be evaluated for thoroughness and evenness of application using GPS files and shapefiles provided by the contractor, and by field-checking application areas for chemical effects (e.g., looking for skips or overlaps within the treatment areas).
6. GOVERNMENT FURNISHED EQUIPMENT OR MATERIALS/INFORMATION:
6.1 Maps are included and GIS shapefiles of the treatment areas will be provided upon request.
6.2 Verification of spray application by spot check and review of equipment will be done by USFWS.
GPS mapping of chemical application areas may also be done by USFWS personnel following treatments.
7. AVAILABILITY:
7.1 Application area located on BSUNWR in Orleans Parish LA approximately 10 miles southwest of Slidell LA and is approximately 1,117 acres. Approximate center of application area is located at
30.0603808 N, -89.909559 W. Elevation within the treatment areas range between 1-5 feet above Mean Sea Level (MSL).
8. TECHNICAL COORDINATORS:
Matthew Sieja (Administrative Forester) US Fish and Wildlife Service, Southeast Louisiana Refuge Complex 61389 Hwy 434 Lacombe LA, 70445.
Phone: (985) 517-9333 Email: matthew_sieja@fws.gov
Neil Lalonde (Project Leader, SELA) US Fish and Wildlife Service, Southeast Louisiana Refuge Complex 61389 Hwy 434 Lacombe LA, 70445.
Phone: (985) 882-2003 Email: neil_lalonde@fws.gov
Pon Dixson (Project Leader, BSUNWR) US Fish and Wildlife Service, Southeast Louisiana Refuge Complex 61389 Hwy 434 Lacombe LA, 70445.
Phone: (985) 285-3613 Email: pon_dixson@fws.gov mailto:matthew_sieja@fws.gov mailto:neil_lalonde@fws.gov mailto:pon_dixson@fws.gov
2 0 2 4
Figure 1: Scope Map.
uge
Bayou Sauvage Urban
NWR
Little Pine Island Aerial Treatment Unit
Road
BSUNWR little Pine Island Aerial Spray Treatment Area
Scope Map
ONANP, Esri, TcrnTom, Garmin, AO, NOAA, USGS, EPA, NPS, SfttJJS, Earthst:a:r Geographies oordmate System: GCS WGS 1984
0111111.1. ==::::2.1115-C::::::::JSMi
-O ---===;:4.!75!!1--===9.5Km
Figure 2: Treatment Area.
tairie
BUar Wil "'
Bayou Sauvage Urban
NWR
ff"'!!""I Little Pine Island Aerial Treatment Unit
BSUNWR little Pine Island Aerial Spray Treatment Area
1,117 acres
ONANP, Esri, TomTom, Gamiin, :.tfeGrnph, FAO, :METI/NASA, New Orleans 0 - Road
--- Rail Road
SGS, EPA, NPS, USfiWS, Mexar oordinate System: GCS WGS 1984
11□•c:::::::Oj.2ii5•c::::::::::i0.}Aj
--C::::::::::]!111111-C::====!Km O 0.5 1
| BAYOU SAUVAGE URBAN NWR AERIAL HERBICIDE CONTROL OF CHINESE TALLOW |
| 3. SCOPE: |
| 4. PLACE/DELIVERY AND PERIOD OF PERFORMANCE: |
| 5. INSPECTION AND ACCEPTANCE: |
| 6. GOVERNMENT FURNISHED EQUIPMENT OR MATERIALS/INFORMATION: |
| 7. AVAILABILITY: |
| 8. TECHNICAL COORDINATORS: |
File details come from the government source that posted it. Updated .