BID_SCHEDULE_-_Supawna_Meadows_NWR.pdf

PDF 401 KB Posted

Attached to
Waste Removal Services for Supawna Meadows NWR
Solicitation number
140F0518Q0052
Issued by

About this file

Statement of Work and Bid Schedule

View the file

Other files

File Type Posted
Sol_140F0518Q0052.pdf PDF
B03_140F0518Q0052_Wage_Rates.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEBRIS REMOVAL – DUMPSTER RENTAL AT Supawna Meadows NWR

Statement of Work and Bid Schedule

Rental of dumpsters for debris removal of structures – One house with attached garage and one detached garage/barn.

Address of Site: Supawna Meadows NWR, 1140 Route 49, Pennsville, NJ, 08070

PART A - GENERAL DESCRIPTION OF WORK: Provide dumpsters to aid in the disposal of demolition debris from one wood single family home with attached garage and one detached garage. The dumpsters will be provided for two different types of material, to be separated by refuge staff. The two types of material are; concrete (metal reinforcement not removed ie, clean concrete) and general demolition debris. The structures have been tested and abated for any known hazardous materials. See pictures on additional pages.

PART B - PERFORMANCE REQUIREMENTS

Dumpsters by material type:

General Demolition Debris (30 yds dumpsters)

Concrete Material (30 yds dumpsters - half full due to weight)

Pricing provided based on the following for Clean Concrete:

1. Per Haul Fee

2. Per Ton Disposal Fee

Pricing provided based on the following for General Construction Debris Materials:

1. Per Haul Fee

2. Per Ton Disposal Fee

Dumpsters will be provided on an as needed basis, with no less than two dumpster per material type on the site at one time. Pricing will include all fees and charges associated with dumpster handling - ie.

hauling, disposal, permitting (if necessary), etc. The expectation is that all dumpsters necessary to complete the project will be coordinated and completed in less than a two week period between May

2018 and Sept 2018.

Coordination of deliveries and pickup will be done through refuge staff while the job is being completed.

General refuge hours are 8AM - 4PM Monday - Friday. The demolition task is expected to take two weeks or less.

PART C- OTHER PERFORMANCE REQUIREMENTS AND INFORMATION

DOCUMENTATION AND REPORTING: A written ticket will be provided to refuge staff as dumpsters arrive and exit to ensure load counts are accurate. The weights for disposal for general debris will not be known at the time of departure; however, refuge staff will be notified within 24 hours of disposal weights.

PART D – BID SCHEDULE

Type Per Haul Per Ton Per Week

C&D $______________ $___________________ $___________________

Concrete $______________ $___________________ $___________________

File details come from the government source that posted it.