2019_Scope_of_Work_Hexazinone_and_Bamboo.docx
DOCX document 1 MB Posted
- Solicitation number
- 140F0419Q0113
About this file
Scope of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140F0419Q0113.pdf | ||
| Wage_Determination.pdf | ||
| Past_Experience_Reference_Form.doc | DOC document | |
| FAR_52_212_3_Offeror_Representations_and_Certifications_Oct_2018.pdf | ||
| Evaluation_Criteria_Vendor_Form.pdf | ||
| Sample_Daily_Report_Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work
Herbicide Applications for Forestry Projects
Carolina Sandhills National Wildlife Refuge Refuge Administrative Office Building 23734 US Highway 1 McBee, SC 29101
GENERAL
The Carolina Sandhills National Wildlife Refuge, McBee, SC, is seeking a qualified contractor for the Scope of Work outlined below. Performance Period is April 15, 2020 through June 15, 2020.
Contractor shall supply all material, labor, transportation, supplies, supervision, and equipment to accomplish the work described below.
Government will supply chemicals related to this Scope of Work.
PURPOSE AND SPECIFICATIONS
PROJECT 1: Herbaceous-layer Enhancement via Turkey-Oak (Quercus laevis) Reduction within Longleaf-pine Uplands
The purpose of this action is to enhance the herbaceous layer by reducing the density of understory turkey oak within selected longleaf-pine uplands.
Understory reduction will be accomplished by applying Velpar (hexazinone) via skidder application to turkey oak stems throughout the designated treatment areas (Map 1).
MAP 1 AREAS
The contractor shall ensure the application rate does not exceed two pounds of active ingredient (hexazinone) per acre while assuring a minimum mortality rate of 75% of treated stems.
The targeted upland-pine treatment areas are listed in Table 1 and locations illustrated in Map 1. The area includes both plantation stands.
Prior to application, the successful bidder and the refuge representative will conduct a coordination meeting to ensure:
1) the herbicide application-area is clearly defined and understood,
2) location of all RCW-trees are known and that the surrounding areas are flagged and avoided by a minimum of 100 feet,
3) equipment is properly calibrated to deliver only the targeted amount,
4) periodic sampling is conducted to ensure the application rate does not exceed two pounds of active ingredient per acre, and
5) sampling results are recorded and communicated to the refuge representative on a daily basis.
Table 1: Target Stands
| Stand Number |
| Acres |
| 18014 |
| 40 |
| 18016 |
| 35 |
| 18099 |
| 40 |
| Total |
| 115 |
PROJECT 2: Treat Invasive Bamboo Patch
The purpose of this action is to treat a patch of invasive bamboo on an approximate 8 acre site.
Contractor will apply via skidder Glyphosate (8%) to 4 acres and Glyphosate (3%) and Arsenal (1.5%) to 4 acres.
The contractor shall ensure the application rate does not exceed label rates per acre while assuring a minimum mortality rate of 75% of treated stems.
The targeted area is shown in Map 2.
MAP 2 PROJECT AREA
Prior to application, the successful bidder and the refuge representative will conduct a coordination meeting to ensure:
1) the herbicide application-area is clearly defined and understood,
2) equipment is properly calibrated to deliver only the targeted amount,
3) periodic sampling is conducted to ensure the application rate does not exceed label rates
4) Sampling results are recorded and communicated to the refuge representative.
SAFETY, HEALTH AND ENVIRONMENTAL COMPLIANCE
In addition to requirements of these specifications, the contractor shall be responsible for meeting all applicable Federal, State, and local laws, and regulations, codes and similar requirements in relation to safety, personal protection, environmental, and transportation compliance with the Statement of Work.
image1.jpg image2.jpg
File details come from the government source that posted it.