Herbicide_Scope_of_Work___Map_2024.doc
DOC document 352 KB Posted
- Attached to
- HERBICIDE SPRAYING 2024-Pieddmont NWR, GA
- Solicitation number
- 140FS324Q0059
About this file
This document outlines a scope of work for a proposed herbicide spraying contract at Piedmont National Wildlife Refuge in 2024. The contractor will apply Arsenal AC herbicide at 16 ounces per acre and Escort XP at 1 ounce per acre to 259 acres between June 1st and September 15th to control hardwood growth and enhance foraging habitat for the endangered red-cockaded woodpecker. The application must be performed by hand crews with backpack sprayers and coordinated with the refuge manager. The selected contractor will be required to obtain a special use permit from the U.S. Fish and Wildlife Service that stipulates adherence to refuge rules and restrictions including vehicle access limitations and cleanup requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FS324Q0059.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Proposed Spray Contract 2024 Piedmont NWR – Hardwood Plant Control in RCW Habitat Management This project will benefit habitat for the endangered red-cockaded woodpecker (RCW). The project area is the pine component of a timber sale that was harvested in 2023. Hardwoods, particularly sweetgum, are significant impediments to red-cockaded woodpecker foraging habitat management. The purpose of the project is to enhance current RCW habitat by reducing understory hardwoods.
The area to treat is 259 acres in compartment 2 – see figure 1. The herbicides to use are isopropylamine salt of imazapyr: (2-[4,5-dihydro-4-methyl-4-(1-methylethyl)-5-oxo-1H-imidazol-2-yl]-3-pyridinecarboxylic acid), and metsulfuron-methyl: (methyl 2-[(4-methoxy-6-methyl-1,3,5-triazin-2-yl) carbamoylsulfamoyl] benzoate). The trade names are Arsenal Applicators Concentrate and Escort XP, respectively. The refuge will supply the herbicide.
Project Specifications
1. Applied by hand crews with backpack sprayer.
2. Apply Arsenal AC at 16 ounces per acre and Escort XP at 1 ounce per acre, with appropriate non-ionic surfactant.
3. The period of performance is from the date the contract is awarded through the application time. This allows the contractor time to plan their schedule, hire workers, purchase materials, etc. Application time is June 1st through September 15th.
Refuge Special Use Conditions will include at least the following:
A refuge special use permit is required for access into the refuge after the contract is awarded. Conditions of the permit will include the following:
· All work must be coordinated with the refuge manager or designee.
· Work can only be conducted Monday through Friday, during business hours, except Federal Holidays.
· Contractor is responsible for submitting and maintaining a written work schedule.
· All refuge regulations are in effect unless otherwise designated in writing.
· No collection of plants, animals, rocks, or artifacts allowed.
· No alcohol is permitted on the refuge.
· Persons possessing, transporting, or carrying firearms on National Wildlife Refuges must comply with all provisions of state and local law. Persons may only use (discharge) firearms in accordance with refuge regulations (50 CFR 27.42 and specific refuge regulations in 50 CFR Part 32).
· Vehicle traffic is restricted to gravel roads designated as open except as marked on attached map of the project work area.
· Contractor is responsible for daily clean-up of work area.