140FNR25Q0023.pdf
PDF 993 KB Posted
- Attached to
- AL-DEEP HORIZON NRDA-ECOSYSTEM PLANTS
- Solicitation number
- 140FNR25Q0023
About this file
This is a Request for Quote (RFQ) for native panhandle dune ecosystem plants for the U.S. Fish and Wildlife Service's Natural Resource Damage Assessment and Restoration (NRDAR) program related to the Deepwater Horizon restoration effort. The solicitation seeks plant supplies across multiple delivery phases from August 2025 to January 2026, with specific requirements for different locations including Western Perdido Key, Grayton Beach, Deer Lake State Park, St. Andrews State Park, Eastern Perdido Key, Fort Pickens, and Santa Rosa.
The procurement involves multiple plant species including Sea Oats, Bitter Panicum, Beach Elder, Gulf Bluestem, Coastal Groundcherry, Godfrey's Goldenaster, Littleleaf Milkpea, Beach Morning Glory, and Seabeach Evening Primrose. The total plant quantities range from 21,555 plants in the base bid to over 186,915 plants in Option Bid 2. The solicitation is set aside for small businesses, with a NAICS code of 111421 (Nursery and Tree Production), and uses a best value trade-off evaluation methodology that considers technical approach, delivery dates, experience, past performance, and price, with the first three factors weighted more heavily than price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FNR25Q0023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
FNR
Falls Church VA 22041 5275 Leesburg Pike
FWS, NRDAR
FWS, NRDAR
0011279989 CODE 16. ADMINISTERED BYCODE
X
X
111421
SIZE STANDARD:
% FOR:SET ASIDE:UNRESTRICTED ORFNR
REQUEST FOR
PROPOSAL
(RFP)
INVITATION
FOR BID (IFB)
10. THIS ACQUISITION ISCODE
REQUEST FOR
QUOTE (RFQ)
14. METHOD OF SOLICITATION
13b. RATING
NORTH AMERICAN INDUSTRY
CLASSIFICATION STANDARD
(NAICS):
SMALL BUSINESS
06/10/2025 1100 ED
05/27/2025
7033582631William Fluharty (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBERa. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
140FNR25Q0023
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 58 0044017490OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
FAIRHOPE AL 36532
341 Greeno Road North, Suite A
DEEPWATER HORIZON GULF
15. DELIVER TO
Falls Church VA 22041 5275 Leesburg Pike
FWS, NRDAR
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$3.25
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FREE ON BOARD
(FOB) DESTINATION UNLESS
BLOCK IS MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS THIS CONTRACT IS A RATED
ORDER UNDER THE DEFENSE
PRIORITIES AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
8(A)
FWS, NRDAR
WOMEN-OWNED SMALL
BUSINESS (WOSB)
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
NRDAR: FL Dunes, Native Panhandle Dune Ecosystem Plant Supply, No PID (NFWF)
Tech POC: Ashley Warren 470-877-8197
Alt POC Kara Barcomb 251-510-6762 kara_barcomb@fws.gov
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
DATED
William Fluharty
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Government Use Only)
OFFER
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT: REFERENCE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 11/2021) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
00010 Base Bid Western Perdido Key Sites
Delivery: 08/18/2025
Period of Performance: 08/04/2025 to 08/18/2025
00020 Option Bid 1 Plants Grayton Beach and Deer Lake
Delivery: 08/18/2025
Period of Performance: 08/04/2025 to 08/18/2025
00030 Option Bid 2 - Plants St Andrews State Park
Delivery: 08/18/2025
Period of Performance: 08/04/2025 to 08/18/2025
00040 Option Bid 3 St Andrews, Eastern Perdido Key, Fort Pikens and Santa Rosa
Delivery Dates Jan 5th - Jan 16th.
Delivery: 01/16/2026
Period of Performance: 01/05/2026 to 01/16/2026
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
2 2 of
Contents B -Supplies or Services/Prices C - Description/Specifications/Statement of Requirements D – Packaging and Marking E – Inspection and Acceptance F - Deliveries or Performances G – Contract Administration Data H – Special Contract Requirements I – Contract Clauses J - List of Documents, Exhibits and Other Attachments K – Representations, Certifications, and Other Statements of Offerors L – Instructions to Offerors M – Evaluation Factors for Award 52.212-2 Evaluation - Commercial Products and Commercial Services. (NOV 2021)
Combined Synopsis/Solicitation
Solicitation Title: NFWF Dunes Plant Supply Solicitation Number: 140FNR25Q0023 Response Date: 06/10/2025 at 11:00 AM EST Questions by: 06/03/2025 at 11:00 AM EST Classification Code: 8730 Set Aside: Full and Open Competition NAICS Code: 111421 – Nursery and Tree Production:
U.S Fish and Wildlife Service Joint Administrative Operations | Acquisition Goods and Services Operations, NRDAR Team
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in the Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. The U.S. Fish and Wildlife Service, USFWS Natural Resource Damage Assessment and Restoration, Deep Water Horizon is in need to plants at various locations in Florida.
Solicitation # 140FNR25Q0023 is issued as a request for quote (RFQ). This RFQ is conducted under the procedures of FAR Parts 12 and 13. The solicitation documents and incorporated provisions and clauses are those in effect through Federal Acquisition Circular.
The NAICS code is 111421.
All responsible small business sources may submit a quote, which shall be considered by the agency. A Firm-Fixed Price commercial order will be issued as a result of this solicitation
Combined Solicitation/Synopsis #140FNR25Q0023 NRDAR Native Panhandle Dune Ecosystem Plants
B -Supplies or Services/Prices
Base Bid - Western Perdido Key Delivery Aug 4 - Aug 18, 2025 Total Plants 21,555
Species Number of plants
Price per each
Total Price Date you can deliver Delivery Location
Gulf bluestem (Schizachyrium maritimum ) 21,555
Option Bid 1 - Grayton Beach and Deer Lake State Park Delivery Aug 4 - Aug 18, 2025 Total Plants 17,167
Species Number of plants
Price per each
Total Price Date you can deliver Delivery Location
Sea Oats (Uniola paniculata ) 8,838 Bitter panicum (Panicum amarum ) 791
Beach Elder (Iva imbricata ) 135 Gulf bluestem (Schizachyrium maritimum ) 7,403
Total
Option Bid 2 - St. Andrews State Park Delivery Aug 4 - Aug 18, 2025 Total Plants 186,915
Species Number of plants
Price per each
Total Price Date you can deliver Delivery Location
Sea Oats (Uniola paniculata ) 60,823 Bitter panicum (Panicum amarum ) 53,583
Beach Elder (Iva imbricata ) 24,194 Gulf bluestem (Schizachyrium maritimum ) 48,315
Total
Option Bid 3 - St. Andrews State Park (2nd delivery) Delivery Jan 5 - Jan 16, 2026 Total plants 2,450
Species Number of plants
Price per each
Total Price Date you can deliver Delivery Location
Coastal Groundcherry (Physalis angustifolia ) 490
Godfrey’s Goldenaster (Chrysopsis godfreyi ) 490
Littleleaf Milkpea (Galactia microphylla ) 490
Beach Morning Glory (Ipomea imperati ) 490
Seabeach Evening Primrose (Oenothera humifusa ) 490
Option Bid 3 - Eastern Perdido Key (2nd delivery) Delivery Jan 5 - Jan 16, 2026 Total Plants 4,160
Species Number of plants
Price per each
Total Price Date you can deliver Delivery Location
Coastal Groundcherry (Physalis angustifolia ) 2,020
Godfrey’s Goldenaster (Chrysopsis godfreyi ) 160
Littleleaf Milkpea (Galactia microphylla ) 1,660
Beach Morning Glory (Ipomea imperati ) 160
Seabeach Evening Primrose (Oenothera humifusa ) 160
Option Bid 3 - Fort Pickens Delivery Jan 5 - Jan 16, 2026 Total Plants 3,700
Species Number of plants
Price per each
Total Price Date you can deliver Delivery Location
Coastal Groundcherry (Physalis angustifolia ) 740
Godfrey’s Goldenaster (Chrysopsis godfreyi ) 740
Littleleaf Milkpea (Galactia microphylla ) 740
Beach Morning Glory (Ipomea imperati ) 740
Seabeach Evening Primrose (Oenothera humifusa ) 740
Option Bid 3 - Santa Rosa Deliver Jan 5 - Jan 16, 2026 Total plants 4,185
Species Number of plants
Price per each
Total Price Date you can deliver Delivery Location
Coastal Groundcherry (Physalis angustifolia ) 865
Godfrey’s Goldenaster (Chrysopsis godfreyi ) 830
Littleleaf Milkpea (Galactia microphylla ) 830
Beach Morning Glory (Ipomea imperati ) 830
Seabeach Evening Primrose (Oenothera humifusa ) 830
Total Option Bid 3 Grand Total $
Fort Pickens, Battery Langdon Preservation
Shop, Fort Pickens Rd., Pensacola Beach, FL
32561
Gulf Islands National Seashore, Opal Beach
Parking Lot E, 1 FL- 399, Pensacola Beach, FL 32561
TBD but either 133333 Johnson Beach Rd, Pensacola, FL 32507 OR Unnamed Road, 357 Main Park Rd, Santa Rosa Beach, FL
32459. End of road near Kayak launch
Approximately 4415 Thomas Dr, Panama
City Beach, FL 32408
Approximately 4415 Thomas Dr, Panama
City Beach, FL 32408
133333 Johnson Beach Rd., Pensacola, FL
32507
(End of Section B)
C - Description/Specifications/Statement of Requirements
1. General:
Supply Order for Native Panhandle Dune Ecosystem Plants
The U.S. Fish & Wildlife Service (USFWS) has a requirement for the following native coastal dune species in the following amounts at the following times:
Base Bid – Gulf Bluestem for “Western Perdido Key” sites of Johnson Beach and Perdido Key State Park The preferred timeframe for plant delivery is between August 4 and August 18, 2025. The contractor must indicate as part of their offer whether they are able to deliver the plants by August 18, 2025. If the contractor cannot deliver the plants by August 18, 2025, the contractor must indicate the earliest date that the plants could be delivered as part of their offer. This date will be used to evaluate whether the offer is technically acceptable.
Species Amount Delivery
Location Gulf bluestem (Schizachyrium maritimum) 21,555 TBD but either
133333 Johnson Beach Rd, Pensacola, FL
32507 OR
Unnamed Road, Pensacola, FL
32507
Total Plants 21,555
Option Bid 1- Foredune Plants for Grayton Beach and Deer Lake State Park The preferred timeframe for plant delivery is between August 4 and August 18, 2025. The contractor must indicate as part of their offer whether they are able to deliver the plants by August 18, 2025. If the contractor cannot deliver the plants by August 18, 2025, the contractor must indicate the earliest date that the plants could be delivered as part of their offer. This date will be used to evaluate whether the offer is technically acceptable.
Species Amount Delivery
Location Sea Oats (Uniola paniculata) 8,838 357 Main Park
Rd, Santa Rosa Beach, FL 32459.
End of road near
Kayak launch
Bitter panicum (Panicum amarum) 791 Beach Elder (Iva imbricata) 135 Gulf bluestem (Schizachyrium maritimum) 7,403 Total Plants 17,167
Option Bid 2 – Foredune Plants for Saint Andrews State Park.
The preferred timeframe for plant delivery is between August 4 and August 18, 2025. The contractor must indicate as part of their offer whether they are able to deliver the plants by August 18, 2025. If the contractor cannot deliver the plants by August 18, 2025, the contractor must indicate the earliest date that the plants could be delivered as part of their offer. This date will be used to evaluate whether the offer is technically acceptable.
Species Amount Delivery
Location Sea Oats (Uniola paniculata) 60,823 Approximately
4415 Thomas Dr, Panama City
Beach, FL 32408
Bitter panicum (Panicum amarum) 53,583 Beach Elder (Iva imbricata) 24,194 Gulf bluestem (Schizachyrium maritimum) 48,315 Total Plants 186,915
Option Bid 3 – Diversity Plants for Saint Andrews State Park, Eastern Perdido Key, Fort Pickens, and Santa Rosa.
The preferred timeframe for plant delivery is between January 5 and January 16, 2026. The contractor must indicate as part of their offer whether they are able to deliver the plants by January 16, 2026. If the contractor cannot deliver the plants by January 16, 2026, the contractor must indicate the earliest date that the plants could be delivered as part of their offer. This date will be used to evaluate whether the offer is technically acceptable.
St. Andrews State Park Species Amount Delivery
Location Coastal Groundcherry (Physalis angustifolia) 490 Approximately
4415 Thomas Dr, Panama City
Beach, FL 32408
Godfrey’s Goldenaster (Chrysopsis godfreyi) 490 Littleleaf Milkpea (Galactia microphylla) 490 Beach Morning Glory (Ipomea imperati) 490 Seabeach Evening Primrose (Oenothera humifusa) 490 Total Plants 2,450
Eastern Perdido Key
Location Coastal Groundcherry (Physalis angustifolia) 2,020 133333 Johnson
Beach Rd., Pensacola, FL
32507
Godfrey’s Goldenaster (Chrysopsis godfreyi) 160 Littleleaf Milkpea (Galactia microphylla) 1,660 Beach Morning Glory (Ipomea imperati) 160 Seabeach Evening Primrose (Oenothera humifusa) 160 Total Plants 4,160
Fort Pickens
Location Coastal Groundcherry (Physalis angustifolia) 740 Fort Pickens, Battery Langdon Preservation
Shop, Fort Pickens Rd., Pensacola Beach, FL 32561
Godfrey’s Goldenaster (Chrysopsis godfreyi) 740 Littleleaf Milkpea (Galactia microphylla) 740 Beach Morning Glory (Ipomea imperati) 740 Seabeach Evening Primrose (Oenothera humifusa) 740 Total Plants 3,700
Santa Rosa
Location
Coastal Groundcherry (Physalis angustifolia) 865 Gulf Islands National
Seashore, Opal Beach Parking
Lot E, 1 FL-399, Pensacola Beach, FL 32561
Godfrey’s Goldenaster (Chrysopsis godfreyi) 830 Littleleaf Milkpea (Galactia microphylla) 830 Beach Morning Glory (Ipomea imperati) 830 Seabeach Evening Primrose (Oenothera humifusa) 830 Total Plants 4,185
Cuttings and Seed Source:
If the contractor does not have access to propagation material required for all species, except for Sea oats, Bitter panicum, Beach elder, and Gulf bluestem, USFWS will work with University of Florida and the Contractor to ensure the Contractor is supplied with an appropriate number of seedlings or cuttings required to start production of those species.
For plants to be accepted for payment they will need to meet specifications as outlined under the “Technical Specifications” section upon pickup by, or delivery to, the Government or Government partner.
Key Government Personnel: The following personnel are considered key personnel by the Government:
Contract Officer: William Fluharty, U.S. Fish and Wildlife Service, Joint Administrative Operations Email:
william_fluharty@fws.gov
Contracting Officer’s Representative: Kara Barcomb, U.S. Fish and Wildlife Service, Gulf Restoration Office, Ph: 251-510-6762; Email: kara_barcomb@fws.gov
Project Manager: Ashley Warren, U.S. Fish and Wildlife Service, Gulf Restoration Office, Ph: 470-877- 8197; Email: ashley_warren@fws.gov.
Government Designated Inspector: Matthew Moelling, University of Florida, Ph: TBD; Email:
mmoelling@ufl.edu mailto:william_fluharty@fws.gov mailto:kara_barcomb@fws.gov mailto:ashley_warren@fws.gov
Technical Specifications:
Table 1. Technical Specifications Summary Technical Specification
Species Container Size (in)
Rootball Size (in)
Minimum Tillers / Stems (each)
Minimum Height (in)
TS-1 All Plants N/A N/A N/A N/A TS-2 Sea Oats (Uniola paniculata) 2 2 1 12
TS-3 Bitter panicum (Panicum amarum)
2 2 2 8
TS-4 Beach Elder (Iva imbricata)
4 4 2 6
TS-5 Coastal Groundcherry (Physalis angustifolia)
4 4 3 3
TS-6 Gulf bluestem (Schizachyrium maritimum)
2 2 2 8
TS-7 Godfrey’s Goldenaster (Chrysopsis godfreyi)
4 4 1 4
TS-8 Littleleaf Milkpea (Galactia microphylla)
4 4 1 6
TS-9 Beach Morning Glory (Ipomea imperati)
2 2 1 4
TS-10 Seabeach Evening Primrose (Oenothera humifusa)
4 4 1 4
TS-1 All Plants
1.1 The Government shall approve or reject plant materials for acceptance and payment based on their adherence to specifications outlined in TS-1 through TS-13, as applicable. At a minimum, plant material shall be inspected by the Government prior to pick up and acceptance or delivery to restoration sites and acceptance. The Government reserves the right to reject plant materials any time prior to final inspection and acceptance.
1.1.1 Inspections shall be carried out by the Government Designated Inspector at least once, per batch, prior to packing and shipping from the nursery and upon delivery of each batch.
1.1.2 Inspections shall be done through visual inspections and measurements by the
Government Designated Inspector. Inspections shall be done through random sampling of plants for each batch, unless the batch number is small enough that the Government Designated Inspector determines they can perform a 100% inspection.
1.1.3 After completing inspections, the Government Designated Inspector shall draft and submit an inspection report to Government’s Project Manager. The Project Manager shall determine the batch is acceptable if 95% or greater of the supplied plants meet technical specifications outlined in this contract.
1.2 The contracting nursery shall acclimate plant materials by growing plants in full sun conditions for at least ten (10) days prior to pick up or delivery. A legible copy of all current state nursery license(s) and/or permit(s) issued to the contracting nursery (or nurseries, or their Subcontractors) to be utilized by the Contractor shall be provided to the Government prior to delivery of the plants to the project site.
1.3 Certification, via communication between the Contractor and the Government, shall be provided that all plant materials have been produced in accordance with federal and state laws where applicable. Federal and State Quarantine Summaries are available through the Regulatory Affairs Director, American Nursery and Landscape Association, Washington, DC.
1.4 The Contractor, or its Subcontractor, shall secure all permits required in the transportation, collection, and propagation of nursery stock and submit a copy to the Government, as applicable.
1.5 Plants shall be free of defects, disfiguring, sun scalding, diseases, insects, insect eggs, borers, or other forms of infections or infestation.
1.6 Plants shall be viable and actively growing as indicated by a proliferation of new root development within the container. Plants must show sufficient growth so that a soil root-ball remains formed when the plant is removed from the container. No plants shall be loose in containers.
1.7 Plants appearing discolored, shriveled, dehydrated, or otherwise damaged will be rejected and shall be removed and replaced immediately at the Contractor’s expense. Plants not meeting specifications shall be replaced at the Contractor’s expense.
1.8 The Contractor and the nursery (or nurseries) shall make available for inspection to the Government the specified plants that are to be used for this project.
1.9 When the Contractor delivers the plants to the project sites, all plants shall be packed for delivery from the nursery to the delivery site and from the delivery site to the planting site in such a manner as to ensure adequate protection against climatic, seasonal, wind damage or other injuries during transit. Special care shall be taken for prompt delivery and careful handling in loading and unloading. Damaged plants shall be rejected by the Government and shall be removed and replaced immediately at the Contractor’s expense.
1.10 Each individual shipment of plants to the delivery site shall be accompanied by a delivery slip indicating the following information: 1) source of plant material (nursery name), 2) species (scientific and common name), 3) plant size, 4) quantity being delivered, 5) date of delivery, and
6) date dug or packed for shipment. Shipping slips are to be signed by the Contractor. Copies of the shipping slips shall be provided to the Government and/or its Resident Project Representative at time of plant delivery.
1.11 The growing medium shall be free of any foreign objects such as glass, shell, stones, pottery, or other debris not generally considered standard potting media. Acceptable growing medium shall be a homogeneous mixture of various substrates such as shredded pine wood, pine bark (¾ and ⅜ size), hardwood, coconut fiber, or rice hulls. Growing media shall not contain perlite or other inorganic components, such as Styrofoam. Commercially prepared horticulture potting mixes are suitable but also shall not contain inorganic components, such as perlite or Styrofoam.
TS-2. Sea Oats (Uniola paniculata)
2.1 Origin: Acceptable Sea Oats (Uniola paniculata) plants for the purpose of this Contract are nursery grown plants produced vegetatively or from seed collected from source materials originating from the Gulf coast of Florida.
2.1.1 Plants produced from cuttings or seeds collected from the project area are preferred.
Plants produced from cell and tissue culture lines, DNA fragments and pollen, or other methods of biotechnology are not acceptable.
2.2 Size: At the time of delivery or pick up, acceptable Sea Oats (Uniola paniculata) will meet the following size specifications:
2.2.1 Container Size: Sea Oats (Uniola paniculata) shall be grown in 2-inch containers.
2.2.2 Rootball: Sea Oats (Uniola paniculata) shall have a minimum 2-inch rootball.
2.2.3 Minimum Actively Growing Tillers: Sea Oats (Uniola paniculata) shall have a minimum of 1 actively growing tillers.
2.2.4 Minimum Height: Each Sea Oats (Uniola paniculata) shall have a minimum tiller height of twelve (12) inches from the stem-root interface to the tiller tip.
TS-3. Bitter Panicum (Panicum amarum var. amarum)
3.1 Origin: Acceptable Bitter Panicum (Panicum amarum var. amarum) plants for the purpose of this Contract are nursery grown plants produced vegetatively or from seed collected from source materials originating from the Gulf coast of Florida.
3.1.1 Plants produced from cuttings or seeds collected from the project area are preferred.
Plants produced from cell and tissue culture lines, DNA fragments and pollen, or other methods of biotechnology are not acceptable.
3.2 Size: At the time of delivery or pick up, acceptable Bitter Panicum (Panicum amarum var.
amarum) will meet the following size specifications:
3.2.1 Container Size: Bitter Panicum (Panicum amarum var. amarum) shall be grown in 2-inch containers.
3.2.2 Rootball: Bitter Panicum (Panicum amarum var. amarum) shall have a minimum 2-inch rootball at time of delivery.
3.2.3 Minimum Actively Growing Stems / Tillers: Bitter Panicum (Panicum amarum var.
amarum) shall have a minimum of 2 actively growing stems / tillers.
3.2.4 Minimum Height: Bitter Panicum (Panicum amarum var. amarum) shall have a minimum tiller heigh of eight (8) inches from the stem-root interface to the tiller tip.
TS-4. Beach Elder (Iva imbricata)
4.1 Origin: Acceptable Beach Elder (Iva imbricata) plants for the purpose of this Contract are nursery grown plants produced vegetatively or from seed collected from source materials originating from the Gulf coast of Florida.
4.1.1 Plants produced from cuttings or seeds collected from the project area are preferred.
Plants produced from cell and tissue culture lines, DNA fragments and pollen, or other methods of biotechnology are not acceptable.
4.2 Size: At the time of delivery or pick up, acceptable Beach Elder (Iva imbricata) will meet the following size specifications
4.2.1 Container Size: Beach Elder (Iva imbricata) shall be grown in 4-inch containers.
4.2.2 Rootball: Beach Elder (Iva imbricata) shall have a minimum 4-inch rootball at time of delivery.
4.2.3 Minimum Actively Growing Stems / Tillers: Beach Elder (Iva imbricata) shall have a minimum of 2 actively growing stems / tillers.
4.2.4 Minimum Height: Each Beach Elder (Iva imbricata) shall have a minimum stem heigh of six (6) inches from the stem-root interface to the leaf tip.
TS-5. Coastal Groundcherry (Physalis angustifolia)
5.1 Origin: Acceptable Coastal Groundcherry (Physalis angustifolia) plants for the purpose of this Contract are nursery grown plants produced vegetatively or from seed collected from source materials originating from the Gulf coast of Florida.
5.1.1 Plants produced from cuttings or seeds collected from the project area are preferred.
Plants produced from cell and tissue culture lines, DNA fragments and pollen, or other methods of biotechnology are not acceptable.
5.2 Size: At the time of delivery or pick up, acceptable Coastal Groundcherry (Physalis angustifolia) will meet the following size specifications
5.2.1 Container Size: Coastal Groundcherry (Physalis angustifolia) shall be grown in 4-inch containers.
5.2.2 Rootball: Coastal Groundcherry (Physalis angustifolia) shall have a minimum 4-inch rootball at time of delivery.
5.2.3 Minimum Actively Growing Stems / Tillers: Coastal Groundcherry (Physalis angustifolia) shall have a minimum of 3 actively growing stems / tillers.
5.2.4 Minimum Height: Each Coastal Groundcherry (Physalis angustifolia) shall have a minimum stem of three (3) inches from the stem-root interface to the leaf tip.
TS-6. Gulf Bluestem (Schizachyrium maritimum)
6.1 Origin: Acceptable Gulf Bluestem (Schizachyrium maritimum) plants for the purpose of this Contract are nursery grown plants produced vegetatively or from seed collected from source materials originating from the Gulf coast of Florida.
6.1.1 Plants produced from cuttings or seeds collected from the project area are preferred.
Plants produced from cell and tissue culture lines, DNA fragments and pollen, or other methods of biotechnology are not acceptable.
6.2 Size: At the time of delivery or pick up, acceptable Gulf Bluestem (Schizachyrium maritimum) will meet the following size specifications
6.2.1 Container Size: Gulf Bluestem (Schizachyrium maritimum)shall be grown in 2-inch containers.
6.2.2 Rootball: Gulf Bluestem (Schizachyrium maritimum)shall have a minimum 2-inch rootball at time of delivery.
6.2.3 Minimum Actively Growing Stems / Tillers: Gulf Bluestem (Schizachyrium maritimum) shall have a minimum of 2 actively growing stems / tillers.
6.2.4 Minimum Height: Each Gulf Bluestem (Schizachyrium maritimum) shall have a minimum stem or tiller height of eight (8) inches from the stem-root interface to the stem
TS-7. Godfreys Goldenaster (Chrysopsis gossypina godfreyi)
7.1 Origin: Acceptable Godfreys Goldenaster (Chrysopsis gossypina godfreyi) plants for the purpose of this Contract are nursery grown plants produced vegetatively or from seed collected from source materials originating from the Gulf coast of Florida.
7.1.1 Plants produced from cuttings or seeds collected from the project area are preferred.
Plants produced from cell and tissue culture lines, DNA fragments and pollen, or other methods of biotechnology are not acceptable.
7.2 Size: At the time of delivery or pick up, acceptable Godfreys Goldenaster (Chrysopsis gossypina godfreyi) will meet the following size specifications
7.2.1 Container Size: Godfreys Goldenaster (Chrysopsis gossypina godfreyi) shall be grown in
4-inch containers.
7.2.2 Rootball: Godfreys Goldenaster (Chrysopsis gossypina godfreyi) shall have a minimum 4-inch rootball at time of delivery.
7.2.3 Minimum Actively Growing Stems / Tillers: Godfreys Goldenaster (Chrysopsis gossypina godfreyi) shall have a minimum of 1 actively growing stems / tillers.
7.2.4 Minimum Stem Height: Each Godfreys Goldenaster (Chrysopsis gossypina godfreyi) shall have a minimum stem height of four (4) inches from the stem-root interface to the leaf tip.
TS-8. Littleleaf Milkpea (Galactia microphylla)
8.1 Origin: Acceptable Littleleaf milkpea (Galactia microphylla) plants for the purpose of this
Contract are nursery grown plants produced from seed collected from source materials originating from the Gulf coast of Florida.
8.1.1 Plants produced from seeds collected from the project area are preferred. Plants produced from cell and tissue culture lines, DNA fragments and pollen, or other methods of biotechnology are not acceptable.
8.2 Size: At the time of delivery or pick up, acceptable Littleleaf milkpea (Galactia microphylla) will meet the following size specifications
8.2.1 Container Size: Littleleaf milkpea (Galactia microphylla) shall be grown in 4-inch containers.
8.2.2 Rootball: Littleleaf milkpea (Galactia microphylla) shall have a minimum 4-inch rootball at time of delivery.
8.2.3 Minimum Actively Growing Stems / Tillers: Littleleaf milkpea (Galactia microphylla) shall have a minimum of 1 actively growing stems / tillers.
8.2.4 Minimum Height: Each Littleleaf milkpea (Galactia microphylla) shall have a minimum stem height of six (6) inches from the stem-root interface to the stem tip.
TS-9. Beach Morning Glory (Ipomea imperati)
9.1 Origin: Acceptable Beach morning glory (Ipomea imperati) plants for the purpose of this Contract are nursery grown plants produced vegetatively or from seed collected from source materials originating from the Gulf coast of Florida.
9.1.1 Plants produced from cuttings or seeds collected from the project area are preferred.
Plants produced from cell and tissue culture lines, DNA fragments and pollen, or other methods of biotechnology are not acceptable.
9.2 Size: At the time of delivery or pick up, acceptable Beach morning glory (Ipomea imperati) will meet the following size specifications
9.2.1 Container Size: Beach morning glory (Ipomea imperati) shall be grown in 2-inch containers.
9.2.2 Rootball: Beach morning glory (Ipomea imperati) shall have a minimum 2-inch rootball at time of delivery.
9.2.3 Minimum Actively Growing Stems / Tillers: Beach morning glory (Ipomea imperati) shall have a minimum of 1 actively growing stems / tillers.
9.2.4 Minimum Stem Height: Each Beach morning glory (Ipomea imperati)shall have a minimum stem height of four (4) inches from the stem-root interface to the stem tip.
TS-10. Sea Beach Evening Primrose (Oenothera humifusa)
10.1 Origin: Acceptable Sea beach evening primrose (Oenothera humifusa) plants for the purpose of this Contract are nursery grown plants produced vegetatively or from seed collected from source materials originating from the Gulf coast of Florida.
10.1.1 Plants produced from cuttings or seeds collected from the project area are preferred.
Plants produced from cell and tissue culture lines, DNA fragments and pollen, or other methods of biotechnology are not acceptable.
10.2 Size: At the time of delivery or pick up, acceptable Sea beach evening primrose (Oenothera humifusa) will meet the following size specifications
10.2.1 Container Size: Sea beach evening primrose (Oenothera humifusa) shall be grown in 4-inch containers.
10.2.2 Rootball: Sea beach evening primrose (Oenothera humifusa) shall have a minimum 4-inch rootball at time of delivery.
10.2.3 Minimum Actively Growing Stems / Tillers: Sea beach evening primrose (Oenothera humifusa) shall have a minimum of 1 actively growing stems / tillers.
10.2.4 Minimum Stem Height: Each Sea beach evening primrose (Oenothera humifusa) shall have a minimum stem heigh of four (4) inches from the stem-root interface to the stem tip.
(End of Section C)
D – Packaging and Marking
N/A
(End of Section D)
E – Inspection and Acceptance
(End of Section E)
F - Deliveries or Performances
F.1.0. PERIOD OF PERFORMANCE
Period of Performance 10 July 2025 to 19 July 2025.
F.2.0 RECOGNIZED HOLIDAYS
The following legal holidays are observed by this Government agency:
New Year’s Day January 1 Birthday of Martin Luther King, Jr. 3rd Monday in January Washington’s Birthday 3rd Monday in February Memorial Day Last Monday in May Juneteenth National Independence Day 3rd week in June Independence Day July 4 Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11 Thanksgiving Day 4th Thursday in November Christmas Day December 25
When a holiday falls on a Saturday or Sunday, it is observed on the adjacent Friday or Monday, respectively.
In addition to the holidays listed above, the contractor agrees to the days or closures designated by Federal statute, Executive Order, or Presidential Proclamation.
(End of Section F)
G – Contract Administration Data
DOI-AAAP-0050 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (DEC 2015)
1. FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15. The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report.
Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
2. We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
3. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
4. Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a. Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.
b. Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c. All information provided should be reviewed for accuracy prior to submission.
d. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”
e. Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f. If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the
Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
5. The following guidelines apply concerning your use of the past performance evaluation:
a. Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b. Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
http://www.cpars.gov/ http://www.cpars.gov/
c. Prohibit the use of or reference to evaluation data for advertising, promotional material, pre- award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
6. If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
7. A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (February 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
1. Invoice billed according to contract line items and rates.
2. If a partial payment is billed and the invoice reflects a lump sum, the invoice must include an itemized breakdown and a narrative progress summary outlining the work completed during the billing period.
3. If final payment is billed, the last invoice shall state “FINAL.”
4. Contractor’s Release of Claims shall be submitted with the final invoice.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Section G) http://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov
H – Special Contract Requirements
(End of Section H)
I – Contract Clauses
Clauses by Reference:
The following clauses are hereby incorporated by reference:
52.202-1 Definitions. (JUN 2020)
52.203-3 Gratuities. (JUN 2020)
52.204-13 Limitation on Payments to Influence Certain Federal Transactions. (JUN 2020)
52.204-13 System for Award Management Maintenance. (OCT 2018)
52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014)
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(NOV 2021)
52.212-4 Contract Terms and Conditions - Commercial Products and Commercial Services. (NOV 2023)
52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2024)
52.232-11 Extras. (APR 1984)
52.242-13 Bankruptcy. (JUL 1995)
52.242-15 Stop-Work Order. (AUG 1989)
52.253-1 Computer Generated Forms. (JAN 1991) Clauses in Full Text:
52.204-21 Basic Safeguarding of Covered Contractor Information Systems. (NOV 2021)
(a) Definitions. As used in this clause-
Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public Web sites) or simple transactional information, such as necessary to process payments.
Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).
Safeguarding means measures or controls that are prescribed to protect information systems.
(b) Safeguarding requirements and procedures. (1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external information systems.
(iv) Control information posted or processed on publicly accessible information systems.
(v) Identify information system users, processes acting on behalf of users, or devices.
(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.
(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.
(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.
(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.
(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.
(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.
(xii) Identify, report, and correct information and information system flaws in a timely manner.
(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.
(xiv) Update malicious code protection mechanisms when new releases are available.
(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.
(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.
(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial products or commercial services, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.
52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Products and Commercial Services (Jan 2025) (DEVIATION FEB 2025)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C. 3903 and 10 U.S.C.
3801).
(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[Contracting Officer check as appropriate.]
_X_ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).
(2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509)).
(3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
_X_ (4) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).
_X_ (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).
(6) [Reserved].
_X_ (7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
(8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
X (9) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of Division R of Pub. L. 117- 328).
_X_ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec 2023) ( Pub. L. 115–390, title II).
https://www.acquisition.gov/far/52.203-19#FAR_52_203_19 https://www.acquisition.gov/far/52.204-23#FAR_52_204_23 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.acquisition.gov/far/52.209-10#FAR_52_209_10 https://www.acquisition.gov/far/52.232-40#FAR_52_232_40 https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title10-section3801&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title10-section3801&num=0&edition=prelim https://www.acquisition.gov/far/52.233-3#FAR_52_233_3 https://www.acquisition.gov/far/52.233-4#FAR_52_233_4 https://www.acquisition.gov/far/52.203-6#FAR_52_203_6 https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title10-section4655&num=0&edition=prelim https://www.acquisition.gov/far/52.203-13#FAR_52_203_13 https://www.acquisition.gov/far/52.203-15#FAR_52_203_15 https://www.acquisition.gov/far/52.203-17#FAR_52_203_17 https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title41-section4712&num=0&edition=prelim https://www.acquisition.gov/far/3.900#FAR_3_900 https://www.acquisition.gov/far/52.204-10#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/52.204-14#FAR_52_204_14 https://www.acquisition.gov/far/52.204-15#FAR_52_204_15 https://www.acquisition.gov/far/52.204-27#FAR_52_204_27 https://www.acquisition.gov/far/52.204-28#FAR_52_204_28 https://www.govinfo.gov/link/plaw/115/public/390
_X_ (11) (i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec 2023) ( Pub. L. 115–390, title
II).
(ii) Alternate I (Dec 2023) of 52.204-30.
X (12) 52.209-6, Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Jan 2025) ( 31 U.S.C. 6101 note).
(13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) ( 41 U.S.C. 2313).
(14) [Reserved].
(15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) ( 15 U.S.C. 657a).
(16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
(17) [Reserved]
X (18) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).
(ii) Alternate I (Mar 2020) of 52.219-6.
(19) (i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).
(ii) Alternate I (Mar 2020) of 52.219-7.
_X_ (20) 52.219-8, Utilization of Small Business Concerns (Jan 2025)( 15 U.S.C. 637(d)(2) and (3)).
(21) (i) 52.219-9, Small Business Subcontracting Plan (Jan 2025) ( 15 U.S.C. 637(d)(4)).
(ii) Alternate I (Nov 2016) of 52.219-9.
(iii) Alternate II…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .