Amended_Price_Schedule-P0003_0003.pdf
PDF 147 KB Posted
- Attached to
- BEACH MOUSE SURVEY at BON SECOUR NWR Federal contract opportunity
- Solicitation number
- 140F0622Q0075
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PWS_Bon_Secour_FY_22_23_ABM_Sablan_-_JS_Amended_P0003_-_4_1_22_0003.pdf | ||
| Sol_140F0622Q0075_Amd_0003.pdf | ||
| Sol_140F0622Q0075_Amd_0002.pdf | ||
| Sol_140F0622Q0075_Amd_0001.pdf | ||
| Alabama_Beach_Mouse_Survey_-_Revised_Price_Schedule_(1)_0001.pdf | ||
| Alabama_Beach_Mouse_Survey_-_Price_Schedule_(1).pdf | ||
| PWS_Bon_Secour_FY_22_23_ABM_Sablan_-_JS_1-3_8_22.pdf | ||
| Attachment_3_Wage_Determination_WD_2015-5717.pdf | ||
| Sol_140F0622Q0075.pdf | ||
| PAST_EXPERIENCE_REFERENCES.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule – Amended P0003
5.4.3 A line-item cost estimate for this project should be submitted as outlined. The options for 1-12 grids must be provided with preference for the 12-grid preferred option. The alternate options are asked for if the preferred option comes in over or under budget. Please note the mark/recapture survey of ABM will be within 12 predefined grids for 5 consecutive trap nights spread out over the Spring of 2022 and 2023 seasons on the Fort Morgan and Perdue Units of Bon Secour NWR. A minimum of 1 grid must be trapped in the Spring of 2022, with no more than 6 grids trapped in the Spring of 2022, and the remaining grids may be scheduled as per the Contractor’s discretion in the Spring of 2023 for a total of 12 grids trapped over the Spring of 2022 and 2023. (This is the preferred option, but alternate options are provided if the preferred option comes in over or under budget in section 5.3.4). The months that can be trapped in the Spring of 2022 are April through July 11th and the months that can be trapped in the Spring of 2023 are February through May.
Total Number of Grids to be Trapped in the Spring of 2022 and the Spring of
Option Type Grids per Season (ie…for 12 grids there may be 5 grids in the Spring of 2022 and 7 grids in the Spring of 2023)
Total Cost
1 Grid (required) Alternate Option
2 Grids (required) Alternate Option
3 Grids (required) Alternate Option
4 Grids (required) Alternate Option
5 Grids (required) Alternate Option
6 Grids (required) Alternate Option
7 Grids (required) Alternate Option
8 Grids (required) Alternate Option
9 Grids (required) Alternate Option
10 Grids (required) Alternate Option
11 Grids (required) Alternate Option
12 Grids (required) Preferred Option
13 Grids (optional) Alternate Option
14 Grids (optional) Alternate Option
15 Grids (optional) Alternate Option
File details come from the government source that posted it. Updated .