Bulkhead Repair at Harris Neck NWR
Solicitation number
140F0519Q0114
Issued by

About this file

Revised Statement of Work

View the file

Other files

File Type Posted
Sol_140F0519Q0114_Amd_0001.pdf PDF
Sol_140F0519Q0114.pdf PDF
B03_0040449706_Wage_Rates.pdf PDF
A04_140F0519Q0096_Statement_of_Work.pdf PDF
Notice_to_Offerors.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page | 1

STATEMENT OF-WORK FOR THE

DESIGN AND CONSTRUCTION SERVICES

For Installation of a Helical Anchor Tie Back

System on a Concrete Bulkhead At Harris Neck National Wildlife Refuge

Townsend, Georgia June 26, 2019

1.1 DESCRIPTION OF THE WORK

*See attached plans for wall locations

Base Project:

1. Wall #6 measuring 31’ will receive a new double whaler MC6 x 15.3 galvanized, the double whaler, assembled utilizing an anchoring attachment system from the base plates and/or ogee washers on the whalers extending to “Chance” brand or equivalent helical anchors.

2. The double whaler will be installed 6” below the piling cap and anchored to the wall with “Chance”

SS125 Helical Anchors or equivalent. The lead section will have a single helix 14” diameter. Each tieback should be installed with a 7’ and a 5’ plain extension. The whale will be fastened with a threaded adapter utilizing 1” galvanized threaded rod. All materials shall be constructed of stainless steel or hot dipped galvanized metal. Back fill material will consist of the removed material, if suitable. If the on-site backfill material is not suitable, then the contractor shall supply the material.

3. A total of 6 tiebacks along the 31’ wall will be required.

4. A hole will need to be bored through the concrete to allow the plain extension to pass. The lead helical section can be put in place by a small trench perpendicular to the wall.

5. The tasks performed will be in a confined working environment. If fencing or other infrastructure is removed to complete the tasks, all must be replaced or repaired. In addition, the contractor is responsible for determining if underground utilities or obstructions could interfere with helical anchor installation. If utilities are compromised, repairs are the responsibility of the contractor.

Additive Alternative A

1. Two existing 30’ timber poles will be pulled/removed. Four, new 12” butt 40’ cca poles will be driven to finish elevation of 12.20 or to the top of the existing concrete piling cap. These piling will serve as guide piling for the floating dock.

2. Supply and install an aluminum “L” shaped floating dock measuring 5’ wide x 29’x 14’. Dock should be designed to attach to existing concrete piling measuring 1’6”x1’6” on three points on the 29’ side.

Page | 2

Additive Alternative B

1. Supply and install a free floating boat lift such as the “Hydro Hoist” Harbor Hoist brand or equivalent. This free floating hoist should be specified to handle a 24’ boat ≥6,500 Lbs.

1.2 PROJECT CONTACTS, LOCATIONS AND SITE ACCESS

A. The overall Contract Administration for this contract is the responsibility of the Contracting

Officer (CO). All questions shall be directed to:

Justine Pasiecnik Justine_pasiecnik@fws.gov

B. The work site is located at: Harris Neck National Wildlife Refuge, 5000

Wildlife Drive NE, Townsend, GA 31331.

1.3 QUALITY ASSURANCE

A. Construction activities shall be supervised at all times by a competent superintendent who is deemed acceptable to the Government; authorized to act on the contractor’s behalf; and be present on the job site at all times when contract work is being performed (FAR Clause 52.236-6).

B. Contractor shall be responsible for preparing and implementing Quality Control and Safety Plans for the work activity.

1.4 COORDINATION AND WORK PHASES

A. This work effort will require a collaborative approach to refine the scope of the work and complete the Project. The Service and the contractor will meet at the site to identify and resolve areas of uncertainty in permitting, construction, scheduling and coordination, materials, inspections, acceptance, and close-out requirements.

B. The typical phases of work under this contract will consist of:

1. Phase 1 – Existing Conditions Observation. The contractor will visit the site, meet with Service personnel, and develop an overall understanding of the work, its purpose, use and Service requirements. This will be the time to verify existing layout, physical features, topography, and access.

2. Phase 2 – Submittals. Professionally stamped design and product data submittals on all construction submittals will be required.

3. Phase 3 – Permitting. The Government will be responsible for obtaining applicable Federal, state and local permits.

4. Phase 4 – Construction. This task will be the physical construction of the work in accordance with approved design

Page | 3 documents, including executing effective construction quality control. If necessary, specified sampling and testing services will be performed by certified independent material testing laboratories at the expense of the contractor.

5. Phase 5 – Inspections, Acceptance and Close-Out. Following the completion of construction with final inspection/acceptance by the Service, the contractor shall submit final record drawings

(red lined) to reflect the as-constructed conditions as well as other close-out documents.

1.5 GOVERNMENT FURNISHED MATERIALS AND SERVICES

A. The Government will not provide labor, equipment, materials, utilities, or security.

B. The Service will make site visits for observation of construction progress.

1.6 GENERAL REQUIREMENTS

A. Contractor shall furnish, transport, and install all materials, equipment, labor, and utilities to execute the work.

B. All debris, trash, waste, unused materials, and demolished items associated with the project will be legally disposed of off the island. There will be no burning or burying of debris on the Refuge.

C. Work hours are generally Monday-Friday, 7:00 AM to 5:00 PM. No work shall be performed on

Federal holidays.

D. No overnight occupancy is permitted on the Refuge.

E. Contractor shall coordinate with the Refuge Manager regarding unloading and loading barges or other watercraft at the Refuge.

F. No open fires are permitted on the Refuge.

- End of Statement of Work -