Sol_140F0920Q0020_Amd_0003.pdf
PDF 94 KB Posted
- Attached to
- VA-CHINCOTEAGUE NWR-WETLAND RESTORATION
- Solicitation number
- 140F0920Q0020
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Answers to questions_0003.pdf | ||
| Sol_140F0920Q0020_Amd_0002.pdf | ||
| Sol_140F0920Q0020_Amd_0001.pdf | ||
| Sol_140F0920Q0020.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140F0920Q0020 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
F09
Falls Church VA 22041-3803
MS: BMO
5275 Leesburg Pike
FWS, DIVISION OF CONTRACTING AND FA
F06
LAKEWOOD CO 80228-1807
134 UNION BOULEVARD
LAKE PLAZA NORTH
FWS, DIVISION OF CONTRACTING AND GE
07/07/20200003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/23/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
POC:
Program Office: Kevin Holcomb, 757-336-6122, ext. 2319, kevin_holcomb@fws.gov
Contract Office: Tonia Ellen, 703-358-2024, Tonia_ellen@fws.gov
The purpose of this Amendment is to provide answers to posting questions.
Legacy Doc #: FWS
Period of Performance: 07/31/2020 to 04/30/2021
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Tonia Ellen
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140F0920Q0020/0003
Is offeror responsible for conducting any biological or cultural studies beyond a wetland delineation and functional assessment, even if required for a permit? No. The FWS has biological and cultural data to address Sec 7 and
Sec 106.
Is any of the proposed wetland restoration project considered compensatory mitigation? No
Please confirm that that the proposed wetland restoration project has met NEPA compliance requirements. Yes It will.
It appears that the proposed wetland restoration project meets the requirements for Nationwide
Permit 27. Obtaining an Individual Permit requires substantially more information and time than a Nationwide Permit. Should the offeror assume that the wetland restoration project does not require an Individual Permit from US Army
Corps of Engineers? We would hope that at NP 27 would be utilized, but until we meet with ACOE we can't assume it will. It is reasonable to think
NP 27 is perfect for this work.
1. What specifically do you want included in our proposal package?
o proposal needs to address items in section III.
SCOPE OF SERVICE REQUIREMENTS
o Highlighting potential permits needed, and issues that the USFWS needs to consider in relation to permit consideration and trust resources or activities that could complicate the permitting. This includes time of year restrictions.
2. Is the contractor to obtain local permits and erosion control plan approvals if it is determined they are needed?
o Yes. They will submit them on the USFWS's behalf.
3. Do the maps that will be provided include detailed design plans that can be used to determine potential wetland impacts after the wetland delineation has been completed?
o More detailed conceptual and 33% designs will be available Late Summer/Fall 2020.
4. Will CNWR cover all permit fees?
o No. The contractor will cover all associated permit fees.
Additional information associated with the attached maps:
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140F0920Q0020/0003
SOW Pond- We anticipate delineating a 50 ft buffer on the tidal side of the marsh (including
100 ft of the existing channel). This would provide room to grade into the impoundment and limit disturbance while reducing impact of sediment. On impoundment side- we anticipate impacting 1.5 acres through filling (within ~260' of the existing berm) of the open water areas to restore tidal marsh vegetation. We would then have a reduced impact of 2.5 acres in the center of the basin, where we would do small scale channel creation to aid in propagating the tide through the lower third of the basin. Impacted areas would be replanted with appropriate vegetation.
Lighthouse Meadow- Very similar to SOW pond but much smaller foot print. 0.60 acres would be directly filled/regraded on inside of impoundment. This extends 85 feet from berm. 0.30 acres could have small hand dug channels created to aid in propagating tide through lower 1/2 to
1/3 of basin. This project is attempting minimize invasive species spread by allowing saltwater to infiltrate the basin reducing Phragmites, thereby preparing the site to become high marsh in the future. We would use hay bails and waddles to create series of weirs in channel and along marsh. No impacts on existing tidal salt marsh expected.
Assateague Channel- Encompasses a 22 acre wetland restoration/creation. We anticipate using
ACOE sand (trucked in for CDF's on the mainland) to create/restore tidal marsh. We would use hay bails as containment during construction (to limit activity, reduce sediment re-mobilization into channel, and protect castles. The castles would become the toe of the marsh (helps to stabilize the newly created marsh. The area would be planted with plugs to speed up recolonization.The new marsh would be contoured into the existing marsh to the SW and NE of area, and along road a small berm would be constructed
(covering the hardened shoreline). Contractor would also need to see what permits would be needed for hauling sand. This could be responsibility of trucking company if contracted out.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .