Sol_140F0S26Q0004_Amd_0001.pdf

PDF 209 KB Posted

Attached to
NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ
Solicitation number
140F0S26Q0004
Issued by

About this file

This is Amendment 001 to a federal solicitation for the Stillwater Hunter Road Gravel Project issued by the U.S. Fish and Wildlife Service (FWS) Over SAT G/S, effective February 13, 2026. The solicitation number is 140F0S26Q0004, with a period of performance from March 1, 2026 through June 30, 2026. The amendment addresses a Request for Information (RFI) regarding truck delivery spacing and scheduling requirements for gravel material delivery to the project site.

The amendment clarifies that the refuge has flexibility on truck spacing and delivery scheduling, contrary to the original 15-minute minimum interval requirement. Contractors may now coordinate consecutive dumping with refuge staff, and the 15-minute interval is not mandatory throughout the shift but can vary based on site coordination with the project manager. Alternative staging and sequencing methods are acceptable provided safety and site control are maintained. Historical delivery data indicates approximately 800-1,000 tons of gravel per shift using belly dump trucks, with delivery averaging 800-1,000 tons per day across similar past projects. The contractor remains responsible for final delivery coordination with the on-site project manager and ensuring gravel reaches its final location on the designated delivery route. Offerors must acknowledge receipt of this amendment by February 13, 2026.

View the file

Other files

File Type Posted
Sol_140F0S26Q0004_Amd_0002.pdf PDF
Sol_140F0S26Q0004.pdf PDF
B08_-_Solic_140F0S26Q0004_Fallon_NV_Gravel.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

Robert Sung

See continuation page

FWS Over SAT G/S FWS, Over SAT G/S 5275 Leesburg Pike Falls Church VA 22041

F0S

140F0S26Q0004

02/13/2026

02/13/2026

1 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140F0S26Q0004/0001

Stillwater Hunter Road Gravel Project

This amendment is hereby issued to respond to a

RFI Q&A:

Q1: After reviewing this requirement with our subcontractor, we received the following clarification from them:

"If the trucks ran consecutively, they could all dump in sequence, allowing the refuge staff time to work the material before the trucks returned for their second and third trips. The total daily tonnage can be adjusted to suit your needs by increasing or decreasing the number of trucks. We anticipate approximately

800 - 1,000 tons per shift. The material would be delivered using belly dump trains, leaving a window for the refuge staff to spread.

We would revise the proposal to include minimum truck spacing. However, doing so would limit roughly half the trucks to only two loads per day, increasing the cost per ton. Based on this scenario and eight trucks per day, spacing would be approximately 15-30 minutes between loads, followed by about 1.25 hours of downtime between the last truck in the first rotation and the first truck returning for the second rotation. This would result in approximately

800 tons per shift."

Based on this, strict adherence to the minimum

15-minute spacing requirement would materially affect operational efficiency and increase the cost per ton.

We would respectfully like to inquire whether there is any flexibility in the delivery spacing requirement. Specifically:

A. Would consecutive dumping be acceptable if coordinated safely and efficiently with the grading contractor?

B. Is the 15-minute minimum interval mandatory throughout the entire shift, or could it be adjusted during certain delivery windows?

C. Would alternative staging or sequencing methods be considered, provided safety and site control are maintained?

A1: The refuge does have some flexibility on

Continued...

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140F0S26Q0004/0001 the spacing of the trucks and could be coordinated at that time with the project coordinator. During the work day - we will have a refuge staff member who is stationed to take the tickets from drivers and direct them when it is safe to unload. However, we have completed similar projects at least three times in the past 5 years with various contractors.

A 15-minute interval between trucks was generally what they averaged between trucks just based on how long it took the for each load to be filled between the first and the next truck at the gravel pit. Across the projects, delivery has averaged between 800-1k tons per day.

For the specific questions:

A. Yes, consecutive dumping can be coordinated with the refuge staff who will be completing the gravel grading.

B. The 15 minute interval would not be mandatory and could vary throughout the shift, but would need to be coordinated with staff on site.

C. Alternative staging or sequencing methods could be considered, provided safety and site control are maintained. The contractor would be responsible for coordinating with the project manager on site and ultimately would be responsible for ensuring the gravel is delivered to its final location on the delivery route.

Period of Performance: 03/01/2026 to

06/30/2026

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .