Sol_140F0522Q0017_Amd_0002.pdf
PDF 14 MB Posted
- Attached to
- MT- FUEL TANKS AMENDMENT 2 Federal contract opportunity
- Solicitation number
- 140F0522Q0017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140F0522Q0017_Amd_0001.pdf | ||
| Sol_140F0522Q0017.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140F0522Q0017 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
F05
HADLEY MA 01035-9589
300 WESTGATE CENTER DRIVE
FWS, DIVISION OF CONTRACTING AND GE
12/09/20210002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/01/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Legacy Doc #: FWS
LIST OF CHANGES: SOLICITATION IS BEING AMENDED TO PROVIDED ANSWERS TO VENDOR QUESTIONS AND
TO PROVIDE ADDITIONAL PHOTOS.
Date distributed : 02-DEC-21 changed to 09-DEC-21
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Period of Performance: 12/28/2021 to 02/28/2022
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Tina Baker
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation 140F0522Q0017 Amendment 002
Vendor Questions/Answers
Q1) How much fuel will still be left in the tanks for the contractor to dispose of?
A1: We don't know, but think about 100 gallons per tank.
Q2) Are we to reconnect the existing electrical to the new pumps? If not, where does the electrical contractor have to provide electrical from?
A2: No, that will be part of another contract. Power supply is approximately 70 feet from tanks to building to south where power is.
Q3) Do you have any as-built drawings showing the design of the existing concrete pad?
A3: No.
Q4) Can you provide a satellite image of exactly where the exiting tanks are located on the property?
A4: See below pictures.
Q5) Since a site visit will not be done, can you provide pictures of the general area surrounding the existing tanks?
A5: A site visit was offered for 13 – 14 December in Amendment 001. See below pictures.
Bins to the West
Building to South
View from East
View from South
View from West
File details come from the government source that posted it. Updated .