Sol_140F0422Q0026_Amd_0003.pdf
PDF 89 KB Posted
- Attached to
- HI-MIDWAY SEAWALL REPAIR MATERIAL PURCHA
- Solicitation number
- 140F0422Q0026
About this file
This is an amendment to a solicitation for materials required to repair the seawall on Midway Atoll. The amendment extends the response date to June 15, 2022 for a solicitation seeking armor rock, filter rock, and geotextile fabric for delivery to Midway Atoll by October 27, 2022. Testing is required on the armor rock if previous tests are over 24 months old. The evaluation criteria are technical acceptability of test results or a testing plan, and past performance as assessed through CPARS/FAPIIS. The period of performance is from June 17, 2022 to October 27, 2022. The full and complete unloading of materials must be accomplished by October 27th due to the presence of migratory birds on Midway Atoll after that date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140F0422Q0026 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
F04
Atlanta GA 30345-3310
SUITE 310
1875 CENTURY BOULEVARD
FWS, DIVISION OF CONTRACTING AND GR
05/24/20220003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/24/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Midway Rock, Geotextile Fabric, and Backhaul
This amendment is hereby issued to:
1. Extend the solicitation response date to 6/15/2022.
2. Restate that the evaluation factor in section L para 2.1 is "Evaluation Factor 1 -
Technical Acceptability (to include certificates and testing results or testing plan with delivery plan and past performance)."
3. Restate that the evaluation factor in section M para 2.2 is "Technical Acceptability
Minimum Acceptability Standard for this factor: Vendor will provide results of testing
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Robert Sung
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140F0422Q0026/0003 within the previous 24 months(or a viable plan to perform the test and deliver the Armor Rock by the required date) and the manufacturer's certification for the Geotextile Fabric. Past
Performance will be reviewed by a search in
CPARS/FAPIIS for absence of less than satisfactory ratings in quality and schedule."
4. Restate Rock Armor Specifications section
2.1E, 1st paragraph (PDF page 65 of 71 on the original solicitation) states "ROCK QUALITY
ACCEPTANCE. All rock will be accepted or rejected based on test results and visual geologic examination by the ENGINEER. Test results shall be furnished to the ENGINEER a minimum of 30 days prior to any transportation of rock. Previous tests for an existing quarry dated within 24 months of contract are acceptable." Rock will have to be tested prior to shipment to meet the this spec if the previous test is older than 24 months.
5. Reaffirm that the full delivery and complete unloading must happen by the stated date of
10/27/2022. Migratory birds that arrive on
Midway make it extremely difficult to unload and place riprap past the stated date window.
Period of Performance: 06/17/2022 to 10/27/2022
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .