This is a Request for Quotation (RFQ) from the U.S. Fish and Wildlife Service for design, illustration, fabrication, and installation of an orientation kiosk, interpretive panels, and entrance sign at Wapato Lake National Wildlife Refuge in Gaston, Oregon. The total small business set-aside solicitation is for a project with a targeted completion date of November 1, 2026. Evaluation will be based on four factors: price, technical and schedule approach, key personnel qualifications, and relevant experience. Offerors must be registered in the System for Award Management (SAM) and submit quotes by January 15, 2026, at 1700 ET to the contract point of contact.
The Statement of Work requires the contractor to create design elements that welcome visitors, highlight the refuge's role in wildlife conservation, introduce the area's history and cultural significance, and showcase the habitat and wildlife diversity. Specific deliverables include a multi-sided kiosk with informational panels, low-angled interpretive panels, a double-sided entrance sign, bike racks, benches, and a picnic area. Optional line items include landscaping and additional site amenities. The project emphasizes incorporating local tribal art and working closely with refuge staff throughout the design and implementation process. The contract will be awarded on a best-value determination basis, with technical approach weighted more heavily than price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FS126Q0011.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Chelsea Devivo
See continuation page
FWS SAT 1
FWS, SAT Team 1 5275 Leesburg Pike Falls Church VA 22041
FS1
140FS126Q0011
01/08/2026
12/18/2025
1 71
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140FS126Q0011/0001
AMEND: to add drawings to the solicitation no other changes
OR Wapato Lake NWR PPR2091416 LR 2 Wapato Lake
Orientation Kiosk and Panels
Tech POC Karen Ceballos (503) 869-3251 Alt POC
Todd Mckinney 5036255944
Contract POC Kathy Coltran kathryn_coltran@fes.gov
Wapato Kiosk and Panels Solicitation No. 140FS126Q0011
FWS
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued.
U.S. Fish and Wildlife Service, FWS Wapato Lake NWR has a requirement for an Orientation Kiosk and Panels at Sherwood, OR. The anticipated required completion date of November 1, 2026.
This Request for Quotation (RFQ) is total small business set aside and is conducted under the procedures of FAR Part 12 and 13, incorporating provisions and clauses in effect through Federal Acquisition Circular 2025-04. The NAICS code is 339999.
Evaluation Factors Factor 1 – Price:
Price will be evaluated for fairness and reasonableness. It will also be assessed in relation to the overall value of the proposed solution.
Factor 2- Technical & Schedule Approach:
The offeror shall present a sound, compliant approach that meets the requirements of the Statement of Work and demonstrates a thorough understanding of those requirements. The proposal should include:
• A detailed technical approach showing the ability to deliver well-formatted, edited, succinct, and cohesive deliverables.
• Identification of all risks, assumptions, exclusions and dependencies.
• A clear and achievable project schedule with internal procedures to handle delays, manage labor and resource constraints, reduce costs, and avoid schedule creep.
Factor 3 – Key Personnel:
Provide relevant qualifications, experience, and certifications of all key personnel. Resumes must not exceed one page.
Factor 4 – Relevant Experience:
Provide examples of similar projects completed within the past 5 years, particularly with federal agencies, to demonstrate ability to perform work of similar scope and complexity.
Instructions All responsible sources may submit a quote, which shall be considered by the agency. Award will be made as a firm-fixed-price contract. The contract will be awarded to the vendor who proposes the best value product which meets the specifications. Award will be made to a responsible source pursuant to FAR subpart 9.1. Delivery is FOB destination.
Please submit your quotation (showing unit and total price) on company letterhead with UEI No. and point of contact phone number and e-mail address. Additionally, if your company holds a GSA contract that would apply to this requirement, please provide the contract number. Refer to FAR provision 52.212-1 Instructions to Offerors – Commercial Items for additional submission guidance and include a copy of FAR provision 52.212-3 Offeror Representations and Certifications --Commercial Items with applicable sections completed.
Solicitation Questions Due: 01/13/2026 @ 1700 ET to kathryn_coltran@fws.gov Quotes Due: 01/15/2026 @ 1700ET
Wapato Kiosk and Panels Solicitation No. 140FS126Q0011
FWS
E-Mail Quote Submission: kathryn_coltran@fws.gov
In order to have a quote considered for award, respondent must be registered at the System for Award Management (SAM) website (https://www.sam.gov) as an active vendor by the time an award decision is necessary.
mailto:kathryn_coltran@fws.gov
Statement of Work
For Design, Illustration, Fabrication and Installation Site Orientation Kiosk, Interpretive Panels, and Entrance Sign at Wapato Lake National Wildlife Refuge Gaston, OR
For additional information contact Todd McKinney (503) 575-8430 or Karen Ceballos, U.S. Fish and Wildlife Service, (503) 869 3251
Overview of Project:
The project includes the design, fabrication and installation of an orientation kiosk, interpretive panels, and landscaping for Wapato Lake National Wildlife Refuge adjacent to the city of Gaston, OR. A city owned gravel parking lot is situated at the front of the refuge entrance. There is a pit toilet installed, currently, at the beginning of a paved path that leads to the refuge’s main gravel trail. There is a bridge that connects the paved trail to the gravel trail, spanning across Wapato Creek. There is an approximately six-acre field adjacent to the gravel parking lot and the paved trail. There are two accessible parking spaces in the gravel lot as well. This project will focus on the entrance area, a portion of the six-acre field, and the exit from the bridge into the refuge. There will be a line bid option for an entrance sign, benches, a bike rack, and picnic area in the same associated area.
Overview of Site:
Wapato Lake National Wildlife Refuge was established in 2013 and is managed by the U.S. Fish and Wildlife Service’s Tualatin River National Wildlife Refuge Complex. In 2020 the Wapato Lake NWR developed a Hunt Plan and opened the Refuge to public use (waterfowl hunting) for the first time. In 2023 refuge staff completed the second phase and opened the Refuge to additional public uses, compatible with the conservation mission of the USFWS and the National Wildlife Refuge System (Refuge System): wildlife observation, wildlife photography, interpretation, and environmental education. Wapato Lake Refuge’s visitor services program is still in early stages of development. The headquarters for Wapato Lake is at Tualatin River NWR in Sherwood, OR. No staff work at Wapato Lake NWR. These two refuges are about 35 minutes from one another.
Wapato Lake NWR is located adjacent to the City of Gaston, OR (population 526), in Washington and Yamhill Counties. The closest Tribal community is the Confederated Tribes of Grand Ronde, in Grand Ronde, OR. The Refuge lies within a rural area and is approximately 20 miles west of Portland, Oregon. Wapato Lake NWR is part of the Urban Wildlife Conservation Program. This program is focused on working with all communities and ensuring that refuges are safe and welcome for everyone to enjoy. In the Portland-Metro region, there are four refuges that are a part of this national program.
They are Tualatin River, Wapato Lake, Steigerwald, and Ridgefield. The latter two being found just across the river in Washington state.
General Requirements Base Bid
1) (1) Orientation Kiosk
a) Contractor to provide concept design, final design, engineered and stamped construction drawings, fabrication and installation
b) Multi-sided, covered kiosk to house panels listed below.
c) This orientation kiosk will be installed at the entrance near the city-owned gravel parking lot
d) The kiosk should take design cues from the landscape and elements of the refuge’s natural environment.
e) Request that contractor sub-contract with a local tribal artist and work with the artist to incorporate their art in final design, pending coordination with Refuge staff and tribal contacts.
f) Kiosk would include the following information
i) Information on the National Wildlife Refuge System.
ii) Information on Wapato Lake National Wildlife Refuge.
iii) Orientation, rules and regulations, map guiding the visitor, and unique wildlife/habitat to Wapato Lake NWR.
g) Kiosk would include an all weather brochure holder with (2) slots to hold brochures that are 4.25” wide by 8.5” inches tall.
2) Entrance Landscape Design drawings, fabrication, and installation of landscaping to accentuate the entrance sign and orientation kiosk area by the parking lot.
b) Landscape concept drawings are attached to provide a basis for landscape design.
c) All new pathways and visitor use areas around the kiosk and picnic area must comply with current ADA guidelines and regulations regarding slope, width, and surface of the path and visitor areas.
d) Landscaping will include large barrier stones/rocks to prevent vehicles from driving into the kiosk area.
i) A minimum of 1 out of every 3 rocks will need to have a flat surface turned up and horizonal to the ground at approximately 18 inches to 20 inches above grade.
e) Landscaping will use native plants. Soils, and all materials used will be sourced and treated to avoid the introduction of invasive species. Ensure elimination of unacceptable growth before proceeding.
f) Landscaping design will include maintenance and upkeep of plantings for at least 3 months. This includes irrigation of plantings.
g) Contractor will work with Refuge staff to identify best season and conditions to do planting to ensure plant survival.
h) Contractor agrees to repair or replace plantings and accessories that fail in materials, workmanship, or growth within 1 year warranty period.
i) Failures include, but are not limited to the following:
(1) Death and unsatisfactory growth, except for defects resulting from abuse, lack of adequate maintenance, or neglect by the Government
(2) Structural failures including plantings falling or blowing over
ii) Include the following remedial actions as a minimum
(1) Immediately remove dead plants and replace unless required to plant in the succeeding planting season.
(2) Replace plants that are more than 25 percent dead or in an unhealthy condition at end of warranty period.
(3) A limit of one replacement of each plant is required except for losses or replacements due to failure to comply with requirements.
(4) Provide extended warranty for period equal to original warranty period, for replaced plant material.
i) Contractor will provide maintenance for plantings immediately after plants are installed and continue until plantings are acceptably healthy and well established, but for not less than the maintenance period of 12 months.
j) Contractor will work to protect areas adjacent to planting-soil preparation and placement areas from contamination.
3) (2) Low-angled Interpretive Panels drawings, fabrication and installation
b) These panels will be installed at the exit of the bridge, at a viewpoint into the Refuge
c) Designed to be at low height as to not obstruct view
d) Panels will be contour cut, with decorative bases
e) Request that contractor sub-contract with a local tribal artist and work with the artist to incorporate their art in final design, pending coordination with Refuge staff and tribal contacts.
Line Item Bid Options
4) (1) Double-sided Entrance Sign
a) Contractor to provide concept design, final design, engineered and stamped construction drawings, fabrication, and installation of the entrance sign.
b) This sign will be located near the main entrance to Wapato Lake NWR city parking lot.
c) The sign will be two-sided consisting of back-to-back, approximately 5’ x 10’ panels.
Sign specifications will align with the standard National Wildlife Refuge entrance sign design and materials (Attached)
d) The contractor will design and fabricate a stone base and mounting support system for this sign.
e) The sign base should take design cues from the landscape and elements of the refuge’s natural environment.
a) Request that contractor sub-contract with a local tribal artist and work with the artist to incorporate their art in final design, pending coordination with Refuge staff and tribal contacts.
5) Bike Rack
f) One bike parking area with rack(s) for 6 bikes located near the parking lot.
g) Incorporate a wildlife interpretive flair or element to both bike parking areas while maintaining usability and accessibility of structures.
h) At each site, multiple bike racks may be installed in series to achieve better usability than a single long wave or spiral structure. See Association of Pedestrian and Bicycle Professionals “Essentials of Bike Parking” guidance for preferred bike rack styles and usability considerations
2) (2) Benches
a) Two accessible benches to be placed at a viewpoint into the Refuge, with a decorative element.
b) Benches will be designed to ADA standards, one with an arm rest and one without.
Both benches with have a full-length grab bar.
c) Incorporate a wildlife interpretive flair or element to both benches while maintaining usability and accessibility of structures.
3) Picnic Area drawings, fabrication, and installation three picnic tables, a concrete pad, and associated shade structure that are ADA compliant.
b) All new pathways and visitor use areas around the kiosk and picnic area must comply with current ADA guidelines and regulations regarding slope, width, and surface of the path and visitor areas. One of the three picnic tables will be designed to ADA standards as referenced by the US Access Board Outdoor developed areas guide.
c) Incorporate a wildlife interpretive flair or element to the shade structure.
Performed by the Contractor Post –Award Meeting Coordinate and facilitate the initial post-award meeting and all subsequent review meetings with the Service. It is the responsibility of the Contractor to write up the meeting notes summarizing the discussions and accomplishments from each meeting, including decisions, and action items from the Service review. This should be accomplished and provided to the COR within one (1) calendar week after the meeting.
Project Schedule The contractor shall produce a detailed, complete project schedule listing all required meetings, submittals, and their review times. The schedule will include 2-week FWS review time at the major submittal (30-60-90-100%) points. The project schedule shall include interpretive text development, submittal timelines, production schedule, any required installations, and closeout Submittals.
The contractor shall submit a preliminary project schedule to the COR for review and approval ten (10) working days prior to the post award meeting. The contractor shall update the approved schedule and resubmit to the COR five (5) working days prior to every project status meeting for https://www.apbp.org/assets/docs/EssentialsofBikeParking_FINA.pdf https://www.access-board.gov/files/aba/guides/outdoor-guide.pdf the life of the project.
Contractor to propose a schedule with a project completion date of November 1st, 2026.
Design Requirements The Contractor will design, fabricate, build, and install panels at Wapato National Wildlife refuge Refuge. The contractor will complete the following steps:
Interpretive Theme and Text Development The interpretive themes, messages, and text will be developed by the contractor while working closely with the COR and Service staff. The Service staff will provide local knowledge, biological and some historical information to the Contractor, but the Contractor will also be responsible for researching historical and natural history information. The text will be concisely written, reader friendly, use active and expressive language, and be technically accurate. The text and artwork should work together to create a unified interpretive message for each panel.
Graphics and Layout The Contractor will develop the graphics and layout for the panels. This will include providing and locating the graphic elements and photographs. The available stock photos may be limited so the Contractor is responsible for photo research and acquisition of photos to create a successful design. The final layout will combine text and graphic elements into a dynamic and engaging visual presentation. The Contractor will provide the detailed final design files and associated files to the COR.
Fabrication
• The Contractor shall produce exterior grade kiosk and overlook panels to withstand the
• site-specific weather and seismic requirements.
• Panels will be contour cut.
• panel materials, stains, paints, metal elements, etc… shall be presented to the COR for
Service staff review and approval.
• Interpretive panels, at minimum, should be made of a substrate that is UV stabile and of
• an all-weather material.
• Production shall include 12-color high-density printing technology.
• Kiosk panels shall have an edge treatment to prevent delamination.
• Where required, Kiosk panels shall have threaded inserts with accompanying security bolts.
• A 7-year minimum product guarantee is requested.
Review & Approval:
• A minimum of three drafts of each panel’s text and graphic layout, prior to a final version, must be provided by the Contractor to the COR for review by Service staff.
• Final 8"x 10" color laminate sample for each kiosk for color matching and image resolution will be provided by the Contractor to the COR for approval before production.
Installation The Contractor shall furnish all materials and labor to transport the panel components to the site, and to unload and install the panels.
The Contractor shall:
• Install the kiosks, panels, and any fabricated pieces on-site at the Refuge. The installation and completion of the Kiosk shall be projected and scheduled. The CO or COR will be present during the installation to review progress and work, and to discuss solutions to any installation problems that may occur.
• Provide As-Built drawings for installing the panels in the existing structures.
• Return to the Service all materials used as reference and/or to create the artwork for the interpretive panels and exhibits. All original artwork becomes the property of the Service at project completion. All photographs and other reference material shall also be returned to the Service or the original owner.
• The Contractor shall provide their own mechanized equipment, power tools, and equipment to construct and install the panels.
• The Contractor is responsible for removal of all waste materials generated during the installation from the site and shall arrange for proper disposal of this material.
• In accordance with FAR Clause 52.237-2, the contractor shall be responsible for repairing any damage incurred within the work area.
Installation Schedule The contractor shall coordinate and confirm dates with the COR for shipment, delivery, storage, and installation of the interpretive panels at the Service’s site.
Status Reports The contractor shall provide a monthly status report to the COR that includes the status of the project, issues that affect the schedule and budget, and an updated schedule based on the information at hand.
Quality Control The contractor shall provide quality control to ensure that all elements of project work meet the requirements and that all modifications are implemented. The Contractor’s Project Manager shall provide routine inspections of in-house and subcontracted work and shall oversee the quality of work produced and implemented at all phases of the project. Any work found not acceptable or compliant with the specifications shall be corrected prior to inspection or review by the COR.
Government-Furnished Property If government-furnished material is provided during the course of the project, the contractor shall receive, inspect, and inventory all government-furnished materials and ensure that this material is forwarded to the appropriate unit or person within the contractor’s organization for use in the project. The Project Manager shall notify the COR via email within seven (7) days after receipt if government-furnished materials are not satisfactory for their intended purpose. The Project Manager shall notify the COR via email as soon as possible, but no later than three (3) business days, if government- furnished materials are lost or damaged while in the contractor’s possession. The contractor shall be responsible for the security and protection of government furnished property or materials. Following acceptance of all work by the government, the contractor shall return to the COR all government-furnished property.
The Contractor, in addition, shall:
• Contractor to provide an itemized cost estimate for each interpretive element. For each element, costs for design, artwork, illustrations, fabrication and installation to be listed separately.
• Deliver signed releases, licenses, and/or agreements for all talents and other existing works created.
• Acquire, per Government requirements, unlimited worldwide rights for all original elements first produced by the Contractor.
• Attend and participate in all appropriate meetings for coordination of the panels the Service and
COR
• If installation is part of the contract, it shall be projected and scheduled. The CO or COR will be present during the installation to review progress and work, and to discuss solutions to any installation problems that may occur.
• Contractor to review site access for construction equipment for interpretive overlook.
• Provide As-Built drawings for actual installed panels in the existing structures.
• Contractor shall issue a full replacement warranty all products and workmanship for a period of
1 year of normal wear and tear.
The Service Will Provide:
1) All pertinent drawings and technical design details of the site, existing railings, pit toilet, and other elevations and renderings that have been completed.
2) A previously created Master Interpretive Plan that will help guide the overall development of the project.
3) Content experts for biological and cultural topics.
4) Refuge can provide some specific wildlife and scenic high resolution digital photographs.
Exhibit Objectives:
Exhibits will be designed for to meet the following objectives.
1. Welcome visitors to the refuge and provides a sense of drama and interest that encourages visitors to explore further.
2. Make visitors aware of the role of the US Fish & Wildlife Service and National Wildlife Refuge System in protecting wildlife and ecosystems, and that Wapato Lake NWR is part of a national system.
3. Introduce visitors to the history and cultural significance of the land that Wapato Lake sits upon.
Specifically highlighting the past and present connection for Tribal communities.
4. Make visitors aware of the variety of habitats and diversity of wildlife found on the Refuge.
5. Introduce visitors to migratory birds that use the Refuge, and the Refuge’s place in the Pacific Flyway.
6. Introduce visitors to habitats and/or species that are difficult to observe.
7. Inspire visitors to explore, learn about, appreciate, and care for the refuge and natural resources beyond the refuge’s boundary.
Tasks:
The Contractor shall provide all materials, equipment, supplies, and labor required to accomplish the following tasks. The contractor is responsible to complete all tasks to fit within a fixed budget (includes designing exhibits that can be completed within that given budget).
Task 1 - Site Visit Lead designer shall conduct a site visit to Wapato Lake National Wildlife Refuge, Gaston, OR, to attain a familiarity with the refuge, and the requirements of this statement of work to be used in establishing conceptual designs for this project.
Task 2 - Conduct Briefings Conduct briefings with Service project officers, refuge personnel, and refuge partners to present conceptual designs for items listed under (4) below and obtain approval of the Service. Approval of designs to be in writing from the Contracting Officer or the Officer's designated representative.
Task 3 - Produce Deliverables:
1. Contractor to submit four sets of concept to final design drawings for review and approval at 30%, 60%, 90%, and 100% completion milestones. The drawings will include every and all information needed to produce, fabricate and install the signs and exhibits, including:
a. Buildable plans of each exhibit drawn to scale
b. identification and specifications for all necessary materials
c. identification of all colors used
d. identification and specifications for all necessary hardware
2. Final project portfolio illustrating and identifying each graphic item and three-dimensional element, draft text to be included on each graphic panel or exhibit element, color guideline details, photographic and other references to be used by the exhibit fabricator, and specifications. Samples of typefaces and sizes to be used in the exhibits, including headlines, subheads, body text, and captions; and samples of illustration style to be used in exhibits should also be included in this notebook.
3. Final camera-ready artwork for exhibits, including illustration. We expect these exhibits will have both photographs and illustrations. Contractor to provide camera-ready artwork in high resolution digital format (including high resolution scans of all photos and illustrations) ready for output to fabricator.
4. All artwork/illustrations will be both aesthetically pleasing and biologically accurate. Contractor must submit for approval samples of illustrations created by the illustrator that will be used to complete this work.
5. Fabrication of all outdoor interpretive and orientation panels in Folia or similar high pressure laminate material. Panels will be contour cut.
6. Illustration and photo research. FWS can provide some images of Refuge-specific wildlife and scenic high resolution digital photographs, but contractor should anticipate supplementing these images and should budget accordingly. Additionally, contractor must submit for approval, samples of illustrations of the artist/s used to complete this work.
7. Writing and editing of text with topic research including interviewing of subject matter specialists Contractor must submit for approval, samples of interpretive writing of the writer used to complete this work.
8. Contractor shall issue a full replacement warranty all products and workmanship for a period of 1 years of normal wear and tear.
9. Contractor is responsible for fabrication, transportation, and installation of all final approved exhibits.
Schedule and Completion Date:
The Service looks to the contractor to propose a schedule that would culminate with a November 1st, 2026 or earlier completion date for the installation of interpretive overlook and its interpretive panels.
At most major submittal reviews the Service would require a two-week review period.
Response:
Contractor shall prepare a detailed written response to this SOW indicating the following:
1. Hours + fees associated with each proposed task / deliverable as per this SOW
2. Total NTE fee for project
3. Detailed project schedule broken out by task
4. List of subcontracts who will be working on the project including credentials for the person or persons who will be conducting the on site installation and site construction.
5. List of assumptions.
Evaluation Criteria:
The evaluation criteria will result in the product that best demonstrates a unified theme to tell the stories of the Wapato Lake National Wildlife Refuge with the primary themes outlined in the attached interpretive plan.
Contractor who provides the best overall approach to the project will be the awardee based on the following:
1. Technical Approach to Project
2. Price
All proposals shall include the following information. Please be as specific as possible.
1. Technical Approach to Project - The Government will evaluate the offeror’s understanding of the project, by assessing the offeror’s response to this factor. The offeror’s response must convey a clear understanding of the Government’s project, that the offeror is able to accomplish the work properly, efficiently and in a timely fashion. The Government’s assessment will include an evaluation of the following:
a. Evaluation of preliminary concept design and proposed approach for providing an experience to visitors, that through the interpretive process provides clear information about the Refuge purpose, mission, and key messages;
b. Evaluation of Statement of Capability for meeting the timeline requirement;
c. Evaluation of pictures and description of a recent (past 3 years) project completed by the offeror that is similar in size and scope, and dealt with similar content to the proposed project;
d. Evaluation of assumptions.
Technical approach to the project will be the contractor who provides the best overall design to enhance visitors’ understanding of Wapato Lake NWR.
2. Price - Price will be considered and evaluated as an award factor; however, since this project will be awarded as a best value determination and not lowest price technically acceptable, the weight of the criteria will be as rated by Factor 1 – Technical Approach to the Project.
Technical Coordinator:
Please contact Karen Ceballos at 503.869.3251 or email karen_ceballos@fws.gov with questions regarding this scope of work.
End of Statement of Work mailto:karen_ceballos@fws.gov
Dec 5 2025 Services Under SAT, No Addtl Small Biz Set-asides. IDIQ & Options Clauses ARE Included, Brand name or Equal ARE Included, Disaster/Emergency NOT included, for Non-commercial Services, add Clause 52.213-4
Clauses
52.212-4 CONTRACT TERMS AND CONDITIONS –COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (NOV 2023)
---Addendum to 52.212-4---
DIAR 1452.237-70 INFORMATION COLLECTION - DEPARTMENT OF THE INTERIOR (JUL
1996)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation: https://www.acquisition.gov/far Department of the Interior Acquisition Regulation: https://www.acquisition.gov/diar
(End of clause)
DOI-AAAP-0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-INVOICE
PROCESSING PLATFORM (IPP) (FEB 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
'Payment request' means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:
https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
PDF Vendor-created invoice
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone
(866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
http://www.acquisition.gov/far http://www.acquisition.gov/diar http://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov
Dec 5 2025 Services Under SAT, No Addtl Small Biz Set-asides. IDIQ & Options Clauses ARE Included, Brand name or Equal ARE Included, Disaster/Emergency NOT included, for Non-commercial Services, add Clause 52.213-4
(End of Local Clause)
DOI-AAAP-0050 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (DEC
2015 and up to v.3)
1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a) Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.
b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c) All information provided should be reviewed for accuracy prior to submission.
d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6) The following guidelines apply concerning your use of the past performance evaluation:
a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
http://www.cpars.gov/ http://www.cpars.gov/
Dec 5 2025 Services Under SAT, No Addtl Small Biz Set-asides. IDIQ & Options Clauses ARE Included, Brand name or Equal ARE Included, Disaster/Emergency NOT included, for Non-commercial Services, add Clause 52.213-4
b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
52.204-28 Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts (Dec 2023)
52.204-29 Federal Acquisition Supply Chain Security Act Orders—Representation and Disclosures (Dec 2023)
52.204-30 Federal Acquisition Supply Chain Security Act Orders—Prohibition (Dec 2023)
52.217-2 CANCELLATION UNDER MULTI-YEAR CONTRACTS (OCT 1997)
52.216-19 ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than , the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor-
(1) Any order for a single item in excess of ;
(2) Any order for a combination of items in excess of ; or
(3) A series of orders from the same ordering office within days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph
(b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within days after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source. (End of clause)
Dec 5 2025 Services Under SAT, No Addtl Small Biz Set-asides. IDIQ & Options Clauses ARE Included, Brand name or Equal ARE Included, Disaster/Emergency NOT included, for Non-commercial Services, add Clause 52.213-4
52.216-22 INDEFINITE QUANTITY (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the 'maximum.' The Government shall order at least the quantity of supplies or services designated in the Schedule as the 'minimum.'
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract afterPoP Expiration.
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days prior to PoP expiration.
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
Dec 5 2025 Services Under SAT, No Addtl Small Biz Set-asides. IDIQ & Options Clauses ARE Included, Brand name or Equal ARE Included, Disaster/Emergency NOT included, for Non-commercial Services, add Clause 52.213-4
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years 6 months.
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any Department of the Interior Acquisition Regulation (48 CFR Chapter 14) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
(End of clause)
52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Products and Commercial Services (Oct 2025)
As prescribed in 12.301(b)(4), insert the following clause:
CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL
PRODUCTS AND COMMERCIAL SERVICES (OCT 2025)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) ( 31 U.S.C.
3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[Contracting Officer check as appropriate.] https://www.acquisition.gov/far/12.301#FAR_12_301 https://www.acquisition.gov/far/52.203-19#FAR_52_203_19 https://www.acquisition.gov/far/52.204-23#FAR_52_204_23 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.acquisition.gov/far/52.209-10#FAR_52_209_10 https://www.acquisition.gov/far/52.232-40#FAR_52_232_40 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3801&num=0&edition=prelim https://www.acquisition.gov/far/52.233-3#FAR_52_233_3 https://www.acquisition.gov/far/52.233-4#FAR_52_233_4
Dec 5 2025 Services Under SAT, No Addtl Small Biz Set-asides. IDIQ & Options Clauses ARE Included, Brand name or Equal ARE Included, Disaster/Emergency NOT included, for Non-commercial Services, add Clause 52.213-4
__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509)).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
__ (4) 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).
_X_ (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-
282) ( 31 U.S.C. 6101 note).
__ (6) [Reserved].
__ (7) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).
__ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L.
111-117, section 743 of Div. C).
_X_ (9) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L.
117-328).
_X_ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (DEC 2023) ( Pub. L. 115–390, title II).
_X_ (11) (i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (DEC 2023) ( Pub. L. 115– 390, title II).
_X_ (ii) Alternate I (DEC 2023) of 52.204-30.
_X_ (12) 52.209-6, Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (JAN 2025) ( 31 U.S.C. 6101 note).
__ (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) ( 41 U.S.C. 2313).
__ (14) [Reserved].
__ (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022) ( 15 U.S.C. 657a).
__ (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
__ (17) [Reserved]
X__ (18) (i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
__ (ii) Alternate I (MAR 2020) of 52.219-6.
__ (19) (i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
__ (ii)…