A04_SOW.pdf

PDF 170 KB Posted

Attached to
TX-BALC CANYONLDS NWR-MARTIN HSE DEMOLIT
Solicitation number
140FC225Q0016
Issued by

About this file

This Statement of Work (SOW) details a demolition contract for the Balcones Canyonlands National Wildlife Refuge in Marble Falls, Texas. The project involves completely demolishing a two-story, single-family house built in 1982, which measures 2,655 sq. ft. with a limestone veneer exterior and chimney. The contractor will be responsible for demolishing the entire building structure, concrete foundation, and footings, and removing all demolition materials off-site for proper disposal. Additionally, the contractor must cut and cap the existing water and sewer services, with the site intended for future construction of shared housing units for seasonal employees.

The contract requires the contractor to be licensed in accordance with Texas state requirements and will have a performance period of 30 days from the contract start date. Work is to be performed Monday through Friday from 8:00 a.m. to 4:30 p.m., with the final deliverable being a clean building site. The Technical Coordinator, Cixto Saucedo, will oversee the project and be available on-site for guidance. Government acceptance is contingent upon completion of demolition and a final walk-through inspection by an authorized government representative, with quality control to be maintained according to industry standards.

View the file

Other files

File Type Posted
B03_Wage_Determination.pdf PDF
Sol_140FC225Q0016.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (2025 02 19)

NAICS 238910 - Building demolition

Martin House Demolition, Balcones Canyonlands NWR, TX

1. General:

1.1 The Balcones Canyonlands National Wildlife Refuge (Refuge), located at 24518 E FM 1431, Marble Falls, TX 78654-4096, is seeking a contract for building demolition (NAICS 238910). The building to be demolished is a two-story, single-family house referred to as the Martin House. The house was built in 1982 and is 2,655 sq. ft. with a limestone veneer exterior and chimney. The work in this contract will include demolishing the house and its concrete foundation, cutting and capping the water and sewer services, and hauling off and properly disposing of all demolition materials.

1.2 Purpose/End Application: The Refuge acquired the Martin House from previous landowners when it purchased the land. The house is no longer liveable due to major foundation shifting/cracking, plumbing leaks, and other issues. After the house has been demolished, the site will be used to build new shared housing units for seasonal employees.

1.3 Contractor Qualifications: The Contractor shall be licensed in accordance with State of Texas requirements, as applicable.

1.4 Other: N/A

2. Place of Performance and Period of Performance

2.1 Place of Performance: Balcones Canyonlands National Wildlife Refuge, 24518 E FM 1431, Marble Falls, TX 78654-4096

2.2 Performance start and end date: The performance start date will be determined as soon as possible after the contract has been awarded. The performance end date shall be 30 days from the start date, unless an extension is granted by the Contracting Officer.

2.3 Normal duty hours shall be Monday thru Friday 8:00 a.m. - 4:30 p.m. In the event of emergencies, the Contractor shall provide contact information.

2.4 Non-duty hours include week nights, weekends, and Government holidays (New Year’s Day, Martin Luther King Jr.’s Birthday, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day).

3. Scope

3.1 The Contractor shall be responsible for all equipment and labor required to demolish the Martin House. The entire building structure shall be demolished, and the concrete foundation and all concrete footings shall also be demolished. All materials from the demolition (e.g., wood, metal, limestone, concrete, etc.) shall be loaded for transport and removed off-Refuge for proper disposal. This can be accomplished by using dumpster rentals or other means approved by the Refuge. The Contractor shall be responsible for all rental, transportation, and disposal fees for this work. The Martin House is connected to a water well and septic system, and the Contractor shall cut and cap the water and sewer services to the house. The electricity has already been properly disconnected from the house. The work site is easily accessible from a gravel road, which should be stable enough during normal conditions for equipment and dumpster transport.

4. Deliverables and/or Delivery Schedule:

4.1 The final deliverable will be a clean building site with all demolition materials from the Martin House properly disposed of. This work shall be completed during the outlined period of performance.

5. Data Management Plan (DMP)

5.1 N/A

6. Government-Furnished Equipment (GFE) / Government-Furnished Information

(GFI)

6.1 N/A

7. Evaluation and Acceptance

7.1 The contractor will be evaluated as detailed herein. Government acceptance shall be contingent upon completion of the demolition/clean-up and a complete walk-through with an authorized Government Representative to verify and inspect the work.

8. Quality Control/Quality Assurance:

8.1 Where appropriate, QC will be maintained according to industry standards and made available to the agency with the contractor’s proposal. The Contractor shall be fully licensed, certified, and qualified to complete the job and will follow all Quality Control Standards. The preferred vendor will have completed similar jobs. Technical Coordinator Cixto Saucedo will verify final product/service for quality assurance/completion.

8.2 Technical Coordinator Cixto Saucedo will oversee the job and be on-site and available for guidance/assistance needed while the work is being performed.

STATEMENT OF WORK (2025 02 19)
1. General:
2. Place of Performance and Period of Performance
2.1 Place of Performance: Balcones Canyonlands National Wildlife Refuge, 24518 E FM 1431, Marble Falls, TX 78654-4096
2.2 Performance start and end date: The performance start date will be determined as soon as possible after the contract has been awarded. The performance end date shall be 30 days from the start date, unless an extension is granted by the Contractin...
2.3 Normal duty hours shall be Monday thru Friday 8:00 a.m. - 4:30 p.m. In the event of emergencies, the Contractor shall provide contact information.
2.4 Non-duty hours include week nights, weekends, and Government holidays (New Year’s Day, Martin Luther King Jr.’s Birthday, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day).
3. Scope
4. Deliverables and/or Delivery Schedule:

File details come from the government source that posted it. Updated .