B09_-_Specifications_Template_1inch_Road_Rock_(Surface)_Aggregate_0001.pdf

PDF 581 KB Posted

Attached to
MO-LOESS BLUFFS NWR-ROADS PROJECT 2
Solicitation number
140F0622Q0135
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

Project:

PR Number:

Item:

1 Product Features

Name of Item: _____________________

_________Manufacturer: ____________

Model Number: _____________________ or approved

Salient Characteristics: Must meet Missouri Department of Transportation Specifications/ Standards for 1" Road Rock (Surface) Aggregate Capabilities: (if applicable): ____________________________

Example:

Name of Item: Utility Trailer Manufacturer: Outlaw

Model Number: 5 x 10 3K Solid Side Aluminum or approved equal Salient Characteristics:

Aluminum bed and sides LED Lights Rear bi-fold ramps

2” Coupler Minimum bed width – 5’6”

Maximum bed width – 6’ Minimum length – 10’ Maximum length – 11’

Minimum of 4 “d” rings in floor

Capabilities (if applicable): This trailer will be used to transport a XXXX

2. Delivery

Prices quoted must be FOB Destination

“F.o.b. destination” means --Free of expense to the Government delivered, on board the carrier’s conveyance, at a specified delivery point where the consignee’s facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and

Supplies shall be delivered to the destination consignee’s wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the

Loes Bluffs NWR Roads Projects

JAO PPR

Rock Quarry

NO DELIVERY REQUIRED REFUGE STAFF WILL PICK UP PRODUCT FROM ROCK QUARRY WITH GOVERNMENT TRUCKS

1" Road Rock (Surface)

1" Road Rock (Surface)

Aggregate

Aggregate jjordan Highlight jjordan Highlight jjordan Highlight contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or “constructive placement” as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including “piggyback”) is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National

Motor Freight Classification for “heavy or bulky freight.” When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested.

If the contractor uses rail carrier or freight forwarder for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery when required, if transfer to truck is required to complete delivery to consignee.

Contractor responsibilities. The contractor shall -- (1)(i) Pack and mark the shipment to comply with contract specifications; or

(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;

(2) Prepare and distribute commercial bills of lading;

(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;

(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;

(5) Furnish a delivery schedule and designate the mode of delivering carrier; and

(6) Pay and bear all charges to the specified point of delivery.

3. Delivery Location:

Product shall be delivered to the following location:

4. Installation:

Prices quoted must include installation. All labor and parts associated with and required for installation are the sole responsibility of the contractor. No assistance or equipment will be provided by the government. Installation shall be completed according to industry standards.

5. Technical Point of Contact (POC):

NO DELIVERY REQUIRED REFUGE STAFF WILL PICK UP PRODUCT FROM ROCK QUARRY WITH GOVERNMENT TRUCKS

JASON GRIFFIN (660) 572-0385

jason_a_griffin@fws.gov

6. Delivery Instructions: N/A

7.0 Customer Specific Delivery requirements: N/A

No Delivery Required Refuge will pick up rock from Quarry

Rock must be made available for pick up at Quarry

- No delivery required. Rock must be made available for pick up at Quarry

File details come from the government source that posted it. Updated .