A04_PWS_8_18_21_Update_Corrected_Version_0003.pdf

PDF 3 MB Posted

Attached to
Finley NWR- Repairs to Irwin Barn
Solicitation number
140F0321Q0051
Issued by

View the file

Other files

File Type Posted
Sol_140F0321Q0051_Amd_0003.pdf PDF
A04_PWS_Updated_8_18_21_0002.docx DOCX document
Sol_140F0321Q0051_Amd_0002.pdf PDF
Section_B_Quote_Schedule_(Updated_8_18_21)_0002.docx DOCX document
A04_PWS_8_4_21_Update_0001.pdf PDF
Sol_140F0321Q0051_Amd_0001.pdf PDF
A04_PWS.pdf PDF
B03_DOL_Wage_Determination.pdf PDF
Sol_140F0321Q0051.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USFWS – PSW for Irwin Barn Soffit and Trim Repairs 1 | P a g e

PERFORMANCE WORK STATEMENT (PWS)

Historic Preservation Specialist- Traditional Carpentry

For Critical Repairs to the Soffit and trim on the Irwin (Cheadle) Barn at

William L. Finley National Wildlife Refuge, Oregon July 12, 2021 Amendment August 4, 2021

PR NUMBER:

1. GENERAL

This is a construction contract to provide historic preservation specialist/traditional carpentry services to be performed at the Irwin Barn, William L. Finley National Wildlife Refuge (NWR), near Monroe, Oregon (Figure 1).

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform historic preservation specialist/traditional carpentry services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract and as defined in the Secretary of the Interior’s Standards for the Treatment of Historic Properties. There is no water, electrical, or sewer facilities on-site.

1.2 Background: The project is to complete repairs to the soffit and trim on the Irwin Barn which entails removing about 3 2ft of fiberglass shingles (see specific details in Section 5). The Irwin Barn was built in 1900 and is listed on the National Register of Historic Places. The age and historical value of the barn requires a contractor with exceptional traditional carpentry skills and experience working with the Secretary of the Interior’s Standards for the Treatment of Historic Properties (SOI Standards).

The Irwin Barn is a 2-story gable roof barn, rectangular in plan it is 48’-8” by 60’-5” (2,949 sq.

ft.). The roof eaves are approximately 21’ above grade. The peak of the gable end is about 40’ above grade. Construction is post and beam with concrete foundation piers. Siding is board and batten with wall vents and sliding metal doors on the gable ends. The roof was recently replaced with asphalt shingles.

The Irwin Barn is in generally good condition. However, an inventory of the interior and exterior elements of the barn was recently completed and the condition of the soffit, frieze, trim and pilasters need attention. The recent inspection identified the new roof was not installed correctly over the east elevation eave, the roof does not extend out far enough to provide protection for the eave trim and soffits. In fact, the trim was removed during roofing and no accommodation was made to reinstall the trim after the roof work was completed. Most of the eave trim was removed and saved on-site, although some pieces are in poor condition. Also noted in the inspection is the delicate condition of the original soffit boards and their unusual size and length which is difficult to match with currently available lumber. Missing trim pieces and pilaster caps are also noted in the condition assessment. The condition assessment report which contains additional description and details will be provided to the chosen contractor.

USFWS – PSW for Irwin Barn Soffit and Trim Repairs 2 | P a g e

1.3 Objectives: The objective of this contract is to hire a contractor with historic preservation and tradition carpentry skills to complete repairs that are necessary to preserve and protect the soffit and original trim materials on the Irwin Barn. All repairs must meet the SOI Standards.

1.4 Scope: The primary activities for this contract focus on modifying the current roof edge along the east gable end to extend the roof so that the trim at the edge can be re-installed to finish the edge and return the barn to its original/historic condition and appearance of this important character-defining feature of the barn.

An option item includes repair to the soffit along the north and south sides of the building.

1.5 Period of Performance:

Work must be completed by the end of the fiscal year 2022 (9/30/2022).. Refuge Manager must be notified at least 48 hours prior to initial arrival on site.

1.6 General Information:

1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS which is defined as the SOI Standards. Government acceptance is contingent upon the inspection and acceptance of the repair work by the FWS.

1.6.2 Quality Assurance: The FWS-CRT will work with contractor to ensure compliance with the SOI Standards. Acceptance of performance will be completed by the FWS-CRT and Finley NWR staff.

1.6.3 Recognized Holidays: Contractor is not required to perform services on holidays.

Government holidays New Year’s Day, Martin Luther King JR.s’s Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving, Christmas Day.

1.6.4 Hours of Operation: Normal duty hours Monday thru Friday 8:00 a.m. - 4:30 p.m. In the event of emergencies, Contractor shall provide contact information. Contractor working on weekends will be considered in order for work to be completed as efficiently as possible.

1.6.5 Place of Performance: Irwin Barn, Finley National Wildlife Refuge.

1.6.6 Type of Contract: Firm-Fixed Price

1.6.7 Security Requirements: N/A

1.6.8 Special Qualifications: Contractor must have a demonstrated track record of completing historic restoration/preservation projects, possess expertise and skill with traditional construction methods, and possess knowledge of nineteenth century construction and materials. Contractor must also have experience following the SOI Standards.

USFWS – PSW for Irwin Barn Soffit and Trim Repairs 3 | P a g e

1.6.9 Post Award Conference/Periodic Progress Meetings: Coordination among FWS-CRT, Finley NWR staff, and contractor is required, to be as efficient as possible.

1.6.10 Contracting Officer Representative (COR): The COR will be identified by separate letter.

1.6.11 Key Personnel: Eddy Pausch, William L. Finley NWR Refuge Manager; Lou Ann Speulda-Drews FWS-CRT.

Eddy Pausch - Refuge Manager (DPL) William L. Finley National Wildlife Refuge Willamette Valley NWR Complex 26208 Finley Refuge Road Corvallis, OR 97333 541-223-2881 cell eddy_pausch@fws.gov

Lou Ann Speulda-Drews, Historian/Historical Archaeologist U.S. Fish and Wildlife Service Cultural Resources Team 1340 Financial Blvd, Suite 234 Reno, NV 89502 Cell: 775-560-1367 Louann_speulda-drews@fws.gov

1.6.12 Identification of Contractor Employees: N/A

1.6.13 Contractor Travel: Travel to Finley NWR, Oregon is necessary.

1.6.14 Other Direct Costs: Contractor will provide all tools to complete work.

1.6.15 Data Rights: The Government has unlimited rights to all documents/material produced under this contract, including photographs and photo logs.

1.6.16 Organizational Conflict of Interest: N/A

1.6.17 Phase in /Phase Out Period: N/A

PART 2

DEFINITIONS AND ACRONYMS:

2. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

mailto:eddy_pausch@fws.gov mailto:Louann_speulda-drews@fws.gov

USFWS – PSW for Irwin Barn Soffit and Trim Repairs 4 | P a g e

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government.

Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S.

Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.13. WORK WEEK. Monday through Friday, unless specified otherwise.

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1 Government will furnish the fiberglass shingle materials to be used to replace the shingles that are removed for this project. Government may furnish a gate key for access to the Irwin Barn for the contractor which will be returned at the completion of the period of work.

USFWS – PSW for Irwin Barn Soffit and Trim Repairs 5 | P a g e

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The Contractor shall furnish all supplies, equipment, facilities, and services required to perform work under this contract that are not listed under Section 3 of this PWS.

PART 5

SPECIFIC TASKS

5. SPECIFIC TASKS:

5.1.

For all options: Digital photographs before, during, and after repairs are required. Photographs will be transmitted to the FWS-CRT prior to the final payment as a deliverable of this contract.

Base Bid: Removing roofing material and replacing missing trim on front (east) gable end. The most recent (2020) roofing failed to provide sufficient overhang at the rakes, to permit re-installation of the trim detail at the roof edge (Figures 2-11). This alters a significant detail of the original exterior. Correcting this condition requires extending the roofing substrate, a process that will require extending the sheathing 3½” 2½” at the east-facing rakes (front of barn). In turn, this requires removal of a portion of every course of shingle at each rake and extending the roofing material 3½” 2½”.

The project is to complete repairs to the soffit and trim on the Irwin Barn which entails removing about 3 ft of fiberglass shingles, adding a section of roof underlayment to extend the roof over the edge of the barn trim by about 3½ ” and repairing the original soffit and trim, replacing/fabricating missing or severely deteriorated trim and soffit boards, painting the new soffit and trim boards with a white primer coat.

To restore the crown molding at the rakes, the shingling will need to be extended 3.5" (direction:

parallel to the ridge) at each rake. In order to accomplish this, the following preparatory steps will be required:

Remove enough roofing shingles to allow the substrate to be extended in order to anchor the crown molding, which will extend an additional 2½” beyond the fascia. This involves removing shingles (24"+), rolling back the roofing felt or membrane, removing the plywood sheathing above the soffit, adding sections of 1x4 between the existing purlins, long enough to reach an inner rafter (for fastening) and extending them to permit anchoring the crown molding beyond the facia. Ply sheathing shall be re-applied, extending to the outer ends of the 1x4s. Then the cornice trim/crown molding can be re-installed along the rake, so that it will meet the trim at the eaves in a mitered joint. The crown molding will be positioned so as to cover the edge of the plywood sheathing and support the shingle edges when roofing materials are replaced.

Repair the original soffit and trim and replace/fabricate missing or severely deteriorated trim and

USFWS – PSW for Irwin Barn Soffit and Trim Repairs 6 | P a g e soffit boards, painting the new soffit and trim boards with a white primer coat.

Shingle replacement will be completed separately and that task and replacement roofing materials are not included in this bid.

Tasks: Remove about 3 ft of the new fiberglass shingles, remove underlayment, remove sheathing to prepare roof for an extension over the edge of the barn trim by about 3½”;

Install sheathing patch and underlayment to extend roof over soffit and trim (addition of about 3½”);

Remove enough roofing shingles to allow the substrate to be extended in order to anchor the crown molding, which will extend an additional 2½” beyond the fascia. This involves removing shingles (24"+), rolling back the roofing felt or membrane, removing the plywood sheathing above the soffit, adding sections of 1x4 between the existing purlins, long enough to reach an inner rafter (for fastening) and extending them to permit anchoring the crown molding beyond the facia. Ply sheathing shall be re-applied, extending to the outer ends of the 1x4s. Then the cornice trim/crown molding can be re-installed along the rake, so that it will meet the trim at the eaves in a mitered joint. The crown molding will be positioned so as to cover the edge of the plywood sheathing and support the shingle edges when roofing materials are replaced.

Install cornice trim, missing/deteriorated boards will be fabricated to match the original; and Paint the new soffit and trim boards with a white primer coat.

Option Item 1: Contractor shall repair the north and south elevation soffits from beneath the existing roof (Figures 12-18). The work may require fabricating new materials, but emphasis is on reusing as much of the original boards as possible. Soffit is attached with machine-cut nails, nails will be collected if not reused in the repair/installation of soffit boards.

Tasks: Repair the original soffit and trim from below, so that roof and sheathing does not need to be removed;

Compromised ends at the mitered joints will require a few soffit boards to be replaced; and Paint the new soffit and trim boards with a white primer coat.

nkoston Cross-Out

USFWS – PSW for Irwin Barn Soffit and Trim Repairs 7 | P a g e

Figure 1. Location of Irwin Barn on USGS 7.5’ Greenberry quadrangle map (1973, photo revised 1982).

USFWS – PSW for Irwin Barn Soffit and Trim Repairs 8 | P a g e

Figure 2. Irwin Barn, all four elevations with new roof (McIlrath 2021).

USFWS – PSW for Irwin Barn Soffit and Trim Repairs 9 | P a g e

Figure 3. Close-up of hay hood and cornice/roof trim prior to new roof (2018).

Figure 4. Front elevation after new roof with no edge trim (McIlrath 2021).

USFWS – PSW for Irwin Barn Soffit and Trim Repairs 10 | P a g e

Figure 5. Northeast corner soffit, showing open corner, roof edge trim at eaves, lack of overhang at rake and missing cornice trim at rake (McIlrath 2021).

Figure 6. East face, south rake showing missing rake trim, split and twisted lower soffit board, missing pilaster cap return, damaged trims at inner corner, missing roof edge trim (McIlrath 2021).

USFWS – PSW for Irwin Barn Soffit and Trim Repairs 11 | P a g e

Figure 7. East face, south rake below hay hood shows uneven overhand beyond rake fascia, no roof edge trim (McIlrath 2021).

Figure 8. South side of hay hood showing missing eave facia and roof edge trim (McIlrath 2021).

USFWS – PSW for Irwin Barn Soffit and Trim Repairs 12 | P a g e

Figure 9. East face, north rake below hay hood, missing and damaged rake trim, missing roof edge trim at hay hood (McIlrath 2021).

2021).

Figure 10. Close-up of pilaster and cap (McIlrath 2021).

USFWS – PSW for Irwin Barn Soffit and Trim Repairs 13 | P a g e

Figure 11. East face, upper portion of south rake below hay hood with soffit and trim boards (McIlrath

2021).

Figure 12. Option 1: North face, showing missing roof edge trim at eaves (McIlrath 2021).

USFWS – PSW for Irwin Barn Soffit and Trim Repairs 14 | P a g e

Figure 13. Option 1: Eave and missing fascia (McIlrath 2021).

Figure 14. Option 1: West face, SW corner, missing pilaster cap and south ledger (McIlrath 2021).

USFWS – PSW for Irwin Barn Soffit and Trim Repairs 15 | P a g e

Figure 15. Option 1: South face and SE corner showing missing roof edge trim at eaves (McIlrath 2021).

Figure 16. Option 1: North soffit from NW corner, showing split and damage (McIlrath 2021).

USFWS – PSW for Irwin Barn Soffit and Trim Repairs 16 | P a g e

Figure 17. Option 1: North side soffit from NW corner, showing damaged fascia, roof edge trim below overhang (McIlrath 2021).

Figure 18. Option 1: Southeast corner, showing soffit under side (McIlrath 2021).

PERFORMANCE WORK STATEMENT (PWS)
PR NUMBER:
2. DEFINITIONS:
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
5. SPECIFIC TASKS: