A04_0040452839_SOW.pdf

PDF 540 KB Posted

Attached to
Nulhegan NWR Dumpsters Federal contract opportunity
Solicitation number
140F0519Q0088
Issued by
Department of the Interior Fish and Wildlife Service Region 9 Headquarters

About this file

A04 0040452839 SOW

View the file

Other files for this federal contract opportunity

Other files attached to Nulhegan NWR Dumpsters, newest first.
File Type Posted
B03_140F0519Q0088_Wage_Rates.pdf PDF
Sol_140F0519Q0088.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

DUMPSTER RENTAL AND DISPOSAL

FOR

NULHEGAN NATIONAL WILDLIFE REFUGE

Vermont

PART A -GENERAL INFORMATION AND INSTRUCTIONS

GENERAL DESCRIPTION OF WORK: Provide dumpsters to aid in the disposal of debris from multiple locations in

Island Pond, VT and Colebrook, VT. The dumpsters will be provided for two different types of material, to be separated by refuge staff. The two types of material are; concrete (metal reinforcement not removed ie, clean concrete) and general demolition debris. The debris has been tested and abated for any known hazardous materials.

SITE LOCATIONS:

6413 VT-105, Island Pond, VT (2)

608 Bungy Road, Colebrook, VT (1)

PART B -PERFORMANCE REQUIREMENTS

Dumpsters by material type:

General Demolition Debris (30 yds dumpsters)

Concrete Material (30 yds dumpsters - half full due to weight)

Pricing provided based on the following for Clean Concrete:

1. Per Haul Fee (Fee to include full removal and empty return - ie. swap out)

2. Per Ton Disposal Fee

3. Note: Enter maximum allowable weight per can on bid schedule

Pricing provided based on the following for General Construction Debris Materials:

1. Per Haul Fee (Fee to include full removal and empty return - ie. swap out)

2. Per Ton Disposal Fee

3. Note: Enter maximum allowable weight per can on bid schedule

Dumpsters will be provided on an as needed basis, with no less than two dumpster per material type on the site at one time. Pricing will include all fees and charges associated with dumpster handling - ie. hauling, disposal, permitting (if necessary), etc. The expectation is that all dumpsters necessary to complete the project will be coordinated and completed in less than a two-week period between August 2019 and November 2019.

The material types (concrete or construction debris) are subject to change based on site needs, there may be little to no concrete.

Coordination of deliveries and pickup will be done through refuge staff while the job is being completed. General refuge hours are 8AM - 4PM Monday- Friday. The demolition task is expected to take two weeks or less.

PART C - OTHER PERFORMANCE REQUIREMENTS AND INFORMATION

DOCUMENTATION AND REPORTING: A written ticket will be provided to refuge staff as dumpsters arrive and exit to ensure load counts are accurate. The weights for disposal for general debris will not be known at the time of departure; however, refuge staff will be notified within 24 hours of disposal weights. Sorted materials will be

File details come from the government source that posted it.