Sol_140F0920Q0020_Amd_0003.pdf

PDF 94 KB Posted

Attached to
VA-CHINCOTEAGUE NWR-WETLAND RESTORATION
Solicitation number
140F0920Q0020
Issued by

View the file

Other files

File Type Posted
Answers to questions_0003.pdf PDF
Sol_140F0920Q0020_Amd_0002.pdf PDF
Sol_140F0920Q0020_Amd_0001.pdf PDF
Sol_140F0920Q0020.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140F0920Q0020 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

F09

Falls Church VA 22041-3803

MS: BMO

5275 Leesburg Pike

FWS, DIVISION OF CONTRACTING AND FA

F06

LAKEWOOD CO 80228-1807

134 UNION BOULEVARD

LAKE PLAZA NORTH

FWS, DIVISION OF CONTRACTING AND GE

07/07/20200003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/23/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

POC:

Program Office: Kevin Holcomb, 757-336-6122, ext. 2319, kevin_holcomb@fws.gov

Contract Office: Tonia Ellen, 703-358-2024, Tonia_ellen@fws.gov

The purpose of this Amendment is to provide answers to posting questions.

Legacy Doc #: FWS

Period of Performance: 07/31/2020 to 04/30/2021

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Tonia Ellen

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140F0920Q0020/0003

Is offeror responsible for conducting any biological or cultural studies beyond a wetland delineation and functional assessment, even if required for a permit? No. The FWS has biological and cultural data to address Sec 7 and

Sec 106.

Is any of the proposed wetland restoration project considered compensatory mitigation? No

Please confirm that that the proposed wetland restoration project has met NEPA compliance requirements. Yes It will.

It appears that the proposed wetland restoration project meets the requirements for Nationwide

Permit 27. Obtaining an Individual Permit requires substantially more information and time than a Nationwide Permit. Should the offeror assume that the wetland restoration project does not require an Individual Permit from US Army

Corps of Engineers? We would hope that at NP 27 would be utilized, but until we meet with ACOE we can't assume it will. It is reasonable to think

NP 27 is perfect for this work.

1. What specifically do you want included in our proposal package?

o proposal needs to address items in section III.

SCOPE OF SERVICE REQUIREMENTS

o Highlighting potential permits needed, and issues that the USFWS needs to consider in relation to permit consideration and trust resources or activities that could complicate the permitting. This includes time of year restrictions.

2. Is the contractor to obtain local permits and erosion control plan approvals if it is determined they are needed?

o Yes. They will submit them on the USFWS's behalf.

3. Do the maps that will be provided include detailed design plans that can be used to determine potential wetland impacts after the wetland delineation has been completed?

o More detailed conceptual and 33% designs will be available Late Summer/Fall 2020.

4. Will CNWR cover all permit fees?

o No. The contractor will cover all associated permit fees.

Additional information associated with the attached maps:

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140F0920Q0020/0003

SOW Pond- We anticipate delineating a 50 ft buffer on the tidal side of the marsh (including

100 ft of the existing channel). This would provide room to grade into the impoundment and limit disturbance while reducing impact of sediment. On impoundment side- we anticipate impacting 1.5 acres through filling (within ~260' of the existing berm) of the open water areas to restore tidal marsh vegetation. We would then have a reduced impact of 2.5 acres in the center of the basin, where we would do small scale channel creation to aid in propagating the tide through the lower third of the basin. Impacted areas would be replanted with appropriate vegetation.

Lighthouse Meadow- Very similar to SOW pond but much smaller foot print. 0.60 acres would be directly filled/regraded on inside of impoundment. This extends 85 feet from berm. 0.30 acres could have small hand dug channels created to aid in propagating tide through lower 1/2 to

1/3 of basin. This project is attempting minimize invasive species spread by allowing saltwater to infiltrate the basin reducing Phragmites, thereby preparing the site to become high marsh in the future. We would use hay bails and waddles to create series of weirs in channel and along marsh. No impacts on existing tidal salt marsh expected.

Assateague Channel- Encompasses a 22 acre wetland restoration/creation. We anticipate using

ACOE sand (trucked in for CDF's on the mainland) to create/restore tidal marsh. We would use hay bails as containment during construction (to limit activity, reduce sediment re-mobilization into channel, and protect castles. The castles would become the toe of the marsh (helps to stabilize the newly created marsh. The area would be planted with plugs to speed up recolonization.The new marsh would be contoured into the existing marsh to the SW and NE of area, and along road a small berm would be constructed

(covering the hardened shoreline). Contractor would also need to see what permits would be needed for hauling sand. This could be responsibility of trucking company if contracted out.