Sol_140F0S23Q0021_Amd_0002.pdf

PDF 97 KB Posted

Attached to
DE-PRIME HOOK NWR, Lead Shot Abatement
Solicitation number
140F0S23Q0021
Issued by

View the file

Other files

File Type Posted
Sol_140F0S23Q0021_Amd_0007.pdf PDF
B09_-_ATT_17__-_answers_to_questions_07262023_0007.docx DOCX document
Sol_140F0S23Q0021_Amd_0006.pdf PDF
B09_-_ATT_16__-_answers_to_questions_07212023__0006.docx DOCX document
B09_-_ATT_15__-_answers_to_questions_07202023__0005.pdf PDF
Sol_140F0S23Q0021_Amd_0005.pdf PDF
Sol_140F0S23Q0021_Amd_0004.pdf PDF
B09_-_ATT_13_-_RFI_QA_for_Prime_Hook_removal_action_0714_rev_0004.docx DOCX document
B09_-_ATT_12_-_2017_groundwater_and_surface_water_final_report_V2_-_45_pgs_0004.docx DOCX document
B09_-_ATT_14_-_Price_Sheet_0004.xlsx XLSX spreadsheet
Sol_140F0S23Q0021_Amd_0003.pdf PDF
B09_-_Amend_1_-_Photo_of_Bald_Eagle_Nests_0002.png PNG image
Sol_140F0S23Q0021_Amd_0001.pdf PDF
B08_-_ATT_5_-_DE-1371_BROADKILN_SITE_INSPECTION_AND_RISK_ASSESSMENT_1_-_605_pg.pdf PDF
B08_-_ATT_3_-_BBJ_Treatability_Study_Technical_Memorandum__-_Milton_DE_-_1-19-2021_-_15_pg.pdf PDF
B08_-_ATT_10_-_2017_groundwater_and_surface_water_final_report_-_43_pg.docx DOCX document
B08_-_ATT_1_-_WD_-_MD_-_11_pages.pdf PDF
B08_-_ATT_7_-_Geosyntec_FINAL_Report_FATE_AND_TRANSPORT__5-20-19_-_43_pg.pdf PDF
B08_-_Solic_140F0S23Q0021_-_Prime_Hook_Lead_Abatement_clause_sheet_V3_-_43_pg.pdf PDF
B08_-_ATT_11_-_figures_prime_hook_for_removal_action_-_3_pg.pdf PDF
B08_-_ATT_8_-_CBFOCO0304_Prime_Hook_ERA_-_83_pg.pdf PDF
B08_-_ATT_4_-_Removal_Action_Workplan_-_63_pg.pdf PDF
B08_-_ATT_2_-_Prime_Hook_SOW_-_Lead_Shot_Removal_Work_Plan_rev_12132022_-_5_pg.pdf PDF
B08_-_ATT_6_-_Prime_Hook_EECA_(21DEC2017)_Final_-_redacted_-_589_pg.pdf PDF
B08_-_ATT_9_-_frog_report_2016_dec_13_16_final_-_41_pg.docx DOCX document
Sol_140F0S23Q0021.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140F0S23Q0021 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

F0S

Falls Church VA 22041 5275 Leesburg Pike FWS, Over SAT G/S FWS Over SAT G/S

06/13/20230002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/01/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FWS PRIME HOOK NWR

This amendment is hereby issued to:

1. Replace FAR 52.219-14, Limitations on Subcontracting (Oct 2022) with FAR 52.219-14, Limitations on Subcontracting (Deviation Oct 2022)

2. Provide for RFI Q and A as follows:

Q1. Is a bald eagle nest survey required?

A1. No. The FWS does not have a recent nest site census for the area but historically there have not been eagles nesting there. Attached is a photo that shows the approx. work

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Robert Sung

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140F0S23Q0021/0002 area (red rectangle) in relation to previously known eagle nests (red dots.)

Q2. What type of wetland habitat is preferred after site restoration?

A2. It is not recommend to change the elevations or doing anything creative. The area of digging has minimal or no standing water. It is classified as a forested wetland.

Q3. Is wetland mitigation (per Section 404 of the

Clean Water Act) and associated requirements included as part of the Scope of Work?

A3. Wetland mitigation is not required nor part of the SOW as determined by the EE/CA's

Applicable and Relevant or Appropriate

Requirements (ARARs) analysis.

Activities undertaken entirely on a CERCLA site by authority of CERCLA as approved or required by

EPA are not required to obtain permits under

Section 404 of the Clean Water Act or Section 10 of the Rivers and Harbors Act.

Per the EE/CA ARAR's:

The following conditions/practices must be followed: any structure or fill shall be maintained, including maintenance to ensure public safety; erosion and siltation controls must be used and maintained during construction and all fills must be permanently stabilized at the earliest practicable date; heavy equipment working in wetlands must be placed on mats or other measures must be taken to minimize soil disturbances; no activity conducted under a nationwide permit may jeopardize the continued existence of a threatened or endangered species or a species proposed for designation

Q4· Please confirm that only preparation of the

LTS Plan, and not implementation of the LTS Plan

(e.g., post-remedial groundwater and surface water monitoring) is included as part of the SOW.

If implementation is required, can the Service clarify how many rounds of sampling should be included for planning and budgetary purposes?

A4. Yes only the preparation of the plan. The

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140F0S23Q0021/0002

Service will conduct the monitoring and implementation of the Plan.

Q5. Can the Service confirm what, if any, substantive requirements of the ARARs have already been completed? If so, can the Service share any results/documents from previously completed cultural or archaeological surveys, for example?

A5. The Service is currently in the process of contracting for an Archaeological Survey.

Q6. Can the Service clarify the period of performance?

A6. The performance period should be 18 months from the date of award.

Q7. The spec does not address screening of soils.

In the event that the landfill requires screening, who is responsible for the costs of that screening?

A7. Since the primary concern is metals and this is a site with no history of organic contamination, it is expected that the landfill will only require TCLP analysis. The submission should include a contingency that could add additional funds in case other analyses are required. Please provide this as a separate portion at the end of the price submission.

Q8. The spec calls for treatment of up to 4%

Enviroblend. If more than 4% is required to obtain passing TCLP results, who is responsible for those additional costs?

A8. Based on the Pilot Study, 4% should work but a contingency could be added to cover additional expenses if more is needed, please provide this as a separate portion at the end of the price submission.

Q9. What are the weight restrictions on the roads to the site?

A9. It is the responsibility of the vendor to resolve this.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

4 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140F0S23Q0021/0002

Q10. Will the project require bonding for potential damage to roads?

A10. No bonding is required, however this topic would be an insurance issue to be covered by the vendor's insurance policy.

Period of Performance: 07/10/2023 to 01/10/2025