This is a Statement of Work for a commercial service project involving bat remediation at the Creston National Fish Hatchery in Kalispell, Montana (PR Number: 0044062578). The project aims to provide a safe and healthy workspace and visitor experience by sealing all openings that allow bat entry into the approximately 6,100-square-foot, two-story fish production building. Bats have repeatedly roosted in the upper office and storage spaces, leaving guano and urine that create health hazards. The work is scheduled for January 11, 2027 through March 19, 2027, with normal duty hours Monday through Friday from 8:00 a.m. to 4:30 p.m. The contractor must be appropriately licensed, accredited, and certified in Montana for humane bat removal and bat remediation, including proper cleanup and disposal of hazardous waste and sanitation/disinfection services.
The contractor shall provide all necessary personnel, equipment, supplies, facilities, transportation, tools, materials, and supervision to identify and seal all bat entry points, conduct a final inspection, and provide written warranty documentation. The project explicitly excludes cleanup, insulation work, disinfection, hazardous material abatement, interior repair, major carpentry, and roof replacement. The Government will award a firm-fixed-price contract, meaning the price is not subject to adjustment based on contractor experience. Site visits are strongly encouraged prior to quotation submission. The U.S. Fish and Wildlife Service will inspect and accept the work in accordance with FAR 52.212-4(a) through its Contracting Officer's Representative, with acceptance contingent upon designated representatives determining the work acceptable and in good working order. The Government will provide restrooms, electricity, and water. Primary technical contact is Travis Slivka, Hatchery Manager at (406) 758-6884, with secondary contact Kristopher Johnson, Facility Management Coordinator, at 435-299-5150.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B03_-_Service_Contract_Act_WD___2015-5401_-_Rev_30.pdf | ||
| Sol_140FF027Q0104.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Commercial Service
Hatchery Building Bat Remediation
PR Number: 0044062578
1. General:
1.1 Creston National Fish Hatchery (NFH), 780 Creston Hatchery Road, Kalispell, MT 59901- 8239. Service, Rehabilitate Hatchery Building, Bat Remediation.
1.2 Purpose/End Application: This purpose of this project is to provide a safe and healthy workspace and visitor experience within the Hatchery Building. In 2024, there was a bat remediation project that installed one way exits, allowing the bats to freely exit the building, but prevented them from re-entry at that location. Bats, once again, have been roosting within the upper office and storage space leaving guano and urine, creating a major health hazard. The bats are currently out of the space for the winter, so this would be a good time to complete sealing the entry points.
1.3 Contractor Qualifications: The contractor shall be appropriately licensed, accredited, and certified within the state of Montana for the humane removal of bats and bat remediation, to include, but not limited to: proper cleanup and disposal of hazardous waste, and sanitation/disinfection of the area.
1.4 Other: The contractor must follow all associated regulations and laws including: Federal, State, and County.
2. Place of Performance and Period of Performance
2.1 Work is to be performed at Creston National Fish Hatchery (NFH), 780 Creston Hatchery Road, Kalispell, MT 59901-8239.
2.2 Period of Performance: January 11, 2027 through March 19, 2027.
2.3 Normal duty hours Monday thru Friday 8:00 a.m. - 4:30 p.m. In the event of emergencies, Contractor shall provide contact information.
2.4 Non-duty hours include week nights, weekends, and Government holidays (New Year’s Day, Martin Luther King JR.s’s Birthday, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day).
3. Scope
3.1 The contractor shall provide all necessary personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform the services herein. The contractor shall identify and seal all openings that could allow bat entry into the approximately 6,100-square-foot, two-story fish production building. The contractor shall conduct final inspection and provide written warranty documentation.
3.2 Exclusions
• This project does not include cleanup, insulation work, disinfection, hazardous material abatement, interior repair, major carpentry, or roof replacement.
3.3. Any proposed changes shall be addressed directly with the Contracting Officer and technical points of contact in Section 9 of this Statement of Work.
3.2 Site Vists: Interested parties are strongly encouraged to conduct a site visit prior to submitting a quotation for this project. Site visits may be scheduled with the technical points of contact in Section 9 of this Statement of Work. The Government will award a firm-fixed-price contract as a result of this request for quote. A firm-fixed price contract provides for a price that is not subject to any adjustment on the basis of the contractor’s experience in performing the contract.
4. Deliverables and/or Delivery Schedule:
4.1 The contractor shall identify and seal all openings that could allow bat entry into the approximately 6,100-square-foot, two-story fish production building.
4.2 The contractor shall conduct final inspection and provide written warranty documentation.
5. Data Management Plan (DMP) N/A
6. Government-Furnished Equipment (GFE) / Government-Furnished Information
(GFI)
6.1 Creston NFH will provide restrooms, electricity, and water for the contractor to using while the contracted work is being completed.
6.2 Identify any limitations. N/A
7. Evaluation and Acceptance
7.1 The contractor will be evaluated as detailed herein. Inspection and acceptance will be carried out in accordance with FAR 52.212-4(a) by the USFWS Contracting Officer’s Representative (COR) or an authorized designee. Government acceptance is contingent upon:
designated U.S. Fish and Wildlife Service representative(s) determining the work to be acceptable and in good working order.
8. Quality Control/Quality Assurance:
8.1 Inspection and acceptance will be carried out in accordance with FAR 52.212-4(a) by the USFWS Contracting Officer’s Representative (COR) or an authorized designee. Where appropriate, QC will be maintained according to industry standards and made available to the agency with the contractor’s proposal.
9. Technical Coordinator(s):
9.1 Primary individual responsible for the final service.
Travis Slivka Hatchery Manager 780 Creston Hatchery Road, Kalispell, MT 59901-8239 Office: (406) 758-6884 travis_slivka@fws.gov
9.2 Secondary individual responsible for the final service.
Kristopher “Kris” Johnson Facility Management Coordinator (FMC) Asset Management Coordinator (AMC) U.S. Fish and Wildlife Service Fish and Aquatic Conservation (FAC) 1380 South 2350 West Vernal, UT 84078 Cell: 435-299-5150 Office: 435-789-0351 ext. 16 kristopher_b_johnson@fws.gov http://?
http://?
| STATEMENT OF WORK |
| 1. General: |
| 2. Place of Performance and Period of Performance |
| 2.1 Work is to be performed at Creston National Fish Hatchery (NFH), 780 Creston Hatchery Road, Kalispell, MT 59901-8239. |
| 2.2 This project needs to be completed prior to April 15, 2027, due to the potential of bats migrating back into the building. |
| 2.3 Normal duty hours Monday thru Friday 8:00 a.m. - 4:30 p.m. In the event of emergencies, Contractor shall provide contact information. |
| 2.4 Non-duty hours include week nights, weekends, and Government holidays (New Year’s Day, Martin Luther King JR.s’s Birthday, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day). |
| 3. Scope |
| 4. Deliverables and/or Delivery Schedule: |