This document is an amendment to a solicitation for a federal contract opportunity. The purpose of this amendment is to provide answers to questions received regarding the solicitation.
The solicitation is for a construction contract for a warehouse facility with the Fish and Wildlife Service. The construction magnitude is between $250,000 and $500,000. The key details are that the building must have an interior bay depth of at least 39 feet to accommodate a specific boat and trailer, and the width must be sufficient to fit 3 ten-foot wide bay doors and 1 twelve-foot wide bay door. A wood-framed building with metal roofing and siding is acceptable, as the Fish and Wildlife Service is looking for the lowest cost solution. The period of performance is August 1, 2024 to June 30, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FC324R0012_Amd_0002.pdf | ||
| Sol_140FC324R0012.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140FC324R0012
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
FC3
Falls Church VA 22041 5275 Leesburg Pike FWS, Construction A/E Team 3 FWS, Construction A/E Team 3
FC3
Falls Church VA 22041 5275 Leesburg Pike FWS, Construction A/E Team 3 FWS Constr A/E 3
05/24/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/24/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The magnitude of construction is between $250,000.00 and $500,000.00.
LIST OF CHANGES:
The purpose of this amendment is to provide answers to questions received.
All other terms and conditions remain the same
Period of Performance: 08/01/2024 to 06/30/2025
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Anthony Kuntz
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Sand Lake Warehouse
Questions and Answers
1. Are the drawings conceptual?
Answer: Yes, Drawings are purely a conceptual effort.
2. Is a wood framed building with metal roofing and siding acceptable?
Answer: Yes, FWS is looking for the lowest cost to the government in this contract. The design documents allowed for fabricated structural steel, pre-engineered metal construction, and wood framed with metal roofing and siding. Internal structural columns are acceptable but are to be placed in alignment with the spaces between the bay doors to prevent obstructing the bay spaces. If there is a beam it must not be hung lower than 12’ to avoid obstructing the height of the 12’x12’ bay door, as that is sized for a specific boat and trailer to be backed into this area.
3. The drawings show an inside building depth of 36 feet. Is this correct?
Answer: The inside building depth needs to be a 39’ minimum to accommodate a specific boat and trailer. Page 4 of the drawings called for a 40’ inside minimum but if there is a reason that this cannot be met, 39’ inside bay depth will work.
4. The outline specs call for 40 foot deep bay size. Will the FWS accept a wood framed building that would be 36ft X 100ft outside dimensions with interior dimensions of 35ft X 99ft?
Answer: FWS will accept a wood framed building, however the interior bay depth must be 39’ deep to accommodate our boat and trailer. Also I believe the width of the building was estimated to be 54’ to accommodate the 4 bay doors. The width of the building can vary (to save cost) but the width must accommodate 3x10’ wide bay doors and 1x12’ wide bay door.