This document is a Scope of Work (SOW) for the rehabilitation of the Butler Storage Building at Brown's Park National Wildlife Refuge (NWR) in Maybell, Colorado. The project involves comprehensive upgrades to a 6,000 sq ft, 9-bay cold storage building to enhance functionality, energy efficiency, and safety. Key rehabilitation tasks include replacing and sealing nine bay doors, installing garage door openers, replacing man doors, sealing walls and ceilings with spray foam insulation, replacing wall and roof anchors, installing new LED lighting and ventilation systems, adding yard hydrants, steel bollards, a ridge cap, concrete apron, GFCI outlets, exterior LED flood lights, and updating the propane heater.
Additional improvements comprise installing a utility sink, emergency shower, eye wash station, and a 500-gallon drainage/chemical run-off tank in the cache room. The project also includes re-insulating the cache room, improving surface drainage, and installing emergency lights and gutters with downspouts and snow guards. The comprehensive scope aims to modernize the building to meet current building codes, efficiency standards, and safety requirements, ultimately improving the building's usability and longevity for the Fish and Wildlife Service's operations at the Brown's Park National Wildlife Refuge.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_Amendment_1_0001.pdf | ||
| Sol_140FGA25R0010_Amd_0001.pdf | ||
| Sol_140FGA25R0010.pdf | ||
| Notice_to_Offerors.pdf | ||
| Price_Schedule.pdf | ||
| DOL_Wage_Determination.pdf | ||
| SOW_Browns_Park_NWR.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
FISH AND WILDLIFE SERVICE
Mountain-Prairie Region
IN REPLY REFER TO:
FWS/R6/ MAILING ADDRESS: STREET LOCATION:
Post Office Box 25486 1 Denver Federal Center Denver Federal Center Building 53, Room FW-192 Denver, Colorado 80225 Denver, Colorado 80225
Scope of Work for the Rehabilitation of the Butler Storage Building at Brown's Park NWR
Project #: 24-010
Project Address: Browns Park NWR, Maybell, CO Moffat County
Map Link: https://www.google.com/maps/@40.8646025,-109.0208545,92m/data=!3m1!1e3?entry=ttu
Project Overview:
The rehabilitation of the 6,000 sq ft, 9-bay Butler cold storage building at Brown's Park National Wildlife Refuge aims to enhance the building's functionality, energy efficiency, and safety. The project includes the replacement and sealing of doors, installation of new lighting and ventilation systems, and various other improvements to ensure the building meets current standards.
Project Objectives:
• Conduct a thorough inspection of the building for deficiencies including electrical and mechanical systems.
• Calculate required air exchange for roof turbine fans and exhaust fans.
• Provide specifications and submittals for all necessary materials and equipment to FWS for approval.
• Install new building components as necessary for rehab.
Scope of Work:
1. Bay Doors Replacement and Sealing:
• Replace and seal nine (9) bay doors with side, top, and floor weather seals.
• Five (5) doors: 12’x12’
• Four (4) doors: 10’x12’
2. Garage Door Openers Installation:
• Install garage door openers on all overhead doors
• Alternate: Install garage door chain hoists on overhead doors 1-4.
3. Man Door Replacement:
• Replace two (2) exterior man doors. Include new lever handle and dead bolt hardware.
4. Wall and Ceiling Sealing:
• Seal the walls at the floor and ceiling joints, and all holes and gaps in the metal siding with spray foam insulation and metal patches as necessary.
• Cache room shall have existing insulation removed as necessary to apply new spray foam insulation on all walls and ceiling.
https://www.google.com/maps/@40.8646025,-109.0208545,92m/data=!3m1!1e3?entry=ttu
5. Wall and Roof Anchors Replacement:
• Replace all wall and roof anchors.
6. Lighting Installation:
• Install 24 new 2'x4' LED interior lighting fixtures. (2 per bay, 2 in cache room, 4 in storage area)
7. Ventilation System Installation:
• Determine the appropriate amount and install new turbine roof vents for proper building ventilation.
• Install two turbine exhaust vents.
8. Yard Hydrants Installation:
• Install two (2) yard hydrants (water horses). See map.
9. Steel Bollards Installation:
• Install concrete filled, painted steel bollards at each door (9 doors, shared for 8).
10. Ridge Cap Installation:
• Install a 24-inch metal ridge cap across the entire roof (150’).
11. Concrete Apron Installation:
• Install a new 6” reinforced concrete apron across the south of the building (150’x8’).
12. GFCI Outlets Installation:
• Install 2 exterior GFCI outlets at man doors and inside as necessary.
13. Exterior LED Flood Lights Installation:
• Install two exterior solar LED flood lights with motion sensors and hooded downward. Located at each man door.
14. Propane Heater Update:
• Update the propane heater in the cache room for more efficiency.
15. Utility Sink, Emergency Shower and Eye Wash Station Installation:
• Install in the cache room in accordance with ANSI Z358.1-2014. (location to be determined by project staff)
16. Chemical/Drainage Tank
• Install new 500-gallon drainage/chemical run-off tank. (see map for location)
• Tank shall be plumbed to eye wash station, shower and sink.
• Allow access to tank for liquid removal
17. Cache Room Insulation and Sealing
• Remove and re-insulate and seal the cache room walls and ceiling.
• Cache room bay door shall be insulated
18. Drainage System Improvement:
• Redo surface drainage on the north side of the structure to redirect water away.
19. Emergency Lights Installation:
• Install new emergency lights at two (2) man door exits.
20. Gutters, Downspouts and Snow Guard Installation:
• Install gutters and downspouts on the north and south sides of the building.
• Add snow guards to roof on North and South Sides.
Conclusion:
This comprehensive scope of work ensures that the Butler storage building at Brown's Park National Wildlife Refuge will be rehabilitated to meet modern building codes, standards of efficiency, safety, and functionality. The project will enhance the building's usability and longevity, providing a better environment for its intended purposes.
END OF DOCUMENT
mlemieux Line mlemieux Text Box
BLM LAND
mlemieux PolyLine mlemieux Callout
NEW HOLDING TANK LOCATION
mlemieux Callout
NEW WATER LINE
mlemieux Callout
HYDRANT LOCATION
mlemieux Text Box
BROWNS PARK BUTLER BUILDING AERIAL
mlemieux Text Box
BUTLER BUILDING
1 2 3 4 5 6 7 7 8 9654
| Browns Park Butler Building SOW 4-2.pdf |
| Butler Aerial.pdf |
| Browns Park Butler Building SOW_UPDATED.pdf |
| Browns Park Butler Building SOW_Final.pdf |
| Browns Park Photo Album.pdf |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
File details come from the government source that posted it. Updated .