A04_SOW_1_19_24.pdf
PDF 108 KB Posted
- Attached to
- TX-AR/MATAGORDA ISLD NWR-BARGE DRY DOCK REPAIRS
- Solicitation number
- 140FS224Q0059
About this file
This statement of work outlines maintenance and repair requirements for a 100-foot barge owned by the U.S. Fish and Wildlife Service. The vessel, named Miss Matagorda, requires quadrennial maintenance to keep it operational for open water projects on the Texas Gulf Coast. Services include hauling the barge out of the water and placing it on blocks in a commercial dry dock for cleaning, painting, and welding repairs from February 22nd to April 19th, 2024. The contractor will sandblast and apply primer, haze grey paint, and antifouling paint to the barge. Approximately 20 zinc anodes will be replaced or installed. Engine hatches, running gear, and other components will be inspected and repaired as needed. The refurbished vessel must be returned by the delivery deadline so that it can be used for upcoming field work, allowing for weather-dependent scheduling. Acceptance will be determined by the refuge manager upon completion according to specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FS224Q0059.pdf | ||
| B12_Tabulation_Pricing.xlsx | XLSX spreadsheet | |
| B03_Wage_Determination_Refugio_County__Austwell_TX_2015-5305_1_19_24.pdf | ||
| B12_Photos_of_Barge.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Miss Matagorda Dry Dock Maintenance and Repairs
1. General:
Location of Service:
Aransas/Matagorda Island NWR Complex 1 Wildlife Circle Austwell, TX 77950-0100
Type of Service:
Required maintenance and renovations (see 3. Scope)
Purpose:
The Miss Matagorda Barge (100’ x 30’) requires quadrennial maintenance and repairs, in addition to updates to keep the vessel up to date with project needs. These updates and maintenance are required as this vessel is the sole vessel serving the open waters of the Texas Gulf Coast for U.S. Fish and Wildlife Service.
2. Place of Performance and Period of Performance:
Start Date – 02/22/2024 End Date – 04/19/2024
3. Scope:
The maintenance and projected renovations include but are not limited to the following:
Vessel Handling:
Set blocks and haul out barge to commercial dry dock location to sand blast entire barge.
Painting & Anode:
Sandblast and apply.
a. Prime entire barge with 235 PA buff
b. Paint from water line about with 400 haze grey
c. Paint from water line below 2 coats of 214 antifouling black paint
d. Welder to remove install app 20 ea. #24 zincs.
e. Replace/rework fasteners on engine hatches.
f. Inspect running gear.
g. Provide supervision over project.
h. This is an estimate only once barge is out of the water and can be inspected any other work added will be done at regular shipyard rates and agreed upon with customer.
i. Prepare and submit to USFWS for approval a separate Job Order with cost estimate for the exhaust grate final design, material purchases, fabrication and installation.
j. Note: Estimate on paint quantities as well and may be adjusted if needed. Any additional work will require a new proposal and a modification to the order prior to start of the new work.
Welding:
a. Weld sections, patches, and sanded areas
b. Replace, reseal, repair hatches, hinges
Expected of the contractor:
Contractor shall keep FWS Deputy Refuge Manager (Keith Westlake), and the Contract Specialist updated on any modifications, change orders, and delays.
Note: The government site representative does not have the authority to change the order.
The contractor shall not exceed the awarded value of this order and shall not be compensated on any expenses beyond that amount unless the designated Contracting Officer issues a contract modification.
4. Deliverables and/or Delivery Schedule:
Vessel shall be ready no later than April 19, 2024, as vessel is needed for field work, weather conditions permitting.
Photos of before and after work will be provided to the Contract Specialist upon work completion.
5. Data Management Plan (DMP):
N/A
6. Government-Furnished Equipment (GFE) / Government-Furnished Information (GFI)
N/A
7. Evaluation and Acceptance
Government acceptance is contingent upon:
Work being completed to specified requirements and requests.
8. Quality Control/Quality Assurance:
Quality acceptance will be determined by the Refuge Manage, Keith Westlake upon completion.
9. Technical Coordinator:
Keith Westlake, Deputy Refuge Manager
(361) 550-5076 donald_westlake@fws.gov mailto:donald_westlake@fws.gov