This document contains questions and answers related to solicitation number 140F0520R0025 to rehabilitate a storage building at the Great Swamp National Wildlife Refuge in New Jersey. The questions and answers provide clarification on project requirements, including that only emergency lighting and exit signs are required, translucent metal roof panels must be replaced with new translucent panels but insulation is not needed in those areas, and the contractor must provide details on the proposed insulation system and means of installation for government review and approval. Drawings of the existing building are attached to help contractors, but no as-built drawings are available. The work does not require submission of an engineer of record to the local building department or obtaining any permits, as it involves property of the U.S. Fish and Wildlife Service.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation: 140F0520R0025 Amendment 1
Questions and Answers to Date: Sep 9, 2020
Question 1; Is the contractor required to provide any lighting apart from the emergency lighting and the exit sign at personnel doors?
--No, only emergency lighting and exit signs at each personnel door are required.
Question 2: Are we supposed to provide translucent metal panels over the insulated portion?
--Replace the existing translucent roof panels with new translucent roof panels. Insulation is not required at the area of the translucent roof panels.
Question 3: Is the contractor required to insulate the bottom cord of the roof trusses?
--The bottom chords do not need insulation, since the roof is to be insulated.
Question 4: What facing is required for the insulation?
--For the insulation installation, the Contractor shall provide the means and methods of the insulation system to be used, for Government review and approval.
Question 5: How is the insulation to be hung on the walls, roof trusses?
--For the insulation installation, the Contractor shall provide the means and methods of the insulation system to be used, for Government review and approval.
Question 6: Is there a preliminary sketch plan available?
--Attached to this Amendment are the drawings referenced.
Question 7: Do you have As-built drawings for the existing building?
--We do not have as built drawings. The Contractor may visit the building site, if they require additional information.
Question 8: Do we have to submit the Engineer on record to the Building department? Do we have to get any permits from the building department?
--You do not have to submit the engineer of record to the building department, this is FWS property and no permits are required from the state.