UT JONES HOLE NFH PIPING MATERIALS Federal contract opportunity
Solicitation number
140FS226Q0090
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This is a Statement of Work (SOW) for the procurement of piping materials for the Rehabilitate East Spring project at Jones Hole National Fish Hatchery in Vernal, Utah (Contract Number 140FS226Q0090).

The contractor must procure and deliver specified piping materials to protect an open spring from Aquatic Invasive Species infiltration by installing enclosed perforated pipes. Materials required include 4,300 linear feet of 6-inch SDR35 perforated pipe, 120 linear feet of 6-inch DWV pipe, various PVC DWV fittings and components (tees, elbows, adaptors, and plugs), 1,000 square yards of blue geotextile fabric, and 20 linear feet of galvanized flanged nestable corrugated steel pipe with associated hardware. The SOW provides two options for the corrugated steel pipe specifications—Option 1 specifies 24-inch diameter sections with specific hardware quantities, while Option 2 specifies 600mm diameter metric sections with significantly higher hardware quantities (400 bolts, nuts, and 800 washers). All materials must be delivered to Jones Hole National Fish Hatchery by May 29, 2026. The contractor is responsible for loading and offloading materials and must pre-coordinate delivery location with the authorized U.S. Fish and Wildlife Service representative. Contractor must be appropriately licensed and certified within Utah and must follow all Federal, State, and County regulations. Normal duty hours are Monday through Friday, 7:30 a.m. to 4:00 p.m. Technical coordination will be provided by Sean Henderson (Supervisory Fish Biologist) as primary contact and Kristopher Johnson (Facility Management Coordinator) as secondary contact. Government will provide restrooms, electricity, and water. Quality control shall be maintained according to industry standards for commercial supplies.

View the file

Other files for this federal contract opportunity

Other files attached to UT JONES HOLE NFH PIPING MATERIALS, newest first.
File Type Posted
Sol_140FS226Q0090_Amd_0001.pdf PDF
Sol_140FS226Q0090.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140FS226Q0090 Pipe Materials Page 1 of 3

Jones Hole National Fish Hatchery

Rehabilitate East Spring (enclosed drainpipes) at Jones Hole NFH

1. General:

1.1 Jones Hole National Fish Hatchery (NFH), 24495 East Jones Hole Hatchery Road, Vernal, UT

84078-2042. Materials for Rehabilitate East Spring (Enclosed Drain Pipes).

1.2 Purpose/End Application: This project is for the purchase and delivery of piping materials to protect the open spring from Aquatic Invasive Species (AIS) infiltration by installing enclosed perforated pipes.

1.3 Contractor Qualifications: The contractor must be appropriately licensed and certified within the state of Utah the specified services.

1.4 Other: The contractor must follow all associated regulations and laws including: Federal, State, and County.

2. Place of Performance and Period of Performance

2.1 Work is to be performed at Jones Hole National Fish Hatchery, 24495 East Jones Hole

Hatchery Road, Vernal, UT 84078-2042.

2.2 The materials need to be delivered by May 29,2026.

2.3 Normal duty hours Monday thru Friday 7:30 a.m. - 4:00 p.m. In the event of emergencies, Contractor shall provide contact information.

2.4 Non-duty hours include weeknights, weekends, and Government holidays (New Year’s Day, Martin Luther King JR’s Birthday, Memorial Day, Juneteenth Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day).

3. Scope

3.1 The contractor shall provide and deliver new materials specified in section 4, to include:

piping and related components, flanged corrugated pipe and associated hardware, and geotextile fabric.

3.1.1 The contractor shall deliver to the location designated by the authorized U.S. Fish and

Wildlife Service (FWS) representative(s). This location shall be pre-coordinated with said representative prior to delivery.

3.1.2 The contractor shall be responsible for loading and offloading materials. Assistance from

FWS personnel can be requested but must be coordinated at least 5 working days prior to delivery.

Coordination will be made with the authorized FWS representative(s).

140FS226Q0090 Pipe Materials Page 2 of 3

4. Deliverables and/or Delivery Schedule: (for extended list a bid schedule and/or use of line item detail on the PR is recommended)

4.1 The contractor shall provide new materials necessary for the spring enclosure project.

A. 6-inch x 10 feet SDR35 Perforated Pipe, 4300 linear feet.

B. 6-inch x 20 feet DWV pipe, 120 linear feet.

C. 3791-060 6-inch Double Sanitation Tee (cleanout), 30 each.

D. P321-060 6-inch PVC DWV 45-degree Elbow 1/8 Bend, 12 each.

E. P101-060 6-inch PVC DWV Female Adaptor, 30 each.

F. P106-060 6-inch PVC DWV Cleanout Plug, 30 each.

G. 0801TG 12.5X360 NON WVN Geotextile LM800 12.5feet x 360 feet 500 square yards

*BLUE*, 2 each.

H. Galvanized Flanged, Nestable Corrugated Steel Pipe, 20 linear feet

1) Option 1:

a. 24” Galvanized Nestable Corrugated Steel Pipex 20 LNFT (4 x 10-foot

Sections) Flanged

b. CSP HARDWARE -3/8inch x 1 inch Hex Bolt, Galvanized, 20 each.

c. CSP HARDWARE 3/8-inch NUT, Galvanized, 20 each.

d. CSP HARDWARE 3/8-inch WASHER, Galvanized, 40 each.

2) Option 2:

a. CRF2060 GALV NESTABLE CSP 600MM DIA X 1.6 MM X 610MM, 36 each

b. CRF2060 GALV NESTABLE CSP 600MM DIA X 1.6 MM X 305MM, 8 each

c. CSP HARDWARE -3/8inch x 1 inch Hex Bolt, Galvanized, 400 each.

d. CSP HARDWARE 3/8-inch NUT, Galvanized, 400 each.

e. CSP HARDWARE 3/8-inch WASHER, Galvanized, 800 each.

5. Data Management Plan (DMP) N/A

6. Government-Furnished Equipment (GFE) / Government-Furnished Information

(GFI)

6.1 Jones Hole NFH will provide restrooms, electricity, and water for the contractor to using while the contracted work is being completed.

6.2 Identify any limitations. N/A

7. Evaluation and Acceptance

140FS226Q0090 Pipe Materials Page 3 of 3

7.1 The contractor will be evaluated as detailed herein. Government acceptance is contingent upon: designated U.S. Fish and Wildlife Service representative(s) determining the work to be acceptable and in good working order.

8. Quality Control/Quality Assurance:

8.1 For commercial supplies reference clauses for inspection and acceptance. Where appropriate, QC will be maintained according to industry standards and made available to the agency with the contractor’s proposal.

8.2 Identify and detail measures for assessing quality control and acceptance; each requirement is unique and a table format is visually friendly and may be desirable.

9. Technical Coordinator:

9.1 Primary individual responsible for the final product or service.

Sean Henderson

Supervisory Fish Biologist

24495 East Jones Hole Hatchery Road

Vernal, UT 84078-2042

Office: 435-789-4481 x12

Work Cell Phone: 307-368-0411 sean_henderson@fws.gov

9.2 Secondary individual responsible for the final product or service.

Kristopher “Kris” Johnson

Facility Management Coordinator (FMC)

Asset Management Coordinator (AMC)

U.S. Fish and Wildlife Service

Fish and Aquatic Conservation (FAC)

1380 South 2350 West

Vernal, UT 84078

Cell: 435-299-5150

Office: 435-789-0351 ext. 16 kristopher_b_johnson@fws.gov mailto:sean_henderson@fws.gov mailto:kristopher_b_johnson@fws.gov