This is a Performance Work Statement (PWS) for the treatment of invasive plants on the Everglades Headwaters National Wildlife Refuge Okeechobee Unit in Okeechobee County, Florida.

The contract requires the contractor to treat 100% of Brazilian pepper (Schinus terebinthifolia) and Japanese/Old World fern (Lygodium) infestations across approximately 70 acres, achieving a 95% control rate one month post-completion. The project area consists of a 150-foot swath from the Kissimmee Prairie Preserve State Park boundary along Starvation Creek and a 100-foot swath centered on Hammock Creek (50 feet on either side). The contractor must supply all labor, equipment, materials, and supplies, with no water or chemical storage available on-site. Work shall be conducted during regular hours (sunrise to sunset, any day of the week) except Federal holidays and quota hunts, with a 30-day completion requirement once work begins. The contractor must provide GIS track maps showing cumulative movements of all personnel to verify complete site coverage. Non-target damage must be minimized, and all herbicide use must comply with industry standards and label requirements. Chemicals cannot be stored on-site and must be properly disposed of; ATVs, UTVs, and light trucks are permitted. The period of performance extends from contract award through September 30, 2027. The government will award a Firm Fixed Price Contract and will conduct 100% inspection with surveillance focused on site surveys and contractor-provided GIS track maps. The U.S. Fish and Wildlife Service is the federal agency involved. A Contract Manager and alternate must be designated, available between 8:00 AM and 4:00 PM ET Monday through Friday. Payment will be based on acceptance of GIS track maps and government inspection confirming 100% treatment and 95% control rate achievement.

View the file

Other files

File Type Posted
Sol_140FF027Q0084.pdf PDF
Attachment_3-_SCA_Wage_Determination.pdf PDF
Attachment_4-_Past_Performance_Data_Document.docx DOCX document
Attachment_2-Quote_Schedule.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

Treatment of Invasive Plants on Everglades Headwaters National Wildlife Refuge Okeechobee Unit Okeechobee County, Florida

PART 1 GENERAL INFORMATION

INTRODUCTION

Invasive Brazilian pepper (Schinus terebinthifolia) and Japanese/Old World fern (Lygodium) on Everglades Headwaters National Wildlife Refuge (Refuge) Okeechobee Unit need to be controlled. These non-native plants infest native habitats and make areas less suitable for wildlife. The project boundary consists of the areas along Starvation Creek and Hammock Creek, which is approximately 70 acres (see Project Area Map).

Project Area Map

SCOPE

The project consists specifically of supplying all labor, equipment, materials and supplies necessary for treating the invasive plant species as identified under the following Tasks:

Task 1: Treat 100% of all Brazilian pepper with 95% control rate.

Task 2: Treat 100% of all Lygodium with 95% control rate.

Contractor will provide a GIS tracks map upon completion of the work. This map will show the cumulative movements of all contractor personnel on the site and is used by the government to determine if the contractor adequately covered the entire site.

SITE INFORMATION

Project area The project area consists of two sites:

• 150 ft swath from the Kissimmee Prairie Preserve State Park (KPPSP) boundary along Starvation Creek. The KPPSP boundary is marked with brown signs.

• 100 ft swath centered on Hammock Creek (50 ft on either side of the creek) Refer to the project area map on page for the extent of the project area. A GIS shapefile of the project area will be provided to the awarded contractor. Directions to the site are shown on the Access Map.

Non-native Plant Species Targeted The Brazilian pepper and Lygodium infestations are scattered across the 70 acres, primarily along Starvation Creek and Hammock Creek. The total acres covered by the invasive plants is less than two acres. This is only an estimate, and it is up to the vendor to establish a more accurate infestation level during the solicitation process.

Protected Species The contractor must work in such a manner as to avoid disturbance or harm to the following protected species are present on the Refuge: wood stork (Mycteria americana) and gopher tortoise (Gopherus polyphemus). There are no protected plant species within the project area.

Available Resources There is no water or chemical storage available on site. Vehicles, including off-road, and equipment and supplies may be left on-site at the contractor’s risk. There is no secure storage available, but contractor-provided shipping container(s) may be used for the duration of the contract and will need to be removed at the end of the POP.

WORK SPECIFICATIONS

Contractor shall treat 100% of the non-native plants listed and achieve 95% control rate one month post completion. GIS shapefiles of tracks are required. Non-target damage will be kept at a minimum, and applicable herbicide(s) and use will be per industry standards and label requirements.

Chemicals cannot be stored on-site, and proper disposal methods will be required. ATVs, UTVs and light trucks can be used anywhere.

Work shall only be conducted during regular work hours (sunrise to sunset, any day of the week. No work on Federal holidays. There shall be no work conducted during quota hunts. Operations can be conducted during small game (non-quota) hunts at the contractor’s discretion. The Refuge will provide a schedule showing when hunts are conducted.

All materials, supplies, and equipment must be provided by contractor. Some areas are locked;

contractor will be provided lock combinations. Contractor should convey planned site work days to manager. Contractor needs to complete project in 30 days once work begins.

Access Map

PERIOD OF PERFORMANCE:

The period of performance shall be Contract award – September 30, 2027.

QUALITY ASSURANCE:

The government shall evaluate the contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). (Attachment 2: QASP)

HOURS OF OPERATION:

The contractor is responsible for conducting business between sunrise and sundown, seven days a week, except when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.

PLACE OF PERFORMANCE:

Brazilian pepper and Lygodium treatment work will be located at the Refuge. Comments/reports will be provided to the COR.

INSPECTION AND ACCEPTANCE:

The work shall be accepted when work is completed as described here within and in accordance with the specifications. Comments, recommendations, and/or reports must be submitted according to the schedule established by the COR. The contractor must work closely with the COR to ensure deadlines are met. Work will be inspected to assure compliance with the contract documents. However, quality control and adherence to all contract requirements is still the responsibility of the contractor. Schedule of payments will be based on acceptance of GIS track maps and government inspection of site to determine if 100% treatment and 95% control rate of Brazilian pepper and Lygodium was achieved based on the tasks outlined in the scope.

Type of Contract: The government will award a Firm Fixed Price Contract.

Security Requirements: Not Applicable.

Physical security: Not Applicable.

Key Control: Government to provide gate access post-award.

Periodic Progress Meetings /Post Award Conference: Not required.

Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications;

monitor Contractor’s performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property; and, provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

Key Personnel: The follow personnel are considered key personnel by the government:

The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 AM and 4:00 PM ET, Monday thru Friday, except when the government facility is closed for administrative reasons.

Identification of Contractor Employees: All contract personnel working onsite where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of the public that they are government officials. They must also ensure that all document or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

PART 2. DEFINITIONS AND ACRONYMS

PART 3. GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

Services: The Government will provide no services.

Facilities: The Government will provide access to the Refuge proper where all field work shall take place.

Utilities: The Government will not provide any utilities in the field.

Equipment: The Government will provide no equipment.

Materials: The Government will provide a shapefile of the project area to the Contractor.

PART 4. CONTRACTOR FURNISHED ITEMS AND SERVICES

General: The Contractor shall furnish all labor and services required to perform work under this PWS.

Secret Facility: Clearance: Not Applicable.

Labor and Materials: None

Equipment: Not Applicable

PART 5. SPECIFIC TASKS

Basic Services: The Contractor shall provide the necessary labor materials and supplies to conduct the scope of the contract safely.

PART 6. APPLICABLE PUBLICATIONS {CURRENT EDITIONS) N/A

The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures, FAR (Federal Acquisition Regulations) and DOI (Department of the Interior) Local Clauses.

PART 7. ATTACHMENT LIST

Attachment 1: Performance Requirements Summary (PRS)

Attachment 2: Quality Assurance Plan

ATTACHMENT 1 Performance Requirements Summary (PRS)

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Tasks

Performance Standard

Acceptable

Quality Level

(AQL)

Surveillance Method

Positive/Negative Incentive for Meeting/Not

Meeting Performance

Standards Task 1 Treat Brazilian pepper

Contractor shall complete PWS Task 1 within one year of award date.

100% of Brazilian pepper shall be treated at 95% control rate.

Site survey and contractor-provided GIS tracks map.

Non-compliance with work schedules will result in negative performance rating

Task 1 Treat Lygodium

Contractor shall complete PWS Task 1 within one year of award date.

100% of Lygodium shall be treated at 95% control rate.

Site survey and contractor-provided GIS tracks map.

Non-compliance with work schedules will result in negative performance rating

Attachment 2: QUALITY ASSURANCE PLAN

Treatment of non-native woody invasive plants on Everglades Headwaters National Wildlife Refuge Okeechobee County, Florida.

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

• What will be monitored

• How monitoring will take place

• Who will conduct the monitoring

• How monitoring efforts and results will be documented

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government's responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur. This QASP is a "living document" and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities. FAR & DOI Local Clauses apply to this contract.

2. GOVERMENT ROLES AND RESPONSIBILITIES:

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) -The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor's performance.

Assigned Contracting Officer:

Organization or Agency: U.S. Fish and Wildlife Service Telephone:

Email

b. Contracting Officer Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor's performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the CO, the COR shall provide documentation to the CO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government's behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the CO for action.

Assigned COR:

Email:

3. CONTRACTOR REPRESENTATIVES:

The following employees of the contractor serve as the contractor's Program Manager and Task Manager for this contract.

Contractor:

Contractor's Representative:

4. REQUIREMENTS & ACCEPTABLE QUALITY LEVELS:

a. The contractor shall work with COR to schedule times of surveys.

b. The contractor shall provide operational oversight of the activities taking place on the Refuge in coordination with the Service.

c. The contractor shall provide GIS track maps to the Service.

d. The contractor shall furnish all labor, supplies, transportation, lodging and materials for the project.

5. PERFORMANCE STANDARDS

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards. The Performance Requirements Summary includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level

(AQL).

6. METHODS OF QUALITY ASSURANCE (QA) SURVEILLANCE:

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

Regardless of the surveillance method, the COR shall always contact the contractor when a defect is identified and inform the manager of the specifics of the problem. The COR shall be responsible for monitoring the contractor's performance in meeting a specific performance standard/ AQL.

a. 100% INSPECTION

Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause in the Contract becomes the basis for the CO's actions.

7. RATINGS:

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

EXCEPTIONAL: Performance significantly exceeds contract requirements to the Government's benefit.

SATISFACTORY: Performance meets contractual requirements.

UNSATISFACTORY: Performance does not meet contractual requirements.

8. DOCUMENTING PERFORMANCE:

a. ACCEPTABLE PERFORMANCE The Government shall document positive performance. Any report may become a part of the supporting documentation for fixed fee payments, award fee payments, or other actions.

b. UNACCEPTABLE PERFORMANCE When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case, the COR shall document the discussion and place it in the COR's file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other actions deemed necessary by the CO.

9. FREQUENCY OF MEASUREMENT:

a. Frequency of Measurement During contract performance, the COR shall measure performance at the time of delivery and throughout the life of the contract as specified in the Performance Requirements Summary.

PERFORMANCE WORK STATEMENT
ATTACHMENT 1 Performance Requirements Summary (PRS)
Attachment 2: QUALITY ASSURANCE PLAN