Sol_140F0422Q0025_Amd_0001.pdf
PDF 90 KB Posted
- Attached to
- WA-JULIA B. HANSEN REF-RIP RAP Federal contract opportunity
- Solicitation number
- 140F0422Q0025
About this file
This document is an amendment to a solicitation providing additional questions and answers regarding a federal contract opportunity for riprap and aggregate materials for the Julia B. Hansen National Wildlife Refuge on Tenasillahe Island in Oregon. The amendment provides responses to questions on transporting and offloading materials via barge, recommended scenarios for delivering materials to the island, site preparation for heavy equipment, specifications for riprap backing material and aggregate base course material, and responsibility for road damage from transporting materials. The period of performance for the contract is from June 1, 2022 to August 30, 2022. A site visit will be held on May 16, 2022 at the meeting location provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140F0422Q0025_Amd_0003.pdf | ||
| Sol_140F0422Q0025_Amd_0002.pdf | ||
| A06_-_MAP_-_JBH_NWR_Tenasillahe_Island_Rip_RapR1_0001.pdf | ||
| B08_-_140F0422Q0025_-_JBH_NWR_Rip_Rap_-_Solicitation_61_pages.pdf | ||
| Sol_140F0422Q0025.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140F0422Q0025 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
F04
Atlanta GA 30345-3310
SUITE 310
1875 CENTURY BOULEVARD
FWS, DIVISION OF CONTRACTING AND GR
05/09/20220001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/09/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
JBH Tenasillahe Island Rip Rap
This amendment is hereby issued to provide a map and to provide a RFI response as follows:
Q1. Are we able to load trucks on a barge and drive them onto the island with ramps and dump them at specific locations?
A1. There is only one specific location shown on the updated drawings for offloading.
However, if a contractor wants to use trucks offloaded from a barge that is acceptable. If the installation of a ramp requires in water work the contractor is responsible for acquiring necessary approvals, permits and or fees. The overflow area shown requires the
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Robert Sung
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140F0422Q0025/0001 contractor to verify their access (it could be via barge directly or via on land equipment, the contractors means and methods are to be the responsibility of the contractor).
Q2. Can you provide the recommended scenarios to get the materials onto the island?
A2. The delivery of material of the material to the offloading site is to be determined by the contractor. Past projects have utilized barge mounted cranes.
Q3. Do the sites need to be prepped for heavy equipment or are they prepared already? To what degree are the sites ready for unloading?
A3. Past rip rap deliveries have not utilized on island equipment. Heavy equipment has been used on the island, but not large loaded dump trucks have not. The maintenance and restoration of damage to the roads by contractors equipment is the responsibility of the contractor.
Q4. What is the exact size of the riprap backing material you're looking for?
A4. Backing material is to be per ODOT requirements: Riprap Backing Material: Naturally or artificially well grade angular rock with nominal maximum size of 6" and having less than 5 percent passing the 1/4 inch sieve.
Q5. What would be the situation in the event that some of the roads were damaged in the hauling?
Would the contractors be held responsible for damage as a result of transporting the material?
A5. The maintenance and restoration of damage caused by the contractor is the responsibility of the contractor.
Period of Performance: 06/01/2022 to 08/30/2022
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110