B12_FC323Q0051_Questions_and_Answers_8_25_23_0002.pdf
PDF 80 KB Posted
- Attached to
- WA-TURNBULL NWR-FENCE CONSTRUCTION
- Solicitation number
- 140FC323Q0051
About this file
This document contains questions and answers regarding solicitation number 140FC323Q0051 from the Department of the Interior Fish and Wildlife Service for fence construction work at the Turnbull National Wildlife Refuge in Washington. The questions and answers provide clarification on removing and disposing of old fence materials, simplifying the bid schedule to a price per foot for the entire project, and confirming fence braces should be made of wood. Bids are due by September 7, 2023 at 5:00PM Pacific Time and the statement of work and bid schedule were revised in Amendment 2. The opportunity is for fence construction services at the Turnbull National Wildlife Refuge.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140FC323Q0051
Turnbull National Wildlife Refuge
Construction of Barbed Wire Fence Questions & Answers
08/25/2023
1) When repairing the fence of wire or posts should the old wire or posts be removed from the field?
What should be done with it? Is the contractor responsible to disposal?
Answer: Yes, all old materials should be removed from the field can be dropped at the Turnbull NWR shop. Turnbull NWR will then take care of recycling or disposal of the old materials. Statement of Work has included this under Section Scope 3.3. It was also in red letters.
2) Request for bid schedule to be simplified with a price per foot pricing for the whole job.
Answer: It was determined that this method is acceptable of price per foot for the whole job instead of breaking it down in units. A revised Bid Schedule now reflects price per foot for the whole job for the fence project.
3) Are Braces to be made out of wood or steel?
Answer: Wood
3) The revised SOW & Bid Schedule are attached to the amendment 2.
4) The response due date remains the same 09/07/2023, 5:00PM (PDT).