Attachment_1_-_SOW_jet_boat_motor_20260910.pdf
PDF 71 KB Posted
- Attached to
- MS-MISSISSIPPI ESFO-JET BOAT
- Solicitation number
- 140FF027Q0029
- Issued by
- Not on record
About this file
Statement of Work Summary
This is a Statement of Work (SOW) issued by the U.S. Fish and Wildlife Service, Mississippi Ecological Services Field Office, for the purchase and installation of a new 65-horsepower jet boat motor on an existing 1760 GameChanger vessel. The contractor shall furnish one new 65 HP four-stroke outboard motor with electric start and electric trim, raise the vessel's transom to the required height for motor installation, and install the motor to the vessel. The contractor must also provide the operator manual and manufacturer warranties. The vessel will be used to transport personnel, equipment, and supplies for wildlife recovery and management activities on shallow rivers. The contractor is responsible for furnishing all labor, materials, and equipment; delivering a fully operational vessel; ensuring compliance with U.S. Coast Guard regulations; and coordinating pickup with the Mississippi Ecological Services Field Office. The period of performance is 120 calendar days after contract award.
Acceptance will be based on compliance with all specifications, proper engine and motor operation, and delivery of all manuals, warranty documentation, and titles/MSOs. The Government will conduct an inspection upon pickup and process payment in accordance with contract terms. Award will be made to the responsible contractor offering the best value considering technical compliance, delivery schedule, warranty provisions, past performance, and price. The vessel must comply with U.S. Coast Guard safety regulations and all applicable Federal, State of Mississippi, and local regulations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Purchase of New Jet Boat Motor U.S. Department of the Interior U.S. Fish and Wildlife Service Mississippi Ecological Services Field Office
1. Purpose
The U.S. Fish and Wildlife Service requires the purchase and installation of one (1) new 65 horsepower jet boat motor with tiller to support recovery and management actions for at-risk and listed species. Additionally, the transom on the existing 1760 GameChanger vessel at the Mississippi ES Field Office will likely need to be raised to meet the necessary transom height required for installation of the new motor. The vessel will be used primarily on shallow rivers to transport personnel, equipment, and supplies necessary for field work associated with wildlife recovery and management activities.
2. Scope
The contractor shall furnish one new 65 horsepower jet boat motor, raise the 1760 GameChanger vessel’s transom to the required transom height, and install the jet boat motor to the vessel. The contractor will also provide the operator manual and manufacturer warranties for the jet boat motor.
3. Minimum Technical Requirements
Jet Boat Motor
• 65 horsepower motor
• Four-stroke outboard
• Electric start
• Electric trim
Boat modifications (existing vessel at MS Field Office)
• Raise transom height to the required height necessary for installation of the jet boat motor.
Fuel System
• N/A
Electrical
Attachment 1
• N/A
Trailer
• N/A
4. Required Accessories
• N/A
5. Delivery
The U.S. Fish and Wildlife Service Mississippi Ecological Services Field Office will pick up the jet boat motor after it has been installed on the existing 1760 GameChanger vessel.
6. Inspection and Acceptance
Government personnel will inspect the vessel upon pickup.
Acceptance will be based on:
• Compliance with all specifications
• Proper operation of engine and controls
• Delivery of all manuals, warranty documentation, and titles/MSOs
Any deficiencies identified shall be corrected by the contractor prior to final acceptance.
7. Warranty
The contractor shall provide:
• Manufacturer's engine warranty
• Warranty documentation at pickup
8. Contractor Responsibilities
The contractor shall:
• Furnish all labor, materials, and equipment.
• Deliver a fully operational vessel.
• Ensure compliance with all applicable U.S. Coast Guard regulations.
• Coordinate pickup with the Mississippi Ecological Services Field Office.
9. Government Responsibilities
The Government will:
• Inspect the vessel.
• Accept the vessel upon satisfactory completion.
• Process payment in accordance with contract terms.
10. Period of Performance
The contractor shall raise the vessel’s transom height and install new motor within 120 calendar days after contract award unless otherwise specified.
11. Applicable Standards
The vessel shall comply with:
• U.S. Coast Guard safety regulations
• All applicable Federal, State of Mississippi, and local regulations
12. Basis for Award
Award will be made to the responsible contractor offering the best value to the Government, considering:
• Technical compliance
• Delivery schedule
• Warranty
• Past performance
• Price
File details come from the government source that posted it. Updated .