This is a Statement of Work for flooring removal and replacement services at Bowdoin National Wildlife Refuge Headquarters Office in Malta, Montana (Contract Number 140FGA26Q0074).
The contractor must remove and dispose of existing carpet and old cove base from approximately 2,485 square feet of first-floor areas (entry area, break room, hallways, conference room, and five offices), then install a complete flooring system consisting of luxury vinyl plank (LVP) flooring with glue-down installation, an acoustical moisture barrier membrane, and 4-inch commercial-grade cove base. The contractor must be Montana State Certified and may propose Evoke brand flooring or equal products that meet or exceed all specified characteristics, including commercial-grade durability equivalent to Evoke's Dukes pattern, comparable plank dimensions and stability, moisture resistance, sound attenuation performance, and proven compatibility between materials. The cove base color will be selected by the Government from standard contractor options. Work must be performed between November 2, 2026 and December 31, 2026, during normal business hours of Monday through Friday, 8:00 a.m. to 4:30 p.m., with the contractor providing emergency contact information. Government acceptance is contingent upon successful completion of all installation tasks and verification that the work meets state and federal codes plus brand-name-or-equal performance requirements. The contractor shall maintain quality control documentation in accordance with industry standards and is strongly encouraged to conduct a site visit prior to bidding to verify measurements and assess installation conditions. Electricity and potable water are available on-site for contractor use.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140FGA26Q0074 MT – Bowdoin NWR Flooring Removal and Replacement –
Brand Name or Equal
8/26/2026
STATEMENT OF WORK
1. General
Purpose/End Application:
Purchase and install new vinyl plank flooring in all areas of the first floor in the Bowdoin National Wildlife Refuge (NWR) office that are currently carpeted. Remove and dispose of old carpet.
Contractor Qualifications:
Montana State Certified Contractor
2. Place of Performance and Period of Performance
2.1 Bowdoin National Wildlife Refuge Headquarters Office, 194 Bowdoin Auto Tour Road, Malta, MT 59538
2.2 Performance Start: November 2, 2026
Performance End: December 31, 2026
2.3 Normal duty hours: Monday through Friday, 8:00 a.m. – 4:30 p.m.
The Contractor shall provide contact information for emergencies.
2.4 Non-duty hours include weeknights, weekends, and Government holidays (New Year’s Day; Martin Luther King Jr.’s Birthday; Washington’s Birthday; Memorial Day;
Juneteenth National Independence Day; Independence Day; Labor Day; Columbus Day; Veteran’s Day; Thanksgiving Day; Christmas Day).
3. Scope
3.1 Work Description
In the entry area, break room, hallways, conference room, and five offices of the Bowdoin NWR Headquarters building, the Contractor shall remove and dispose of all existing carpet and old cove base. The Contractor shall install a new flooring system consisting of luxury vinyl plank (LVP) flooring, an acoustical moisture barrier membrane, and new cove base.
The estimated installation area is approximately 2,485 square feet; however, contractors are strongly encouraged to verify all measurements during a site visit.
3.2 Flooring System Requirements (Brand Name or Equal)
The materials listed below are identified to establish required quality, performance, Brand Name or Equal compatibility, and appearance standards. Contractors may propose Evoke or equal products. “Equal” materials must meet or exceed all characteristics described below and shall be supported by manufacturer specifications in accordance with FAR 52.211-6 (Brand Name or Equal).
Luxury Vinyl Plank Flooring (LVP)
• Glue-down installation type
• Commercial-grade durability equivalent to Evoke’s Dukes pattern
• Comparable plank dimensions, thickness, and stability
• Color and pattern similar in aesthetic appearance to the Dukes pattern
• Must be compatible with the proposed moisture barrier membrane
• When installed over the moisture barrier membrane, shall create a functional floating-floor condition
Acoustical Moisture Barrier Membrane
• Moisture resistance equal to Evoke’s acoustical membrane
• Equivalent sound attenuation performance
• Comparable manufacturer warranty
• Proven compatibility with the proposed LVP product
Cove Base
• 4 inches in height
• Commercial-grade vinyl, rubber, or comparable material
• Color selected by the Government from standard Contractor options
4. Deliverables and/or Delivery Schedule
4.1 Deliverables
The Contractor shall complete the following:
• Removal and disposal of all existing carpet and old cove base in the designated first-floor areas.
• Installation of the flooring system described in Section 3 (brand-name-or-equal LVP flooring, acoustical moisture barrier membrane, and 4-inch cove base).
• Completion of installation in a manner that meets all performance requirements and relevant codes.
4.2 Schedule
Work shall be performed between November 2, 2026 and December 31, 2026.
Normal work hours are Monday through Friday, 8:00 a.m. to 4:30 p.m. The Contractor must provide emergency contact information.
Brand Name or Equal
Contractors are encouraged to schedule a site visit prior to bidding to verify measurements and assess installation conditions.
5. Data Management Plan (DMP) Not applicable.
6. Government-Furnished Equipment / Government-Furnished Information Electricity and potable water are available on-site for Contractor use during performance of work. The Contractor is responsible for supplying any additional utility connections, adapters, or extensions required to safely access these utilities.
7. Evaluation and Acceptance
7.1 Government acceptance is contingent upon successful completion of all tasks listed in Section 4.1 and verification that installation meets state and federal codes, as well as brand-name-or-equal performance requirements.
8. Quality Control / Quality Assurance
8.1 The Contractor shall maintain quality control in accordance with industry standards. QC documentation shall be made available to the agency upon request and may be submitted with the contractor’s proposal.
9. Technical Coordinator
9.1 Primary individual responsible for the final product or service.