Sol_140F0621Q0044_Amd_0002.pdf

PDF 88 KB Posted

Attached to
21-035 CMR Conference Room Remodel Lewistown, MT
Solicitation number
140F0621Q0044
Issued by

View the file

Other files

File Type Posted
Sol_140F0621Q0044_Amd_0001.pdf PDF
PP_Questionaire.doc DOC document
Sol_140F0621Q0044.pdf PDF
DOL Wage Determination (MT20210031).pdf PDF
Bid Schedule-CMR Lewistown.pdf PDF
Submittals-CMR Lewistown.pdf PDF
Bid Schedule-CMR Lewistown.xlsx XLSX spreadsheet
21-035 Specifications CMR Lewistown HQ Conf Rm.pdf PDF
21-035 DWGS-CMR Lewistown Conf Rm.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140F0621Q0044 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

F06

Lakewood CO 80228-1807

134 UNION BOULEVARD

LAKE PLAZA NORTH

FWS, DIVISION OF CONTRACTING AND GE

04/08/20210002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/08/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment is being issued to address the clarifications listed below and to extend the bid submission due date from 05/20/2021 to 05/21/2021 8:00pm MS.

Please Note: The period of performance will begin after issuance of the notice to proceed and the period of performance is 120 days.

Clarifications:

1. Is steel framing Acceptable?

Clarification: Steel framing is acceptable as an alternative.

2. Can the current rebar from the strip footing be used to incorporate the new column footing?

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Rey F. Aragon

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140F0621Q0044/0002

Clarification: Yes this is acceptable if this is selected: Footing will be 14" deep rather than 10"

3. Are jack columns with 2x12 beams on both sides of the new column run outside the excavated footing areas acceptable?

Clarification: Yes, this is acceptable.

4.Is carpet tile an acceptable alternative over rolled carpet?

Clarification: Yes, Carpet tile is acceptable.

5.Clarification: Through-bolt connections are preferable where possible. If not, use lag bolts as per manufacturer's recommendations.

6.The final height inside the soffit will be less than 9' off finish floor elevation and the ACT ceiling will need to have some room above unless the interior of the higher ceiling is to be gypsum.

Clarification: The ceiling is to be a drop-in ceiling. Place as high as possible while still allowing for the light fixtures, etc.

No other changes or clarifications have been made.