Sol_140FS323Q0079_Amd_0002.pdf
PDF 125 KB Posted
- Attached to
- Fuel Reduction Treatment, Ninigret NWR, RI
- Solicitation number
- 140FS323Q0079
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FS323Q0079_Amd_0003.pdf | ||
| Sol_140FS323Q0079_Amd_0001.pdf | ||
| Sol_140FS323Q0079.pdf | ||
| Attachment_2-_Past_Performance_Data.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140FS323Q0079
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
FS3
Falls Church VA 22041 5275 Leesburg Pike FWS SAT Team 3 FWS SAT Team 3
04/24/20230002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/24/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 0002 is hereby issued to address concerns posed from industry. Closing remains
May 10, 2023 at 2:00pm.
All other terms and conditions remain unchanged.
RI-FWS NINIGRET NWR- Fuel Reduction Treatment
Tech POC: Nick Ernst (401) 213-4406
Alt POC: Nick Ernst (401) 213-4406
Contract POC: Fred Riley, Fred_Riley@fws.gov
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Fred Riley
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Questions and Answers:
Question 1: How do you want to treat white pine throughout the project area?
Answer 1: All white pine of any size should be removed.
Question 2: How should the fire breaks be cleared?
Answer 2: Fire breaks should be mowed approximately 10-15 feet wide to allow a 10-foot wide truck to navigate the area. All shrubs should be mowed to the ground. Trees should be mulched down to no less than 2 inches from the ground so vehicles can safely drive over them. Fire breaks should be installed on the outside edge of the shaded fuel break and meander somewhat to not create a straight visual corridor.
Question 3: How should we handle snags?
Answer 3: In general, try to leave approximately 3 snags per acre, for example- 1 exceeding 18 inches DBH, and two exceeding 12 inches DBH. Remove all snags within 100 feet of a firebreak
Question 4: Are there any sensitive areas for cultural resources?
Answer 4: We are in the process of consulting with SHPO and USFWS cultural resources. There might be sensitive areas we need to avoid for the project depending on the outcome of the consultation. We will update the project map prior to the start of the project. We need to avoid disturbing stone walls and areas that have stacked stones which could be historically significant.
Question 5: Which trees should we target for removing bigger ones verses smaller ones?
Answer 5: Any hardwood or pitch pine that are unhealthy, suppressed, weak, or show signs of insect infestation should be targeted for removal. Contractor can make judgment call based on professional opinion on which trees to remove, as long as the overall tree spacing and basal area listed in the scope of work is adhered to for the shaded fuel break and savannah area.
Question 6: How many trees should we remove from the savannah treatment area?
Answer 6: Not looking for a clear cut. Want variable spacing so ok to leave clumps of trees in certain areas-probably where rocks are. Overall looking for 20-75 trees per acre, and a residual basal area about 30 sq feet per acre (approximately 20-60% canopy cover).
Question 7: Would this steep slope be included in the treatment?
Answer 7: Very steep slopes could lead to soil disturbance, thinning along the ridge could be tough. For hillside areas, you can reach as far as you can with equipment from the bottom and top of hill to avoid driving on the slope. Prior to the start of the project, we will adjust the project boundaries as necessary to take into account topography, and we will flag the areas and provide a final map with adjustments.
Question 8: Do you want to scarify and areas for pitch pine regeneration?
Answer 8: Some light scarification could be beneficial as is it does promote pitch pine regeneration. However, we need to consult with cultural resources first to ensure we don’t impact any sensitive archeological sites. If they approve, we wouldn’t want the entire area to be scarified. Patches here and there could be ok- pending approval from cultural resources.
Question 9: Should we break up mountain laural understory?
Answer 9: Yes, we will want to break up the mountain laurel understory. Don’t need to mow 100 percent, want to reduce the continuity of surface fuels to 25-50% random coverage, so that we can safely burn the area in the future.