This document is a Statement of Work (SOW) for a federal contract opportunity to provide bat removal, prevention, and cleanup services at the Creston National Fish Hatchery in Kalispell, Montana.
The key details are:
- The purpose is to provide a safe and healthy workspace and visitor experience by removing bats, cleaning up bat waste, sanitizing the hatchery building, and sealing building openings to prevent bat infiltration.
- The contractor must be licensed, accredited, and certified in Montana for humane bat removal and remediation, and must follow all applicable federal, state, and local regulations.
- The work must be completed by July 30, 2024 prior to the bats' migration back to the building.
- The contractor will provide all necessary equipment and supplies for the bat remediation. The government will provide access to restrooms, electricity, and water.
- Government acceptance is contingent upon the U.S. Fish and Wildlife Service representative determining the work to be acceptable.
The related federal contract opportunity is Solicitation Number 140FS224Q0115 for "MT Creston NFH Hatchery Building Bat Removal, Prevention, and Cleanup" issued by the Department of the Interior Fish and Wildlife Service.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140FS224Q0115 Bat Removal, Prevention, and Cleanup Page 1 of 2 Creston National Fish Hatchery
1. General:
1.1 Creston National Fish Hatchery (NFH), 780 Creston Hatchery Road, Kalispell, MT 59901-
8239. Service, Rehabilitate Hatchery Building, Bat Remediation.
1.2 Purpose/End Application: This project is to provide a safe and healthy workspace and visitor experience within the Hatchery Building. Bats have been roosting within the hatchery building, leaving guano and urine. The bats need to be removed, the guano and urine needs to be cleaned, the building needs to be sanitized, and the openings into the building need to be sealed from bat infiltration.
1.3 Contractor Qualifications: The contractor must be appropriately licensed, accredited, and certified within the state of Montana for the humane removal of bats and bat remediation.
1.4 Other: The contractor must follow all associated regulations and laws including:Federal, State, and County.
2. Place of Performance and Period of Performance
2.1 Work is to be performed at Creston National Fish Hatchery (NFH), 780 Creston Hatchery
Road, Kalispell, MT 59901-8239.
2.2 This project needs to be completed prior to July 30, 2024 due to the potential of bats migrating back into the building.
2.3 Normal duty hours Monday thru Friday 8:00 a.m. - 4:30 p.m. In the event of emergencies, Contractor shall provide contact information.
2.4 Non-duty hours include week nights, weekends, and Government holidays (New Year’s Day, Martin Luther King JR.s’s Birthday, Memorial Day, Independence Day, Labor Day, Columbus
Day, Veteran’s Day, Thanksgiving Day, Christmas Day).
3. Scope
3.1 The contractor shall legally and humanely remove all bats roosting within the Hatchery
Building, remove all bat waste (guano and urine), sanitize building from waste products, and seal all openings which the bats could enter into the building.
4. Deliverables and/or Delivery Schedule: (for extended list a bid schedule and/or use of line item detail on the PR is recommended)
4.1 The contractor shall provide all necessary equipment and supplies required for the bat remediation
140FS224Q0115 Bat Removal, Prevention, and Cleanup Page 2 of 2 Creston National Fish Hatchery
5. Data Management Plan (DMP) N/A
6. Government-Furnished Equipment (GFE) / Government-Furnished Information
(GFI)
6.1 Creston NFH will provide restrooms, electricity, and water for the contractor to using while the contracted work is being completed.
6.2 Identify any limitations. N/A
7. Evaluation and Acceptance
7.1 The contractor will be evaluated as detailed herein. Government acceptance is contingent upon: designated U.S. Fish and Wildlife Service representative(s) determining the work to be acceptable and in good working order.
8. Quality Control/Quality Assurance:
8.1 For commercial supplies reference clauses for inspection and acceptance. Where appropriate, QC will be maintained according to industry standards and made available to the agency with the contractor’s proposal.
8.2 Identify and detail measures for assessing quality control and acceptance; each requirement is unique and a table format is visually friendly and may be desirable.
File details come from the government source that posted it. Updated .