This is Amendment 0001 to Solicitation 140FC326Q0015, issued by the U.S. Fish and Wildlife Service (FWS), Construction A/E Team 3, with an effective date of February 26, 2026. The solicitation seeks replacement of a sewage pump vault at Merced National Wildlife Refuge in California. The project involves abandonment of an existing unsafe in-ground sewage pump vault and installation of a new above-grade sewage pump vault and pumping system to improve safety and operational reliability. The work is a brand-new project with a project magnitude less than $25,000. The period of performance is April 6, 2026 to August 15, 2026. The contracting officer is Shannon Barnhill (shannon_barnhill@fws.gov). A mandatory site visit was scheduled for March 12, 2026 at 9:00 AM PST, with a questions deadline of March 16, 2026 by 4:00 PM MDT and proposals due March 30, 2026 by 4:00 PM MDT.
The amendment provides responses to twelve contractor inquiries and includes photographs of the existing deteriorated vault conditions. Key specifications and requirements clarified include: the vault should be designed for wastewater applications with approximately 500-gallon capacity; a single ½ horsepower pump system mounted directly on the vault base; a high-level audible and visible alarm system (no telemetry or remote notification required); approximately 18-28 inch invert depth from the house; approximately 35-50 feet distance to septic leach field with 2-3 feet elevation change; 200-amp electrical panel; contractor responsibility for field verification and total dynamic head calculations; use of existing electrical infrastructure with code-compliant connections; and provision of temporary bypass pumping if service maintenance is necessary during construction. The site visit sign-in sheet shows one contractor (Living Water Initiatives LLC, contact: Tanner Terrell) attended the mandatory site visit.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140FC326Q0015.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Shannon Barnhill
See continuation page
FWS Constr A/E 3 FWS, Construction A/E Team 3 5275 Leesburg Pike Falls Church VA 22041
FC3
140FC326Q0015
02/26/2026
02/26/2026
1 12
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140FC326Q0015/0001
Replacement of Sewage Pump Vault in accordance with the attached Statement of Work.
Project Magnitude: less than $25,000.00.
Please refer to 52.236-27 - Site Visit for the
Site Visit details. Contractors are required to
RSVP to the Contracting Officer.
The purpose of this amendment is to provide the following:
1) Responses to questions received.
2) The site visit sign in sheet.
All other terms and conditions remain unchanged.
Period of Performance: 04/06/2026 to
08/15/2026
Points of Contact:
Contractor:
TBD
Contracting Officer Representative (COR):
TBD
Contracting Officer:
Shannon Barnhill shannon_barnhill@fws.gov
Questions and Responses Question1: Is there any incumbent/recompete or is this a brand-new project? If yes, could you please provide us with their award number or even if the customer bought similar services in the past.
Response: This project is considered a brand-new project. The work involves the abandonment of an existing unsafe sewage pump vault and the installation of a new above-grade sewage pump vault and pumping system at Merced National Wildlife Refuge to improve safety and operational reliability.
Question 2: Are there any existing photos of the site and vault that you can share?
Visual reference would help us better assess access, layout, and overall conditions.
Response:
Question 3: Additionally, could you provide the specifications for the following:
1) Vault
Response: Currently presume cast iron or different type of metal made. Dilapidated and in need of replacement
2) Pump
Response: ½ horsepower pump
3) Alarm system
Response: Currently there are no alarm systems for the current vault pump
4) Electrical panel
Response: 200 Amp panel
Question 4: Regarding the pump installation, can you confirm whether the pump is mounted on guide rails, suspended, or set directly on the base of the vault?
Response: It is set directly on the base of the vault
Question 5: Do we know the invert depth of the pipe entering the vault from the house?
Response: Approximately 18 to 28 inches.
Question 6: Is there going to be an emergency bypass line in case the house loses power and the vault fills up? If so, how will that be designed?
Response: It only requires installation of a pump, float system, and high-level audible/visible alarm.
In the event of power loss, the system relies on storage capacity within the vault and the high-level alarm to alert personnel.
Question 7: Do we know the elevation change and distance from the pump vault to the septic leach field? This information is needed to calculate the total dynamic head
(TDH).
Response: The Contractor is responsible for field verification and determining TDH as part of their installation and equipment selection. The distance to the septic leach is approximately 35 -50 feet and elevation change is approximately 2-3 feet.
Question 8: Do we know the storage requirement for the pump vault in gallons?
Response: The Contractor is expected to furnish a vault “designed for wastewater applications” and compliant with safety and operational needs, the current pump vault capacity site at 500 gallons.
Question 9: Do we know if we are going with a duplex pump station or single pump station?
Response: This is single pump system, Question 10: Are we trenching new power and conduit back to the main house panel?
Response: The contractor may use existing electrical infrastructure. The Contractor should assume responsibility for providing a complete and code-compliant electrical connection.
Question 11: Will the contractor be responsible for bypass pumping during construction while the existing vault is abandoned? It appears that the existing pump station is already not functioning.
Response: If maintaining service will be necessary, the Contractor will provide temporary bypass pumping
Question 12: Are there any requirements for telemetry, autodialer, or remote alarm notification for the pump station?
Response: Only requires:
• Audible alarm
• Visible alarm
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
| B09 Amendment 0001 Questions and Responses |
| B12 Site Visit Sign In Sheet |