A04_-_SOW_-_Vehicle_Shuttle_BPA.pdf
PDF 932 KB Posted
- Solicitation number
- 140FS224Q0226
About this file
This document is a Statement of Work (SOW) for a 5-year Blanket Purchase Agreement (BPA) to provide vehicle shuttle services for the United States Fish and Wildlife Service, Green River Basin FWCO Program in Dinosaur National Monument and the Green River Basin area of Colorado and Utah.
The SOW describes the requirements for the contractor to provide all personnel, transportation, tools, labor, supplies, materials, supervision, and services necessary to operate a vehicle shuttle service on an on-call basis. The shuttle services are required for government-owned vehicles and GSA vehicles between designated boat launch locations along the White River and Green River. The contractor must provide certified, inspected, and well-maintained shuttle vehicles and licensed, trained, and courteous drivers. The contractor must also meet all applicable federal, state, and local laws and regulations. The anticipated period of performance is from 01/01/2025 to 12/31/2029.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
UT - RIV FSHRY PROJ-VERNAL
BPA Vehicle Shuttle
Project Description
For the purchase of services to provide all personnel, transportation, tools, labor, supplies, materials, supervision, and services necessary to operate a vehicle shuttle service for the United States Fish and Wildlife Service, Green River Basin FWCO Program in Dinosaur National Monument between Gates of Ladore, Deerlodge Park, and Rainbow Park River put-ins and the Split Mountain river take-out on an on call basis. Contractor owned vehicles will be used to access the government shuttle point/locations listed under Specifications/locations. Government owned vehicles and GSA vehicles will be shuttled.
The contractor will furnish services called for by this agreement if and when requested by the Contracting Officer or his/her authorized representative during a five (5) year period of performance.
The anticipated period of performance is from 01/01/2025- 12/31/2029 or as stated upon BPA award.
Project Location
This project is located in Rio Blanco County, Colorado and Uintah County, Utah for White River vehicle shuttles. These shuttles will be run from the BLM-Big Trujillo Wash boat launch to the Bonanza bridge boat launch (Map 1), from the BLM-Big Trujillo Wash boat launch to the Enron boat launch (Map 2), and from the Enron boat launch to the Ouray boat launch (Map 3).
This project is also located within Dinosaur National Monument in Moffat County, Colorado and Uintah County, Utah for Vampa, and Green River vehicle shuttles. Dinosaur National Monument vehicle shuttles will be run from the Gates of Lodore boat launch to the Split Mountain boat launch (Map 4), from the Deerlodge Park boat launch to the Echo Park boat launch (Map 5), and from the Echo Park boat launch to the Split Mountain boat launch (Map 6).
In addition, this project is also located in Uintah, Duchesne, Carbon, Emery, and Grand Counties, Utah for Green River in Desolation and Gray Canyons shuttles. These shuttles will be run from the Ouray boat launch to the Swasey's boat launch (map 7).
Shuttle Drivers
Shuttle drivers are to carry a current valid state issued Driver's License. Drivers are to have received adequate training in the operation of the passenger vehicles, trucks and towing of trailers. Operators shall be courteous and abide by all laws while conducting vehicle shuttles. Drivers shall present a neat appearance and be easily recognized as an employee of the contractor. At the beginning of the season, the contractor shall submit to the River Office a list of drivers and copies of their driver's license.
The government is authorized to restrict access to any employee who is identified as a potential threat to the health, security, or general well-being of the Green River Basin FWCO.
Vehicle parking
The contractor will park shuttle vehicles in approved boater parking areas at the Bonanza bridge, Enron launch, Ouray launch, Echo Park, Split Mountain, and Swasey's launch.
Statement of Work
UT - RIV FSHRY PROJ-VERNAL
BPA Vehicle Shuttle
Certification, Inspections and Training
Contractor will provide certification that all company owned shuttle vehicles shall be in good mechanical order and comply with licensing and safety with the state registered. They shall be in compliance with Federal Motor Carrier Safety Regulations and meet OSHA and DOT standards for passenger safety.
Compliance and Regulations
All contractor employees and representatives engaged in activities under this contract shall comply and be subject to all Federal, National Park Service, Bureau of Land Management, United States Fish and Wildlife Service and State laws and regulations applicable within the boundaries of the project. They shall, at all times, while on duty, conduct themselves in a manner that will not reflect adversely on Green River Basin FWCO and the U.S. Fish and Wildlife Service.
Insurance
All United States Fish and Wildlife Service contractors/vendors must carry appropriate insurance and meet minimum coverage requirements. At minimum, commercial general liability, insurance is required for commercial operators for $100,000 per occurrence.
F.O.B. POINT
The F.O.B. Point for this BPA is "Destination".
3125/202\
Google Maps
J, Big Trujilo 'Nash, COOrado to UT--45, Jenson. UT 64035 - Goog!o Maps
Big Trujillo Wash, Colorado to UT-45, Jensen, UT 84035
Go-,gle
Drive 34.5 miles, 43 min
Mapdalat:12021 2ml.._ ___ __, Map 1. Big Trujillo Wash launch to Bonanza bridge launch vehicle shuttle route.
3125/2021
GMgleMaps
I
Big Trujillo Wash Colorado 816•8
Big Truj�lo Wash, ColOQdo lo Uinta County School Dis!rict#1, Utah· Google Maps
Big Trujillo Wash, Colorado to Uinta County School District #1, Utah r
Go gle
Drive 49.7 miles, 1 hr 20 min
MapdaIa Cl202l 2 rm.______,.
Map 2. Big Trujillo Wash launch to Enron launch vehicle shuttle route.
3/2512021
Go gle Maps
Uinta County Sd1ool District #1, Utah to Uinta County School District #1, Utah· Googlo Maps
Uinta County School District #1, Utah to Uinta County School District #1, Utah
Drive 19.5 miles, 31 min l��
L- 0
--"-��J
I
Go gle
Mapda1ac2021 2m1-----
Map 3. Enron launch to Ouray launch vehicle shuttle route.
Go gle Maps q
Gates of Ladore, Dinosaur, CO to Split Mountain Drive 136 miles, 2 hr 28 min Landing, Jensen, UT
Go gle
Map data 02021 Google 5 mi.__ _ __.
Map 4. Gates of Lodore launch to Split Mountain launch vehicle shuttle route.
s
3/2512021
Oco,lodgo Pa,k Campground, Maybol, CO to Echo Park, Colorado. Googlo Maps
Deerlodge Park Campground, Maybell, CO to Echo Park, Colorado
Drive 88.0 miles, 2 hr 26 min
...,.::•--1--.../
Go gle
Mapd,uaC2021 2mi '----1
Map 5. Deerlodge Park launch to Echo Park launch vehicle shuttle route.
3/25/2021
Goigle Maps
Echo Park, Colorado to Split t.1ountoin Landing, Jens cm, UT - Googfe Maps
Echo Park, Colorado to Split Mountain Landing, Jensen, UT
Go gle
Drive 70.0 miles, 2 hr 1 0 min
Map dala C2021 2 ml '-----I
Map 6. Echo Park launch to Split Mountain launch vehicle shuttle route.
3/25/2021 Uint.l County School District#1, Utah to Swaseys Beach, Groen Rivor, UT. Googlo Maps
Uinta County School District #1, Utah to Swaseys Beach, Green River, UT r -
U-·-
Go gle
Drive 190 miles, 3 hr 23 min
MopdalaC2021 Google 1Dml---
Map 7. Ouray launch to Swasey's Beach launch vehicle shuttle route.
The Green River Fish and Wildlife Conservation Office will schedule vehicles shuttles at the time river trips are scheduled. The number of shuttles needed is unknown until trips are scheduled.
| A04 - SOW - Vehicle Shuttle BPA |
| GRB FWCO-FF06F28000 Specifications for 5 year BPA River Runners Transport, Inc. 7-11-24 |
File details come from the government source that posted it. Updated .