This document is a Statement of Work (SOW) for the construction of a concrete pad at the Town Swamp Unit of the Roanoke River National Wildlife Refuge in Windsor, North Carolina.

The SOW requires the contractor to prepare the ground, pour a 30-foot by 100-foot by 6-inch thick concrete slab using 4,000 psi concrete, and install #4 rebar on 24-inch centers in both directions with 1/2-inch deep expansion joints at 10-foot intervals. The contractor must also remove all leftover material and framing. Prospective bidders are encouraged to visit the site, inspect existing conditions, and make necessary measurements and investigations to develop accurate proposals.

The related federal contract opportunity is Solicitation Number 140FC124Q0015, titled "NC ROANOKE NWR CONCRETE PAD", issued by the Department of the Interior Fish and Wildlife Service.

View the file

Other files

File Type Posted
B03_General_Decision_NC20240069_01052024.txt TXT text file
Sol_140FC124Q0015.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cameron Prairie Fence Replacement (Hurricane Laura) Page 1 of 1

STATEMENT OF WORK

FOR THE

Concrete Pad at Roanoke River National Wildlife Refuge

Town Swamp Tract Windsor, NC 27983

Work Order: F2024578331 11/16/2023

General:

The project consists of all work items required to construct a concrete pad located at the Town Swamp Unit of Roanoke River NWR. The pad will be the base of a future Pole Barn used to house maintenance vehicles and equipment.

The contractor will submit a detailed proposal for all work required to complete the construction outlined within this document and all other documents of this solicitation. Prospective bidders are strongly encouraged to visit the site, inspect existing conditions, review work performance requirements, and make necessary measurements and investigations as may be required to develop accurate proposals.

Create/construct the concrete pad with the following specifications:

- Prepare ground for concrete to be poured; level existing gravel base.

- Pour slab 30 feet wide by 100 feet long by 6 inches thick using 4,000 psi concrete. Use #4 rebar spaced 24 inches on center each way. Cut ¼ inch deep expansion joints at 10 foot grids. Remove all left over material and framing.

General: