Questions_and_Answers_0002.pdf

PDF 87 KB Posted

Attached to
MAKAH NFH DESIGN-BUILD WEIR AND FISH LADDER
Solicitation number
140F0322R0010
Issued by

About this file

This document outlines a federal solicitation for design-build services. The U.S. Fish & Wildlife Service is seeking a firm fixed price design-build contract between $1,000,000 to $5,000,000 to develop construction drawings, specifications, and perform selective demolition and construction work for modifications to a barrier weir and fish ladder. The NAICS code is 238990 and the small business size standard is $39.5 million. The evaluation criteria are technical capability, past experience, and past performance. A two-phase selection process will be used, with Phase I evaluating technical qualifications and Phase II evaluating price proposals from finalists. The performance period is expected to begin within 10 days of notice and be complete by December 31, 2023. The solicitation is a total small business set-aside, and proposals are due by August 1, 2022. Interested contractors must be registered in SAM.gov and consult the referenced file sharing site for solicitation attachments.

View the file

Other files

File Type Posted
B11_Site_Visit_Sign_In_Sheet_0002.pdf PDF
Sol_140F0322R0010_Amd_0002.pdf PDF
Sol_140F0322R0010_Amd_0001.pdf PDF
Sol_140F0322R0010.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation 140F0322R0010- Questions and Answers

1. Can we include full resumes as an appendix section to supplement Evaluation Factor 1 Technical Capability?

a. The five-page limit stands. If full resumes can be incorporated within the five-page limit, then it is acceptable. Pages submitted beyond the stated limits will not be evaluated.

2. For Factor 2, are we to include five projects total, or are we to provide five projects from the Prime and five projects from the Designer?

a. Five projects total should be submitted.

3. For Factor 3, are we to include past performance information for the projects from the

Prime or from the Prime and the Designer?

a. The evaluation will consider past performance information for the prime and any major subcontractors (Designer).