This document is an amendment to Solicitation 140FGA24R0022 for the KS QUIVIRA NWR RATTLESNAKE BRIDGE REHAB project. The purpose of the amendment is to answer an RFI and extend the response due date.
The key details are:
- The solicitation will allow replacing the existing timber superstructure with an engineered steel superstructure, including steel beams, steel decking, and an AB-3 surface. The existing timber wingwalls do not need to be replaced.
- The guard rail end section should be replaced with the same design.
- The revised proposal due date is 12:00 PM EST on Tuesday, August 14, 2024. The proposal acceptance period is 60 days.
- Site visits can be coordinated by contacting Mike Oldham at mike_oldham@fws.gov.
- All other terms and conditions remain the same, with a period of performance from 09/02/2024 to 07/14/2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FGA24R0022_Amd_0001.pdf | ||
| Provisions___Clauses_v2_0001.pdf | ||
| Wage_Determination.pdf | ||
| REHAB_RATTLESNAKE_BRIDGE_Specs.pdf | ||
| PROVISIONS_AND_CLAUSES.pdf | ||
| Sol_140FGA24R0022.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140FGA24R0022
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
FGA
Falls Church VA 22041 5275 Leesburg Pike
FWS, GAOA
FWS GAOA
07/08/20240002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/08/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to answer the RFI and extend the response date.
1. After looking at the structure, we were going to propose replacing the existing timber superstructure with an engineered steel superstructure, which would include steel beams, steel decking and an AB-3 surface. Would this be acceptable?
Yes, this would be acceptable
2. This structure has existing timber wingwalls, are these going to be replaced? If so, we would propose replacing them with light gauge sheet pile.
The wing walls do not need to be replaced
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Channel Pedersen
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140FGA24R0022/0002
3. With the guardrail being replaced, would there need to be a specific type of end section that would need to be installed?
Replace End Section with same design
All other terms and conditions remain the same.
Period of Performance: 09/02/2024 to 07/14/2025
Site Visit
Please reach out to Mike Oldham directly to coordinate site visits mike_oldham@fws.gov.
Questions Due Date: 12:00 PM CT Wednesday, July
24, 2024
Response Due Date: 12:00 PM EST Tuesday, August
14, 2024
Proposal Acceptance Period: Must be valid for 60 days
Submit all questions in writing to
Channel_Pedersen@fws.gov
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .