Attch1_SOWv4_ESRFmar29_2024.pdf

PDF 295 KB Posted

Attached to
TN DALE HOLLOW NFH FISH REARING BUILDING
Solicitation number
140FC124R0045
Issued by

About this file

This document is a Statement of Work (SOW) for the construction of an enclosed fish rearing building at the Dale Hollow National Fish Hatchery in Tennessee. The project has a fixed budget and involves a value-based bid selection process by multiple agencies. The core specifications include a 4,000 square foot metal building with post frame construction, concrete slab, insulation, windows, and doors. Preferred specifications include color schemes and materials that are resistant to weathering. Customization options are available but not required. The project has a target completion date of November 2024, and the delivery and installation location is the Dale Hollow National Fish Hatchery. The related federal contract opportunity, Solicitation Number 140FC124R0045, is for the same fish rearing building project with a value between $100,000 and $250,000.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Enclosed fish rearing building

VALUE BASED BID SELECTION

Dale Hollow National Fish Hatchery

March 29, 2024

1. GENERAL: Dale Hollow National Fish Hatchery provides aquatic/biological mitigation of Tennessee Valley Authority and U.S. Army Corps of Engineers water development projects in the Southeast and supports USFWS national conservation efforts for threatened/endangered/at-risk species. The hatchery is currently working rearing Fundulus julisia (Barrens Topminnows) in a 24x30 prefab metal shed separated from the primary hatchery facility by a short drive. The Barrens topminnow recovery efforts have grown and the best way to continue to advance the effort is to replace the temporary shed with a similar shed located as close as reasonable to the primary rearing areas of the hatchery.

BACKGROUND: Dale Hollow National Fish Hatchery and Tennessee Ecological Services Field Office is requesting a metal building with installation with BEST VALUE SELECTION CRITERIA.We have a fixed budget with core building components and optional additions that are cost dependent. This project involves multiple agencies and stations that will meet to review bid proposals and make selections based on core building cost and collaborative optional feature selection determinations contingent on funding.

2. SCOPE: Erect a building with the following core criteria I. Core specifications:

1. Build quality: Permits are not required for this construction, but the building must be built to meet TN minimal codes of 90mph gust wind speed with selection consideration given to higher wind ratings like 130mph

2. Enclosed building with metal siding/roof and post frame construction

3. Concrete slab 4” with rebar/wire reinforcement, please provide psi rating/footing/turn-down information

4. Dimension targets

• 4,000 square feet is a primary goal for this project with consideration for value and cost.

- Target Width 50 ft (40 ft min)

- Target Length 80 ft

• Target Height 20 ft

- If there is a cost efficient build to provide 16’or more height throughout the building, that is the preferred, but not required end result

- The fish rearing systems need enough room to store gravity feed water (at the centerline: 14 ft min).

5. Insulation: preference given for type and R-value

• (min R9 and max R17)

6. Windows: Rearing endangered species will require some natural light.

• Target 1 window per 10’ of open wall (lengthwise)

• Please include a base bid of 16 windows at 3’ square or larger

VALUE BASED BID SELECTION

Dale Hollow National Fish Hatchery

March 29, 2024

7. Three walk-in doors with windows (36” width)

8. Two garage doors

• Minimum: 12x14 insulated

II. General preferred specs

1. Colors (themed to blend in with hatchery beauty)

• Forest green wainscoting

• Brown wall color

• Forest green roof

• Forest green trim

2. Materials: Metal, treated wood, galvanized/aluminum (minimize bug, rot, corrosion)

III. Customization cost: Customization is not required but adds value to bid selection criteria. The most important determination is meeting target specifications and overall price. If customization is available with the winning bidder, final building form selection may be determined cooperatively between the contractor and the station with contracting officer approval as long as the minimum design specifications are met.

1. Potential Customizable Features include (please include feature price per unit, if available):

• Numbers of doors/windows

• Increased insulation

- Highest selection consideration for insulation is given for cost effective partial insulation, but some slight selection consideration to higher r-value and insulation quality specifically for a metal building.

• Expanded building square feet (cost per additional sq ft)

• Building height

• Slab

- Value add possibilities: 6” slab and perimeter pour

3. PLACE/DELIVERY AND PERIOD OF PERFORMANCE:

The order and delivery is flexible with a preferred target completion date by Nov 2024. Contractor’s timeline must be established within 60 days of contract award.

Delivery/installation location:

Dale Hollow National Fish Hatchery 145 Fish Hatchery rd Celina, TN 38551

VALUE BASED BID SELECTION

Dale Hollow National Fish Hatchery

March 29, 2024

4. GOVERNMENT FURNISHED EQUIPMENT OR

MATERIALS/INFORMATION: none planned

5. SPECIAL NOTICE: All project safety and building requirements must meet state and federal OSHA guidance. All buildings must meet state and local building codes. Inspection provided by USFWS contracting office or their designated representative. Permits, gravel, level ground, 811 survey, public restrooms are available along with some limited access to shore power, potable water, and dumpster use.

6. AVAILABILITY: Station delivery hours are 7:00am-3:30pm M-F for public access (excluding federal holidays). Access outside these hours are permitted with contracting officer and station approval (build site is easy/unlimited access)

7. TECHNICAL COORDINATOR/COR:

STATION POINT OF CONTACT:

Thomas Reeves, Project Leader Dale Hollow National Fish Hatchery 145 Fish Hatchery rd Celina, TN 38551 thomas_reeves@fws.gov O: (931) 243-2443 Cell: (360) 362-9255 mailto:thomas_reeves@fws.gov

File details come from the government source that posted it. Updated .